[ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." }, { "id": 499, "title": "Salt Dome, Brine Building, and Maintenance Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/", "category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural", "filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." }, { "id": 499, "title": "Salt Dome, Brine Building, and Maintenance Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/", "category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural", "filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..." }, { "id": 498, "title": "Linwood Water Tunnel", "linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/", "category": "LiDAR, Structural, Survey, Water Services", "filter": "I&C,Mapping,Scanning,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." }, { "id": 499, "title": "Salt Dome, Brine Building, and Maintenance Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/", "category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural", "filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..." }, { "id": 498, "title": "Linwood Water Tunnel", "linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/", "category": "LiDAR, Structural, Survey, Water Services", "filter": "I&C,Mapping,Scanning,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..." }, { "id": 497, "title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus", "linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/", "category": "Landscape Architecture, Natural Resources, Site Design", "filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." }, { "id": 499, "title": "Salt Dome, Brine Building, and Maintenance Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/", "category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural", "filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..." }, { "id": 498, "title": "Linwood Water Tunnel", "linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/", "category": "LiDAR, Structural, Survey, Water Services", "filter": "I&C,Mapping,Scanning,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..." }, { "id": 497, "title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus", "linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/", "category": "Landscape Architecture, Natural Resources, Site Design", "filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..." }, { "id": 496, "title": "Milwaukee River Flushing Station Foundation Restoration", "linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/", "category": "Landscape Architecture, Site Design, Structural", "filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." }, { "id": 499, "title": "Salt Dome, Brine Building, and Maintenance Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/", "category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural", "filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..." }, { "id": 498, "title": "Linwood Water Tunnel", "linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/", "category": "LiDAR, Structural, Survey, Water Services", "filter": "I&C,Mapping,Scanning,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..." }, { "id": 497, "title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus", "linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/", "category": "Landscape Architecture, Natural Resources, Site Design", "filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..." }, { "id": 496, "title": "Milwaukee River Flushing Station Foundation Restoration", "linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/", "category": "Landscape Architecture, Site Design, Structural", "filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..." }, { "id": 495, "title": "Ishnala Trail Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/", "category": "Structural", "filter": "Bridges", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." }, { "id": 499, "title": "Salt Dome, Brine Building, and Maintenance Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/", "category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural", "filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..." }, { "id": 498, "title": "Linwood Water Tunnel", "linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/", "category": "LiDAR, Structural, Survey, Water Services", "filter": "I&C,Mapping,Scanning,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..." }, { "id": 497, "title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus", "linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/", "category": "Landscape Architecture, Natural Resources, Site Design", "filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..." }, { "id": 496, "title": "Milwaukee River Flushing Station Foundation Restoration", "linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/", "category": "Landscape Architecture, Site Design, Structural", "filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..." }, { "id": 495, "title": "Ishnala Trail Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/", "category": "Structural", "filter": "Bridges", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..." }, { "id": 494, "title": "Glacier Hills Wind Park", "linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/", "category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey", "filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." }, { "id": 499, "title": "Salt Dome, Brine Building, and Maintenance Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/", "category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural", "filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..." }, { "id": 498, "title": "Linwood Water Tunnel", "linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/", "category": "LiDAR, Structural, Survey, Water Services", "filter": "I&C,Mapping,Scanning,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..." }, { "id": 497, "title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus", "linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/", "category": "Landscape Architecture, Natural Resources, Site Design", "filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..." }, { "id": 496, "title": "Milwaukee River Flushing Station Foundation Restoration", "linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/", "category": "Landscape Architecture, Site Design, Structural", "filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..." }, { "id": 495, "title": "Ishnala Trail Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/", "category": "Structural", "filter": "Bridges", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..." }, { "id": 494, "title": "Glacier Hills Wind Park", "linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/", "category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey", "filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..." }, { "id": 493, "title": "Gas Main Replacement", "linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/", "category": "Municipal, Planning, Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." }, { "id": 499, "title": "Salt Dome, Brine Building, and Maintenance Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/", "category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural", "filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..." }, { "id": 498, "title": "Linwood Water Tunnel", "linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/", "category": "LiDAR, Structural, Survey, Water Services", "filter": "I&C,Mapping,Scanning,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..." }, { "id": 497, "title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus", "linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/", "category": "Landscape Architecture, Natural Resources, Site Design", "filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..." }, { "id": 496, "title": "Milwaukee River Flushing Station Foundation Restoration", "linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/", "category": "Landscape Architecture, Site Design, Structural", "filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..." }, { "id": 495, "title": "Ishnala Trail Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/", "category": "Structural", "filter": "Bridges", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..." }, { "id": 494, "title": "Glacier Hills Wind Park", "linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/", "category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey", "filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..." }, { "id": 493, "title": "Gas Main Replacement", "linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/", "category": "Municipal, Planning, Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..." }, { "id": 492, "title": "School District Master Planning", "linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/", "category": "Landscape Architecture, Planning, Site Design, Survey", "filter": "Athletics,Civic,Education,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." }, { "id": 499, "title": "Salt Dome, Brine Building, and Maintenance Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/", "category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural", "filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..." }, { "id": 498, "title": "Linwood Water Tunnel", "linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/", "category": "LiDAR, Structural, Survey, Water Services", "filter": "I&C,Mapping,Scanning,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..." }, { "id": 497, "title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus", "linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/", "category": "Landscape Architecture, Natural Resources, Site Design", "filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..." }, { "id": 496, "title": "Milwaukee River Flushing Station Foundation Restoration", "linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/", "category": "Landscape Architecture, Site Design, Structural", "filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..." }, { "id": 495, "title": "Ishnala Trail Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/", "category": "Structural", "filter": "Bridges", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..." }, { "id": 494, "title": "Glacier Hills Wind Park", "linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/", "category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey", "filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..." }, { "id": 493, "title": "Gas Main Replacement", "linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/", "category": "Municipal, Planning, Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..." }, { "id": 492, "title": "School District Master Planning", "linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/", "category": "Landscape Architecture, Planning, Site Design, Survey", "filter": "Athletics,Civic,Education,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..." }, { "id": 491, "title": "Conveyance Gate Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/", "category": "Electrical, Structural, Water Services", "filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." }, { "id": 499, "title": "Salt Dome, Brine Building, and Maintenance Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/", "category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural", "filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..." }, { "id": 498, "title": "Linwood Water Tunnel", "linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/", "category": "LiDAR, Structural, Survey, Water Services", "filter": "I&C,Mapping,Scanning,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..." }, { "id": 497, "title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus", "linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/", "category": "Landscape Architecture, Natural Resources, Site Design", "filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..." }, { "id": 496, "title": "Milwaukee River Flushing Station Foundation Restoration", "linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/", "category": "Landscape Architecture, Site Design, Structural", "filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..." }, { "id": 495, "title": "Ishnala Trail Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/", "category": "Structural", "filter": "Bridges", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..." }, { "id": 494, "title": "Glacier Hills Wind Park", "linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/", "category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey", "filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..." }, { "id": 493, "title": "Gas Main Replacement", "linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/", "category": "Municipal, Planning, Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..." }, { "id": 492, "title": "School District Master Planning", "linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/", "category": "Landscape Architecture, Planning, Site Design, Survey", "filter": "Athletics,Civic,Education,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..." }, { "id": 491, "title": "Conveyance Gate Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/", "category": "Electrical, Structural, Water Services", "filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..." }, { "id": 490, "title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/", "category": "Electrical, Water Services", "filter": "Buildings,I&C,Power Distribution,Treatment Plant", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." }, { "id": 499, "title": "Salt Dome, Brine Building, and Maintenance Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/", "category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural", "filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..." }, { "id": 498, "title": "Linwood Water Tunnel", "linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/", "category": "LiDAR, Structural, Survey, Water Services", "filter": "I&C,Mapping,Scanning,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..." }, { "id": 497, "title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus", "linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/", "category": "Landscape Architecture, Natural Resources, Site Design", "filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..." }, { "id": 496, "title": "Milwaukee River Flushing Station Foundation Restoration", "linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/", "category": "Landscape Architecture, Site Design, Structural", "filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..." }, { "id": 495, "title": "Ishnala Trail Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/", "category": "Structural", "filter": "Bridges", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..." }, { "id": 494, "title": "Glacier Hills Wind Park", "linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/", "category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey", "filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..." }, { "id": 493, "title": "Gas Main Replacement", "linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/", "category": "Municipal, Planning, Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..." }, { "id": 492, "title": "School District Master Planning", "linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/", "category": "Landscape Architecture, Planning, Site Design, Survey", "filter": "Athletics,Civic,Education,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..." }, { "id": 491, "title": "Conveyance Gate Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/", "category": "Electrical, Structural, Water Services", "filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..." }, { "id": 490, "title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/", "category": "Electrical, Water Services", "filter": "Buildings,I&C,Power Distribution,Treatment Plant", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..." }, { "id": 489, "title": "We Energies Environmental Training", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/", "category": "Environmental, Natural Resources, Power & Energy", "filter": "Erosion Control,Permitting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." }, { "id": 499, "title": "Salt Dome, Brine Building, and Maintenance Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/", "category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural", "filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..." }, { "id": 498, "title": "Linwood Water Tunnel", "linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/", "category": "LiDAR, Structural, Survey, Water Services", "filter": "I&C,Mapping,Scanning,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..." }, { "id": 497, "title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus", "linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/", "category": "Landscape Architecture, Natural Resources, Site Design", "filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..." }, { "id": 496, "title": "Milwaukee River Flushing Station Foundation Restoration", "linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/", "category": "Landscape Architecture, Site Design, Structural", "filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..." }, { "id": 495, "title": "Ishnala Trail Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/", "category": "Structural", "filter": "Bridges", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..." }, { "id": 494, "title": "Glacier Hills Wind Park", "linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/", "category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey", "filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..." }, { "id": 493, "title": "Gas Main Replacement", "linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/", "category": "Municipal, Planning, Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..." }, { "id": 492, "title": "School District Master Planning", "linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/", "category": "Landscape Architecture, Planning, Site Design, Survey", "filter": "Athletics,Civic,Education,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..." }, { "id": 491, "title": "Conveyance Gate Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/", "category": "Electrical, Structural, Water Services", "filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..." }, { "id": 490, "title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/", "category": "Electrical, Water Services", "filter": "Buildings,I&C,Power Distribution,Treatment Plant", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..." }, { "id": 489, "title": "We Energies Environmental Training", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/", "category": "Environmental, Natural Resources, Power & Energy", "filter": "Erosion Control,Permitting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..." }, { "id": 488, "title": "Coal Pile Runoff and Air Quality", "linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/", "category": "Electrical, Power & Energy", "filter": "BIM,Mapping,Scanning,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." }, { "id": 499, "title": "Salt Dome, Brine Building, and Maintenance Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/", "category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural", "filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..." }, { "id": 498, "title": "Linwood Water Tunnel", "linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/", "category": "LiDAR, Structural, Survey, Water Services", "filter": "I&C,Mapping,Scanning,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..." }, { "id": 497, "title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus", "linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/", "category": "Landscape Architecture, Natural Resources, Site Design", "filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..." }, { "id": 496, "title": "Milwaukee River Flushing Station Foundation Restoration", "linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/", "category": "Landscape Architecture, Site Design, Structural", "filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..." }, { "id": 495, "title": "Ishnala Trail Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/", "category": "Structural", "filter": "Bridges", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..." }, { "id": 494, "title": "Glacier Hills Wind Park", "linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/", "category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey", "filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..." }, { "id": 493, "title": "Gas Main Replacement", "linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/", "category": "Municipal, Planning, Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..." }, { "id": 492, "title": "School District Master Planning", "linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/", "category": "Landscape Architecture, Planning, Site Design, Survey", "filter": "Athletics,Civic,Education,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..." }, { "id": 491, "title": "Conveyance Gate Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/", "category": "Electrical, Structural, Water Services", "filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..." }, { "id": 490, "title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/", "category": "Electrical, Water Services", "filter": "Buildings,I&C,Power Distribution,Treatment Plant", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..." }, { "id": 489, "title": "We Energies Environmental Training", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/", "category": "Environmental, Natural Resources, Power & Energy", "filter": "Erosion Control,Permitting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..." }, { "id": 488, "title": "Coal Pile Runoff and Air Quality", "linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/", "category": "Electrical, Power & Energy", "filter": "BIM,Mapping,Scanning,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..." }, { "id": 487, "title": "General Mitchell International Airport (GMIA) Redundant Feeder", "linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/", "category": "Electrical, Site Design", "filter": "Buildings,Power Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." }, { "id": 499, "title": "Salt Dome, Brine Building, and Maintenance Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/", "category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural", "filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..." }, { "id": 498, "title": "Linwood Water Tunnel", "linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/", "category": "LiDAR, Structural, Survey, Water Services", "filter": "I&C,Mapping,Scanning,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..." }, { "id": 497, "title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus", "linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/", "category": "Landscape Architecture, Natural Resources, Site Design", "filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..." }, { "id": 496, "title": "Milwaukee River Flushing Station Foundation Restoration", "linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/", "category": "Landscape Architecture, Site Design, Structural", "filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..." }, { "id": 495, "title": "Ishnala Trail Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/", "category": "Structural", "filter": "Bridges", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..." }, { "id": 494, "title": "Glacier Hills Wind Park", "linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/", "category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey", "filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..." }, { "id": 493, "title": "Gas Main Replacement", "linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/", "category": "Municipal, Planning, Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..." }, { "id": 492, "title": "School District Master Planning", "linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/", "category": "Landscape Architecture, Planning, Site Design, Survey", "filter": "Athletics,Civic,Education,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..." }, { "id": 491, "title": "Conveyance Gate Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/", "category": "Electrical, Structural, Water Services", "filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..." }, { "id": 490, "title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/", "category": "Electrical, Water Services", "filter": "Buildings,I&C,Power Distribution,Treatment Plant", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..." }, { "id": 489, "title": "We Energies Environmental Training", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/", "category": "Environmental, Natural Resources, Power & Energy", "filter": "Erosion Control,Permitting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..." }, { "id": 488, "title": "Coal Pile Runoff and Air Quality", "linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/", "category": "Electrical, Power & Energy", "filter": "BIM,Mapping,Scanning,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..." }, { "id": 487, "title": "General Mitchell International Airport (GMIA) Redundant Feeder", "linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/", "category": "Electrical, Site Design", "filter": "Buildings,Power Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..." }, { "id": 486, "title": "Zoo Interchange Lighting", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/", "category": "Electrical", "filter": "Lighting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." }, { "id": 499, "title": "Salt Dome, Brine Building, and Maintenance Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/", "category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural", "filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..." }, { "id": 498, "title": "Linwood Water Tunnel", "linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/", "category": "LiDAR, Structural, Survey, Water Services", "filter": "I&C,Mapping,Scanning,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..." }, { "id": 497, "title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus", "linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/", "category": "Landscape Architecture, Natural Resources, Site Design", "filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..." }, { "id": 496, "title": "Milwaukee River Flushing Station Foundation Restoration", "linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/", "category": "Landscape Architecture, Site Design, Structural", "filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..." }, { "id": 495, "title": "Ishnala Trail Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/", "category": "Structural", "filter": "Bridges", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..." }, { "id": 494, "title": "Glacier Hills Wind Park", "linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/", "category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey", "filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..." }, { "id": 493, "title": "Gas Main Replacement", "linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/", "category": "Municipal, Planning, Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..." }, { "id": 492, "title": "School District Master Planning", "linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/", "category": "Landscape Architecture, Planning, Site Design, Survey", "filter": "Athletics,Civic,Education,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..." }, { "id": 491, "title": "Conveyance Gate Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/", "category": "Electrical, Structural, Water Services", "filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..." }, { "id": 490, "title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/", "category": "Electrical, Water Services", "filter": "Buildings,I&C,Power Distribution,Treatment Plant", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..." }, { "id": 489, "title": "We Energies Environmental Training", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/", "category": "Environmental, Natural Resources, Power & Energy", "filter": "Erosion Control,Permitting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..." }, { "id": 488, "title": "Coal Pile Runoff and Air Quality", "linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/", "category": "Electrical, Power & Energy", "filter": "BIM,Mapping,Scanning,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..." }, { "id": 487, "title": "General Mitchell International Airport (GMIA) Redundant Feeder", "linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/", "category": "Electrical, Site Design", "filter": "Buildings,Power Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..." }, { "id": 486, "title": "Zoo Interchange Lighting", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/", "category": "Electrical", "filter": "Lighting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..." }, { "id": 485, "title": "Winnebago Street Roundabout", "linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/", "category": "Landscape Architecture, Transportation", "filter": "Intersection,Local Roads,Reconstruction,Roundabout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." }, { "id": 499, "title": "Salt Dome, Brine Building, and Maintenance Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/", "category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural", "filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..." }, { "id": 498, "title": "Linwood Water Tunnel", "linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/", "category": "LiDAR, Structural, Survey, Water Services", "filter": "I&C,Mapping,Scanning,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..." }, { "id": 497, "title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus", "linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/", "category": "Landscape Architecture, Natural Resources, Site Design", "filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..." }, { "id": 496, "title": "Milwaukee River Flushing Station Foundation Restoration", "linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/", "category": "Landscape Architecture, Site Design, Structural", "filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..." }, { "id": 495, "title": "Ishnala Trail Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/", "category": "Structural", "filter": "Bridges", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..." }, { "id": 494, "title": "Glacier Hills Wind Park", "linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/", "category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey", "filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..." }, { "id": 493, "title": "Gas Main Replacement", "linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/", "category": "Municipal, Planning, Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..." }, { "id": 492, "title": "School District Master Planning", "linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/", "category": "Landscape Architecture, Planning, Site Design, Survey", "filter": "Athletics,Civic,Education,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..." }, { "id": 491, "title": "Conveyance Gate Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/", "category": "Electrical, Structural, Water Services", "filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..." }, { "id": 490, "title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/", "category": "Electrical, Water Services", "filter": "Buildings,I&C,Power Distribution,Treatment Plant", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..." }, { "id": 489, "title": "We Energies Environmental Training", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/", "category": "Environmental, Natural Resources, Power & Energy", "filter": "Erosion Control,Permitting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..." }, { "id": 488, "title": "Coal Pile Runoff and Air Quality", "linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/", "category": "Electrical, Power & Energy", "filter": "BIM,Mapping,Scanning,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..." }, { "id": 487, "title": "General Mitchell International Airport (GMIA) Redundant Feeder", "linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/", "category": "Electrical, Site Design", "filter": "Buildings,Power Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..." }, { "id": 486, "title": "Zoo Interchange Lighting", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/", "category": "Electrical", "filter": "Lighting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..." }, { "id": 485, "title": "Winnebago Street Roundabout", "linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/", "category": "Landscape Architecture, Transportation", "filter": "Intersection,Local Roads,Reconstruction,Roundabout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..." }, { "id": 484, "title": "I-94 North-South Public Involvement GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/", "category": "GIS, Transportation", "filter": "Bridges,Interchange,Interstate,Reconstruction", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." }, { "id": 499, "title": "Salt Dome, Brine Building, and Maintenance Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/", "category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural", "filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..." }, { "id": 498, "title": "Linwood Water Tunnel", "linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/", "category": "LiDAR, Structural, Survey, Water Services", "filter": "I&C,Mapping,Scanning,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..." }, { "id": 497, "title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus", "linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/", "category": "Landscape Architecture, Natural Resources, Site Design", "filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..." }, { "id": 496, "title": "Milwaukee River Flushing Station Foundation Restoration", "linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/", "category": "Landscape Architecture, Site Design, Structural", "filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..." }, { "id": 495, "title": "Ishnala Trail Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/", "category": "Structural", "filter": "Bridges", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..." }, { "id": 494, "title": "Glacier Hills Wind Park", "linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/", "category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey", "filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..." }, { "id": 493, "title": "Gas Main Replacement", "linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/", "category": "Municipal, Planning, Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..." }, { "id": 492, "title": "School District Master Planning", "linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/", "category": "Landscape Architecture, Planning, Site Design, Survey", "filter": "Athletics,Civic,Education,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..." }, { "id": 491, "title": "Conveyance Gate Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/", "category": "Electrical, Structural, Water Services", "filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..." }, { "id": 490, "title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/", "category": "Electrical, Water Services", "filter": "Buildings,I&C,Power Distribution,Treatment Plant", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..." }, { "id": 489, "title": "We Energies Environmental Training", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/", "category": "Environmental, Natural Resources, Power & Energy", "filter": "Erosion Control,Permitting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..." }, { "id": 488, "title": "Coal Pile Runoff and Air Quality", "linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/", "category": "Electrical, Power & Energy", "filter": "BIM,Mapping,Scanning,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..." }, { "id": 487, "title": "General Mitchell International Airport (GMIA) Redundant Feeder", "linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/", "category": "Electrical, Site Design", "filter": "Buildings,Power Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..." }, { "id": 486, "title": "Zoo Interchange Lighting", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/", "category": "Electrical", "filter": "Lighting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..." }, { "id": 485, "title": "Winnebago Street Roundabout", "linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/", "category": "Landscape Architecture, Transportation", "filter": "Intersection,Local Roads,Reconstruction,Roundabout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..." }, { "id": 484, "title": "I-94 North-South Public Involvement GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/", "category": "GIS, Transportation", "filter": "Bridges,Interchange,Interstate,Reconstruction", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..." }, { "id": 483, "title": "Kapur Internal Multi-Office GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/", "category": "GIS", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg", "mbl_crp": "50  ", "region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania", "xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." }, { "id": 499, "title": "Salt Dome, Brine Building, and Maintenance Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/", "category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural", "filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..." }, { "id": 498, "title": "Linwood Water Tunnel", "linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/", "category": "LiDAR, Structural, Survey, Water Services", "filter": "I&C,Mapping,Scanning,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..." }, { "id": 497, "title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus", "linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/", "category": "Landscape Architecture, Natural Resources, Site Design", "filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..." }, { "id": 496, "title": "Milwaukee River Flushing Station Foundation Restoration", "linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/", "category": "Landscape Architecture, Site Design, Structural", "filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..." }, { "id": 495, "title": "Ishnala Trail Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/", "category": "Structural", "filter": "Bridges", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..." }, { "id": 494, "title": "Glacier Hills Wind Park", "linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/", "category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey", "filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..." }, { "id": 493, "title": "Gas Main Replacement", "linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/", "category": "Municipal, Planning, Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..." }, { "id": 492, "title": "School District Master Planning", "linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/", "category": "Landscape Architecture, Planning, Site Design, Survey", "filter": "Athletics,Civic,Education,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..." }, { "id": 491, "title": "Conveyance Gate Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/", "category": "Electrical, Structural, Water Services", "filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..." }, { "id": 490, "title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/", "category": "Electrical, Water Services", "filter": "Buildings,I&C,Power Distribution,Treatment Plant", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..." }, { "id": 489, "title": "We Energies Environmental Training", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/", "category": "Environmental, Natural Resources, Power & Energy", "filter": "Erosion Control,Permitting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..." }, { "id": 488, "title": "Coal Pile Runoff and Air Quality", "linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/", "category": "Electrical, Power & Energy", "filter": "BIM,Mapping,Scanning,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..." }, { "id": 487, "title": "General Mitchell International Airport (GMIA) Redundant Feeder", "linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/", "category": "Electrical, Site Design", "filter": "Buildings,Power Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..." }, { "id": 486, "title": "Zoo Interchange Lighting", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/", "category": "Electrical", "filter": "Lighting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..." }, { "id": 485, "title": "Winnebago Street Roundabout", "linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/", "category": "Landscape Architecture, Transportation", "filter": "Intersection,Local Roads,Reconstruction,Roundabout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..." }, { "id": 484, "title": "I-94 North-South Public Involvement GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/", "category": "GIS, Transportation", "filter": "Bridges,Interchange,Interstate,Reconstruction", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..." }, { "id": 483, "title": "Kapur Internal Multi-Office GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/", "category": "GIS", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg", "mbl_crp": "50  ", "region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania", "xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..." }, { "id": 482, "title": "Lakeshore Lateral Pipeline GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/", "category": "GIS, Power & Energy, Survey, UAV", "filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." }, { "id": 499, "title": "Salt Dome, Brine Building, and Maintenance Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/", "category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural", "filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..." }, { "id": 498, "title": "Linwood Water Tunnel", "linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/", "category": "LiDAR, Structural, Survey, Water Services", "filter": "I&C,Mapping,Scanning,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..." }, { "id": 497, "title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus", "linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/", "category": "Landscape Architecture, Natural Resources, Site Design", "filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..." }, { "id": 496, "title": "Milwaukee River Flushing Station Foundation Restoration", "linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/", "category": "Landscape Architecture, Site Design, Structural", "filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..." }, { "id": 495, "title": "Ishnala Trail Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/", "category": "Structural", "filter": "Bridges", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..." }, { "id": 494, "title": "Glacier Hills Wind Park", "linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/", "category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey", "filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..." }, { "id": 493, "title": "Gas Main Replacement", "linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/", "category": "Municipal, Planning, Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..." }, { "id": 492, "title": "School District Master Planning", "linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/", "category": "Landscape Architecture, Planning, Site Design, Survey", "filter": "Athletics,Civic,Education,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..." }, { "id": 491, "title": "Conveyance Gate Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/", "category": "Electrical, Structural, Water Services", "filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..." }, { "id": 490, "title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/", "category": "Electrical, Water Services", "filter": "Buildings,I&C,Power Distribution,Treatment Plant", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..." }, { "id": 489, "title": "We Energies Environmental Training", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/", "category": "Environmental, Natural Resources, Power & Energy", "filter": "Erosion Control,Permitting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..." }, { "id": 488, "title": "Coal Pile Runoff and Air Quality", "linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/", "category": "Electrical, Power & Energy", "filter": "BIM,Mapping,Scanning,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..." }, { "id": 487, "title": "General Mitchell International Airport (GMIA) Redundant Feeder", "linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/", "category": "Electrical, Site Design", "filter": "Buildings,Power Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..." }, { "id": 486, "title": "Zoo Interchange Lighting", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/", "category": "Electrical", "filter": "Lighting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..." }, { "id": 485, "title": "Winnebago Street Roundabout", "linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/", "category": "Landscape Architecture, Transportation", "filter": "Intersection,Local Roads,Reconstruction,Roundabout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..." }, { "id": 484, "title": "I-94 North-South Public Involvement GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/", "category": "GIS, Transportation", "filter": "Bridges,Interchange,Interstate,Reconstruction", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..." }, { "id": 483, "title": "Kapur Internal Multi-Office GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/", "category": "GIS", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg", "mbl_crp": "50  ", "region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania", "xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..." }, { "id": 482, "title": "Lakeshore Lateral Pipeline GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/", "category": "GIS, Power & Energy, Survey, UAV", "filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..." }, { "id": 481, "title": "Schlitz Park Brewtown Square", "linkz": "https:\/\/kapurengineers.com\/case-studies\/schlitz-park-brewtown-square\/", "category": "Landscape Architecture, Site Design", "filter": "Corporate,Green Space,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5144.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Undeveloped property in downtown Milwaukee is at a premium. Without room for urban expansion, out-of-the-box alternatives are necessary to develop this area of the city. ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." }, { "id": 499, "title": "Salt Dome, Brine Building, and Maintenance Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/", "category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural", "filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..." }, { "id": 498, "title": "Linwood Water Tunnel", "linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/", "category": "LiDAR, Structural, Survey, Water Services", "filter": "I&C,Mapping,Scanning,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..." }, { "id": 497, "title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus", "linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/", "category": "Landscape Architecture, Natural Resources, Site Design", "filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..." }, { "id": 496, "title": "Milwaukee River Flushing Station Foundation Restoration", "linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/", "category": "Landscape Architecture, Site Design, Structural", "filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..." }, { "id": 495, "title": "Ishnala Trail Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/", "category": "Structural", "filter": "Bridges", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..." }, { "id": 494, "title": "Glacier Hills Wind Park", "linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/", "category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey", "filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..." }, { "id": 493, "title": "Gas Main Replacement", "linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/", "category": "Municipal, Planning, Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..." }, { "id": 492, "title": "School District Master Planning", "linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/", "category": "Landscape Architecture, Planning, Site Design, Survey", "filter": "Athletics,Civic,Education,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..." }, { "id": 491, "title": "Conveyance Gate Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/", "category": "Electrical, Structural, Water Services", "filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..." }, { "id": 490, "title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/", "category": "Electrical, Water Services", "filter": "Buildings,I&C,Power Distribution,Treatment Plant", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..." }, { "id": 489, "title": "We Energies Environmental Training", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/", "category": "Environmental, Natural Resources, Power & Energy", "filter": "Erosion Control,Permitting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..." }, { "id": 488, "title": "Coal Pile Runoff and Air Quality", "linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/", "category": "Electrical, Power & Energy", "filter": "BIM,Mapping,Scanning,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..." }, { "id": 487, "title": "General Mitchell International Airport (GMIA) Redundant Feeder", "linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/", "category": "Electrical, Site Design", "filter": "Buildings,Power Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..." }, { "id": 486, "title": "Zoo Interchange Lighting", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/", "category": "Electrical", "filter": "Lighting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..." }, { "id": 485, "title": "Winnebago Street Roundabout", "linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/", "category": "Landscape Architecture, Transportation", "filter": "Intersection,Local Roads,Reconstruction,Roundabout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..." }, { "id": 484, "title": "I-94 North-South Public Involvement GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/", "category": "GIS, Transportation", "filter": "Bridges,Interchange,Interstate,Reconstruction", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..." }, { "id": 483, "title": "Kapur Internal Multi-Office GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/", "category": "GIS", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg", "mbl_crp": "50  ", "region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania", "xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..." }, { "id": 482, "title": "Lakeshore Lateral Pipeline GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/", "category": "GIS, Power & Energy, Survey, UAV", "filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..." }, { "id": 481, "title": "Schlitz Park Brewtown Square", "linkz": "https:\/\/kapurengineers.com\/case-studies\/schlitz-park-brewtown-square\/", "category": "Landscape Architecture, Site Design", "filter": "Corporate,Green Space,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5144.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Undeveloped property in downtown Milwaukee is at a premium. Without room for urban expansion, out-of-the-box alternatives are necessary to develop this area of the city. ..." }, { "id": 480, "title": "Milwaukee School of Engineering (MSOE) Athletic Complex", "linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-school-of-engineering-msoe-athletic-complex\/", "category": "Landscape Architecture, Site Design", "filter": "Athletics,Education,Mixed Use", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Pocket-Park-scaled.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When MSOE dreamed of a state-of-the-art athletic facility, Drs. Robert and Patricia Kern met the challenge by providing funds to acquire the land for the ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." }, { "id": 499, "title": "Salt Dome, Brine Building, and Maintenance Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/", "category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural", "filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..." }, { "id": 498, "title": "Linwood Water Tunnel", "linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/", "category": "LiDAR, Structural, Survey, Water Services", "filter": "I&C,Mapping,Scanning,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..." }, { "id": 497, "title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus", "linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/", "category": "Landscape Architecture, Natural Resources, Site Design", "filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..." }, { "id": 496, "title": "Milwaukee River Flushing Station Foundation Restoration", "linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/", "category": "Landscape Architecture, Site Design, Structural", "filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..." }, { "id": 495, "title": "Ishnala Trail Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/", "category": "Structural", "filter": "Bridges", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..." }, { "id": 494, "title": "Glacier Hills Wind Park", "linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/", "category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey", "filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..." }, { "id": 493, "title": "Gas Main Replacement", "linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/", "category": "Municipal, Planning, Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..." }, { "id": 492, "title": "School District Master Planning", "linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/", "category": "Landscape Architecture, Planning, Site Design, Survey", "filter": "Athletics,Civic,Education,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..." }, { "id": 491, "title": "Conveyance Gate Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/", "category": "Electrical, Structural, Water Services", "filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..." }, { "id": 490, "title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/", "category": "Electrical, Water Services", "filter": "Buildings,I&C,Power Distribution,Treatment Plant", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..." }, { "id": 489, "title": "We Energies Environmental Training", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/", "category": "Environmental, Natural Resources, Power & Energy", "filter": "Erosion Control,Permitting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..." }, { "id": 488, "title": "Coal Pile Runoff and Air Quality", "linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/", "category": "Electrical, Power & Energy", "filter": "BIM,Mapping,Scanning,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..." }, { "id": 487, "title": "General Mitchell International Airport (GMIA) Redundant Feeder", "linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/", "category": "Electrical, Site Design", "filter": "Buildings,Power Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..." }, { "id": 486, "title": "Zoo Interchange Lighting", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/", "category": "Electrical", "filter": "Lighting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..." }, { "id": 485, "title": "Winnebago Street Roundabout", "linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/", "category": "Landscape Architecture, Transportation", "filter": "Intersection,Local Roads,Reconstruction,Roundabout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..." }, { "id": 484, "title": "I-94 North-South Public Involvement GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/", "category": "GIS, Transportation", "filter": "Bridges,Interchange,Interstate,Reconstruction", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..." }, { "id": 483, "title": "Kapur Internal Multi-Office GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/", "category": "GIS", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg", "mbl_crp": "50  ", "region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania", "xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..." }, { "id": 482, "title": "Lakeshore Lateral Pipeline GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/", "category": "GIS, Power & Energy, Survey, UAV", "filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..." }, { "id": 481, "title": "Schlitz Park Brewtown Square", "linkz": "https:\/\/kapurengineers.com\/case-studies\/schlitz-park-brewtown-square\/", "category": "Landscape Architecture, Site Design", "filter": "Corporate,Green Space,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5144.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Undeveloped property in downtown Milwaukee is at a premium. Without room for urban expansion, out-of-the-box alternatives are necessary to develop this area of the city. ..." }, { "id": 480, "title": "Milwaukee School of Engineering (MSOE) Athletic Complex", "linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-school-of-engineering-msoe-athletic-complex\/", "category": "Landscape Architecture, Site Design", "filter": "Athletics,Education,Mixed Use", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Pocket-Park-scaled.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When MSOE dreamed of a state-of-the-art athletic facility, Drs. Robert and Patricia Kern met the challenge by providing funds to acquire the land for the ..." }, { "id": 479, "title": "Village of Darien GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/village-of-darien-gis\/", "category": "GIS, Municipal, Survey", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/darien3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur is the\u00a0primary provider of engineering services for the Village of Darien. When Kapur was\u00a0awarded its first street reconstruction project with the Village of Darien ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." }, { "id": 499, "title": "Salt Dome, Brine Building, and Maintenance Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/", "category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural", "filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..." }, { "id": 498, "title": "Linwood Water Tunnel", "linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/", "category": "LiDAR, Structural, Survey, Water Services", "filter": "I&C,Mapping,Scanning,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..." }, { "id": 497, "title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus", "linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/", "category": "Landscape Architecture, Natural Resources, Site Design", "filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..." }, { "id": 496, "title": "Milwaukee River Flushing Station Foundation Restoration", "linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/", "category": "Landscape Architecture, Site Design, Structural", "filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..." }, { "id": 495, "title": "Ishnala Trail Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/", "category": "Structural", "filter": "Bridges", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..." }, { "id": 494, "title": "Glacier Hills Wind Park", "linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/", "category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey", "filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..." }, { "id": 493, "title": "Gas Main Replacement", "linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/", "category": "Municipal, Planning, Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..." }, { "id": 492, "title": "School District Master Planning", "linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/", "category": "Landscape Architecture, Planning, Site Design, Survey", "filter": "Athletics,Civic,Education,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..." }, { "id": 491, "title": "Conveyance Gate Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/", "category": "Electrical, Structural, Water Services", "filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..." }, { "id": 490, "title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/", "category": "Electrical, Water Services", "filter": "Buildings,I&C,Power Distribution,Treatment Plant", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..." }, { "id": 489, "title": "We Energies Environmental Training", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/", "category": "Environmental, Natural Resources, Power & Energy", "filter": "Erosion Control,Permitting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..." }, { "id": 488, "title": "Coal Pile Runoff and Air Quality", "linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/", "category": "Electrical, Power & Energy", "filter": "BIM,Mapping,Scanning,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..." }, { "id": 487, "title": "General Mitchell International Airport (GMIA) Redundant Feeder", "linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/", "category": "Electrical, Site Design", "filter": "Buildings,Power Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..." }, { "id": 486, "title": "Zoo Interchange Lighting", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/", "category": "Electrical", "filter": "Lighting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..." }, { "id": 485, "title": "Winnebago Street Roundabout", "linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/", "category": "Landscape Architecture, Transportation", "filter": "Intersection,Local Roads,Reconstruction,Roundabout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..." }, { "id": 484, "title": "I-94 North-South Public Involvement GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/", "category": "GIS, Transportation", "filter": "Bridges,Interchange,Interstate,Reconstruction", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..." }, { "id": 483, "title": "Kapur Internal Multi-Office GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/", "category": "GIS", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg", "mbl_crp": "50  ", "region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania", "xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..." }, { "id": 482, "title": "Lakeshore Lateral Pipeline GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/", "category": "GIS, Power & Energy, Survey, UAV", "filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..." }, { "id": 481, "title": "Schlitz Park Brewtown Square", "linkz": "https:\/\/kapurengineers.com\/case-studies\/schlitz-park-brewtown-square\/", "category": "Landscape Architecture, Site Design", "filter": "Corporate,Green Space,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5144.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Undeveloped property in downtown Milwaukee is at a premium. Without room for urban expansion, out-of-the-box alternatives are necessary to develop this area of the city. ..." }, { "id": 480, "title": "Milwaukee School of Engineering (MSOE) Athletic Complex", "linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-school-of-engineering-msoe-athletic-complex\/", "category": "Landscape Architecture, Site Design", "filter": "Athletics,Education,Mixed Use", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Pocket-Park-scaled.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When MSOE dreamed of a state-of-the-art athletic facility, Drs. Robert and Patricia Kern met the challenge by providing funds to acquire the land for the ..." }, { "id": 479, "title": "Village of Darien GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/village-of-darien-gis\/", "category": "GIS, Municipal, Survey", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/darien3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur is the\u00a0primary provider of engineering services for the Village of Darien. When Kapur was\u00a0awarded its first street reconstruction project with the Village of Darien ..." }, { "id": 478, "title": "City of Burlington GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-burlington-gis\/", "category": "GIS, Municipal, Survey", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Burlington_GIS2_Floodplain.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was in the process of collecting data for an old and rudimentary GIS when the City of Burlington decided to upgrade the site. Presented ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." }, { "id": 499, "title": "Salt Dome, Brine Building, and Maintenance Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/", "category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural", "filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..." }, { "id": 498, "title": "Linwood Water Tunnel", "linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/", "category": "LiDAR, Structural, Survey, Water Services", "filter": "I&C,Mapping,Scanning,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..." }, { "id": 497, "title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus", "linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/", "category": "Landscape Architecture, Natural Resources, Site Design", "filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..." }, { "id": 496, "title": "Milwaukee River Flushing Station Foundation Restoration", "linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/", "category": "Landscape Architecture, Site Design, Structural", "filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..." }, { "id": 495, "title": "Ishnala Trail Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/", "category": "Structural", "filter": "Bridges", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..." }, { "id": 494, "title": "Glacier Hills Wind Park", "linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/", "category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey", "filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..." }, { "id": 493, "title": "Gas Main Replacement", "linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/", "category": "Municipal, Planning, Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..." }, { "id": 492, "title": "School District Master Planning", "linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/", "category": "Landscape Architecture, Planning, Site Design, Survey", "filter": "Athletics,Civic,Education,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..." }, { "id": 491, "title": "Conveyance Gate Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/", "category": "Electrical, Structural, Water Services", "filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..." }, { "id": 490, "title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/", "category": "Electrical, Water Services", "filter": "Buildings,I&C,Power Distribution,Treatment Plant", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..." }, { "id": 489, "title": "We Energies Environmental Training", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/", "category": "Environmental, Natural Resources, Power & Energy", "filter": "Erosion Control,Permitting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..." }, { "id": 488, "title": "Coal Pile Runoff and Air Quality", "linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/", "category": "Electrical, Power & Energy", "filter": "BIM,Mapping,Scanning,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..." }, { "id": 487, "title": "General Mitchell International Airport (GMIA) Redundant Feeder", "linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/", "category": "Electrical, Site Design", "filter": "Buildings,Power Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..." }, { "id": 486, "title": "Zoo Interchange Lighting", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/", "category": "Electrical", "filter": "Lighting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..." }, { "id": 485, "title": "Winnebago Street Roundabout", "linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/", "category": "Landscape Architecture, Transportation", "filter": "Intersection,Local Roads,Reconstruction,Roundabout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..." }, { "id": 484, "title": "I-94 North-South Public Involvement GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/", "category": "GIS, Transportation", "filter": "Bridges,Interchange,Interstate,Reconstruction", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..." }, { "id": 483, "title": "Kapur Internal Multi-Office GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/", "category": "GIS", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg", "mbl_crp": "50  ", "region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania", "xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..." }, { "id": 482, "title": "Lakeshore Lateral Pipeline GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/", "category": "GIS, Power & Energy, Survey, UAV", "filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..." }, { "id": 481, "title": "Schlitz Park Brewtown Square", "linkz": "https:\/\/kapurengineers.com\/case-studies\/schlitz-park-brewtown-square\/", "category": "Landscape Architecture, Site Design", "filter": "Corporate,Green Space,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5144.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Undeveloped property in downtown Milwaukee is at a premium. Without room for urban expansion, out-of-the-box alternatives are necessary to develop this area of the city. ..." }, { "id": 480, "title": "Milwaukee School of Engineering (MSOE) Athletic Complex", "linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-school-of-engineering-msoe-athletic-complex\/", "category": "Landscape Architecture, Site Design", "filter": "Athletics,Education,Mixed Use", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Pocket-Park-scaled.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When MSOE dreamed of a state-of-the-art athletic facility, Drs. Robert and Patricia Kern met the challenge by providing funds to acquire the land for the ..." }, { "id": 479, "title": "Village of Darien GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/village-of-darien-gis\/", "category": "GIS, Municipal, Survey", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/darien3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur is the\u00a0primary provider of engineering services for the Village of Darien. When Kapur was\u00a0awarded its first street reconstruction project with the Village of Darien ..." }, { "id": 478, "title": "City of Burlington GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-burlington-gis\/", "category": "GIS, Municipal, Survey", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Burlington_GIS2_Floodplain.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was in the process of collecting data for an old and rudimentary GIS when the City of Burlington decided to upgrade the site. Presented ..." }, { "id": 477, "title": "Zoo Interchange GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-gis\/", "category": "Environmental, GIS, Survey, Transportation", "filter": "Asset Management,Custom Software Tools,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Zoo-Web-GIS-Screen_Utilities_1.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange was a massive project reconstructing the I-94 and I-41 interchange in Milwaukee and Waukesha Counties in Wisconsin. A project this large required ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." }, { "id": 499, "title": "Salt Dome, Brine Building, and Maintenance Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/", "category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural", "filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..." }, { "id": 498, "title": "Linwood Water Tunnel", "linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/", "category": "LiDAR, Structural, Survey, Water Services", "filter": "I&C,Mapping,Scanning,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..." }, { "id": 497, "title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus", "linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/", "category": "Landscape Architecture, Natural Resources, Site Design", "filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..." }, { "id": 496, "title": "Milwaukee River Flushing Station Foundation Restoration", "linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/", "category": "Landscape Architecture, Site Design, Structural", "filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..." }, { "id": 495, "title": "Ishnala Trail Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/", "category": "Structural", "filter": "Bridges", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..." }, { "id": 494, "title": "Glacier Hills Wind Park", "linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/", "category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey", "filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..." }, { "id": 493, "title": "Gas Main Replacement", "linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/", "category": "Municipal, Planning, Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..." }, { "id": 492, "title": "School District Master Planning", "linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/", "category": "Landscape Architecture, Planning, Site Design, Survey", "filter": "Athletics,Civic,Education,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..." }, { "id": 491, "title": "Conveyance Gate Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/", "category": "Electrical, Structural, Water Services", "filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..." }, { "id": 490, "title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/", "category": "Electrical, Water Services", "filter": "Buildings,I&C,Power Distribution,Treatment Plant", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..." }, { "id": 489, "title": "We Energies Environmental Training", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/", "category": "Environmental, Natural Resources, Power & Energy", "filter": "Erosion Control,Permitting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..." }, { "id": 488, "title": "Coal Pile Runoff and Air Quality", "linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/", "category": "Electrical, Power & Energy", "filter": "BIM,Mapping,Scanning,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..." }, { "id": 487, "title": "General Mitchell International Airport (GMIA) Redundant Feeder", "linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/", "category": "Electrical, Site Design", "filter": "Buildings,Power Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..." }, { "id": 486, "title": "Zoo Interchange Lighting", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/", "category": "Electrical", "filter": "Lighting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..." }, { "id": 485, "title": "Winnebago Street Roundabout", "linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/", "category": "Landscape Architecture, Transportation", "filter": "Intersection,Local Roads,Reconstruction,Roundabout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..." }, { "id": 484, "title": "I-94 North-South Public Involvement GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/", "category": "GIS, Transportation", "filter": "Bridges,Interchange,Interstate,Reconstruction", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..." }, { "id": 483, "title": "Kapur Internal Multi-Office GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/", "category": "GIS", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg", "mbl_crp": "50  ", "region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania", "xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..." }, { "id": 482, "title": "Lakeshore Lateral Pipeline GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/", "category": "GIS, Power & Energy, Survey, UAV", "filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..." }, { "id": 481, "title": "Schlitz Park Brewtown Square", "linkz": "https:\/\/kapurengineers.com\/case-studies\/schlitz-park-brewtown-square\/", "category": "Landscape Architecture, Site Design", "filter": "Corporate,Green Space,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5144.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Undeveloped property in downtown Milwaukee is at a premium. Without room for urban expansion, out-of-the-box alternatives are necessary to develop this area of the city. ..." }, { "id": 480, "title": "Milwaukee School of Engineering (MSOE) Athletic Complex", "linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-school-of-engineering-msoe-athletic-complex\/", "category": "Landscape Architecture, Site Design", "filter": "Athletics,Education,Mixed Use", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Pocket-Park-scaled.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When MSOE dreamed of a state-of-the-art athletic facility, Drs. Robert and Patricia Kern met the challenge by providing funds to acquire the land for the ..." }, { "id": 479, "title": "Village of Darien GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/village-of-darien-gis\/", "category": "GIS, Municipal, Survey", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/darien3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur is the\u00a0primary provider of engineering services for the Village of Darien. When Kapur was\u00a0awarded its first street reconstruction project with the Village of Darien ..." }, { "id": 478, "title": "City of Burlington GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-burlington-gis\/", "category": "GIS, Municipal, Survey", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Burlington_GIS2_Floodplain.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was in the process of collecting data for an old and rudimentary GIS when the City of Burlington decided to upgrade the site. Presented ..." }, { "id": 477, "title": "Zoo Interchange GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-gis\/", "category": "Environmental, GIS, Survey, Transportation", "filter": "Asset Management,Custom Software Tools,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Zoo-Web-GIS-Screen_Utilities_1.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange was a massive project reconstructing the I-94 and I-41 interchange in Milwaukee and Waukesha Counties in Wisconsin. A project this large required ..." }, { "id": 476, "title": "We Energies Gas Laterals", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-gas-laterals\/", "category": "GIS, Planning, Power & Energy, Survey", "filter": "Custom Software Tools,Easements,Extranet Applications,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/gis-nwl-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur won the design and survey contract for three separate laterals in Northwest Wisconsin. As part of the design solution, Kapur developed a GIS system ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." }, { "id": 499, "title": "Salt Dome, Brine Building, and Maintenance Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/", "category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural", "filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..." }, { "id": 498, "title": "Linwood Water Tunnel", "linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/", "category": "LiDAR, Structural, Survey, Water Services", "filter": "I&C,Mapping,Scanning,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..." }, { "id": 497, "title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus", "linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/", "category": "Landscape Architecture, Natural Resources, Site Design", "filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..." }, { "id": 496, "title": "Milwaukee River Flushing Station Foundation Restoration", "linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/", "category": "Landscape Architecture, Site Design, Structural", "filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..." }, { "id": 495, "title": "Ishnala Trail Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/", "category": "Structural", "filter": "Bridges", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..." }, { "id": 494, "title": "Glacier Hills Wind Park", "linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/", "category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey", "filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..." }, { "id": 493, "title": "Gas Main Replacement", "linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/", "category": "Municipal, Planning, Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..." }, { "id": 492, "title": "School District Master Planning", "linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/", "category": "Landscape Architecture, Planning, Site Design, Survey", "filter": "Athletics,Civic,Education,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..." }, { "id": 491, "title": "Conveyance Gate Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/", "category": "Electrical, Structural, Water Services", "filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..." }, { "id": 490, "title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/", "category": "Electrical, Water Services", "filter": "Buildings,I&C,Power Distribution,Treatment Plant", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..." }, { "id": 489, "title": "We Energies Environmental Training", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/", "category": "Environmental, Natural Resources, Power & Energy", "filter": "Erosion Control,Permitting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..." }, { "id": 488, "title": "Coal Pile Runoff and Air Quality", "linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/", "category": "Electrical, Power & Energy", "filter": "BIM,Mapping,Scanning,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..." }, { "id": 487, "title": "General Mitchell International Airport (GMIA) Redundant Feeder", "linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/", "category": "Electrical, Site Design", "filter": "Buildings,Power Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..." }, { "id": 486, "title": "Zoo Interchange Lighting", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/", "category": "Electrical", "filter": "Lighting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..." }, { "id": 485, "title": "Winnebago Street Roundabout", "linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/", "category": "Landscape Architecture, Transportation", "filter": "Intersection,Local Roads,Reconstruction,Roundabout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..." }, { "id": 484, "title": "I-94 North-South Public Involvement GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/", "category": "GIS, Transportation", "filter": "Bridges,Interchange,Interstate,Reconstruction", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..." }, { "id": 483, "title": "Kapur Internal Multi-Office GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/", "category": "GIS", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg", "mbl_crp": "50  ", "region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania", "xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..." }, { "id": 482, "title": "Lakeshore Lateral Pipeline GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/", "category": "GIS, Power & Energy, Survey, UAV", "filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..." }, { "id": 481, "title": "Schlitz Park Brewtown Square", "linkz": "https:\/\/kapurengineers.com\/case-studies\/schlitz-park-brewtown-square\/", "category": "Landscape Architecture, Site Design", "filter": "Corporate,Green Space,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5144.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Undeveloped property in downtown Milwaukee is at a premium. Without room for urban expansion, out-of-the-box alternatives are necessary to develop this area of the city. ..." }, { "id": 480, "title": "Milwaukee School of Engineering (MSOE) Athletic Complex", "linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-school-of-engineering-msoe-athletic-complex\/", "category": "Landscape Architecture, Site Design", "filter": "Athletics,Education,Mixed Use", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Pocket-Park-scaled.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When MSOE dreamed of a state-of-the-art athletic facility, Drs. Robert and Patricia Kern met the challenge by providing funds to acquire the land for the ..." }, { "id": 479, "title": "Village of Darien GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/village-of-darien-gis\/", "category": "GIS, Municipal, Survey", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/darien3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur is the\u00a0primary provider of engineering services for the Village of Darien. When Kapur was\u00a0awarded its first street reconstruction project with the Village of Darien ..." }, { "id": 478, "title": "City of Burlington GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-burlington-gis\/", "category": "GIS, Municipal, Survey", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Burlington_GIS2_Floodplain.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was in the process of collecting data for an old and rudimentary GIS when the City of Burlington decided to upgrade the site. Presented ..." }, { "id": 477, "title": "Zoo Interchange GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-gis\/", "category": "Environmental, GIS, Survey, Transportation", "filter": "Asset Management,Custom Software Tools,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Zoo-Web-GIS-Screen_Utilities_1.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange was a massive project reconstructing the I-94 and I-41 interchange in Milwaukee and Waukesha Counties in Wisconsin. A project this large required ..." }, { "id": 476, "title": "We Energies Gas Laterals", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-gas-laterals\/", "category": "GIS, Planning, Power & Energy, Survey", "filter": "Custom Software Tools,Easements,Extranet Applications,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/gis-nwl-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur won the design and survey contract for three separate laterals in Northwest Wisconsin. As part of the design solution, Kapur developed a GIS system ..." }, { "id": 475, "title": "City of Lake Geneva GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-lake-geneva-gis\/", "category": "GIS, Municipal, Survey", "filter": "Custom Software Tools,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LG_DNRMonitoringSitesEx.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Prior to serving as the Engineer of Record for the City of Lake Geneva, we conducted a thorough analysis of the city’s existing GIS structure ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." }, { "id": 499, "title": "Salt Dome, Brine Building, and Maintenance Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/", "category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural", "filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..." }, { "id": 498, "title": "Linwood Water Tunnel", "linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/", "category": "LiDAR, Structural, Survey, Water Services", "filter": "I&C,Mapping,Scanning,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..." }, { "id": 497, "title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus", "linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/", "category": "Landscape Architecture, Natural Resources, Site Design", "filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..." }, { "id": 496, "title": "Milwaukee River Flushing Station Foundation Restoration", "linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/", "category": "Landscape Architecture, Site Design, Structural", "filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..." }, { "id": 495, "title": "Ishnala Trail Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/", "category": "Structural", "filter": "Bridges", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..." }, { "id": 494, "title": "Glacier Hills Wind Park", "linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/", "category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey", "filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..." }, { "id": 493, "title": "Gas Main Replacement", "linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/", "category": "Municipal, Planning, Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..." }, { "id": 492, "title": "School District Master Planning", "linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/", "category": "Landscape Architecture, Planning, Site Design, Survey", "filter": "Athletics,Civic,Education,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..." }, { "id": 491, "title": "Conveyance Gate Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/", "category": "Electrical, Structural, Water Services", "filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..." }, { "id": 490, "title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/", "category": "Electrical, Water Services", "filter": "Buildings,I&C,Power Distribution,Treatment Plant", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..." }, { "id": 489, "title": "We Energies Environmental Training", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/", "category": "Environmental, Natural Resources, Power & Energy", "filter": "Erosion Control,Permitting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..." }, { "id": 488, "title": "Coal Pile Runoff and Air Quality", "linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/", "category": "Electrical, Power & Energy", "filter": "BIM,Mapping,Scanning,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..." }, { "id": 487, "title": "General Mitchell International Airport (GMIA) Redundant Feeder", "linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/", "category": "Electrical, Site Design", "filter": "Buildings,Power Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..." }, { "id": 486, "title": "Zoo Interchange Lighting", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/", "category": "Electrical", "filter": "Lighting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..." }, { "id": 485, "title": "Winnebago Street Roundabout", "linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/", "category": "Landscape Architecture, Transportation", "filter": "Intersection,Local Roads,Reconstruction,Roundabout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..." }, { "id": 484, "title": "I-94 North-South Public Involvement GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/", "category": "GIS, Transportation", "filter": "Bridges,Interchange,Interstate,Reconstruction", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..." }, { "id": 483, "title": "Kapur Internal Multi-Office GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/", "category": "GIS", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg", "mbl_crp": "50  ", "region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania", "xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..." }, { "id": 482, "title": "Lakeshore Lateral Pipeline GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/", "category": "GIS, Power & Energy, Survey, UAV", "filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..." }, { "id": 481, "title": "Schlitz Park Brewtown Square", "linkz": "https:\/\/kapurengineers.com\/case-studies\/schlitz-park-brewtown-square\/", "category": "Landscape Architecture, Site Design", "filter": "Corporate,Green Space,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5144.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Undeveloped property in downtown Milwaukee is at a premium. Without room for urban expansion, out-of-the-box alternatives are necessary to develop this area of the city. ..." }, { "id": 480, "title": "Milwaukee School of Engineering (MSOE) Athletic Complex", "linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-school-of-engineering-msoe-athletic-complex\/", "category": "Landscape Architecture, Site Design", "filter": "Athletics,Education,Mixed Use", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Pocket-Park-scaled.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When MSOE dreamed of a state-of-the-art athletic facility, Drs. Robert and Patricia Kern met the challenge by providing funds to acquire the land for the ..." }, { "id": 479, "title": "Village of Darien GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/village-of-darien-gis\/", "category": "GIS, Municipal, Survey", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/darien3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur is the\u00a0primary provider of engineering services for the Village of Darien. When Kapur was\u00a0awarded its first street reconstruction project with the Village of Darien ..." }, { "id": 478, "title": "City of Burlington GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-burlington-gis\/", "category": "GIS, Municipal, Survey", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Burlington_GIS2_Floodplain.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was in the process of collecting data for an old and rudimentary GIS when the City of Burlington decided to upgrade the site. Presented ..." }, { "id": 477, "title": "Zoo Interchange GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-gis\/", "category": "Environmental, GIS, Survey, Transportation", "filter": "Asset Management,Custom Software Tools,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Zoo-Web-GIS-Screen_Utilities_1.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange was a massive project reconstructing the I-94 and I-41 interchange in Milwaukee and Waukesha Counties in Wisconsin. A project this large required ..." }, { "id": 476, "title": "We Energies Gas Laterals", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-gas-laterals\/", "category": "GIS, Planning, Power & Energy, Survey", "filter": "Custom Software Tools,Easements,Extranet Applications,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/gis-nwl-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur won the design and survey contract for three separate laterals in Northwest Wisconsin. As part of the design solution, Kapur developed a GIS system ..." }, { "id": 475, "title": "City of Lake Geneva GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-lake-geneva-gis\/", "category": "GIS, Municipal, Survey", "filter": "Custom Software Tools,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LG_DNRMonitoringSitesEx.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Prior to serving as the Engineer of Record for the City of Lake Geneva, we conducted a thorough analysis of the city’s existing GIS structure ..." }, { "id": 474, "title": "Downtown Wayfinding", "linkz": "https:\/\/kapurengineers.com\/case-studies\/downtown-wayfinding\/", "category": "Municipal", "filter": "Asset Management,Civic,Local Roads,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/20191029_151822.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When Kapur was selected as the Engineer of Record for the City of Lake Geneva, one of the first projects we delivered was an updated ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." }, { "id": 499, "title": "Salt Dome, Brine Building, and Maintenance Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/", "category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural", "filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..." }, { "id": 498, "title": "Linwood Water Tunnel", "linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/", "category": "LiDAR, Structural, Survey, Water Services", "filter": "I&C,Mapping,Scanning,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..." }, { "id": 497, "title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus", "linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/", "category": "Landscape Architecture, Natural Resources, Site Design", "filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..." }, { "id": 496, "title": "Milwaukee River Flushing Station Foundation Restoration", "linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/", "category": "Landscape Architecture, Site Design, Structural", "filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..." }, { "id": 495, "title": "Ishnala Trail Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/", "category": "Structural", "filter": "Bridges", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..." }, { "id": 494, "title": "Glacier Hills Wind Park", "linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/", "category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey", "filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..." }, { "id": 493, "title": "Gas Main Replacement", "linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/", "category": "Municipal, Planning, Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..." }, { "id": 492, "title": "School District Master Planning", "linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/", "category": "Landscape Architecture, Planning, Site Design, Survey", "filter": "Athletics,Civic,Education,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..." }, { "id": 491, "title": "Conveyance Gate Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/", "category": "Electrical, Structural, Water Services", "filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..." }, { "id": 490, "title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/", "category": "Electrical, Water Services", "filter": "Buildings,I&C,Power Distribution,Treatment Plant", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..." }, { "id": 489, "title": "We Energies Environmental Training", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/", "category": "Environmental, Natural Resources, Power & Energy", "filter": "Erosion Control,Permitting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..." }, { "id": 488, "title": "Coal Pile Runoff and Air Quality", "linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/", "category": "Electrical, Power & Energy", "filter": "BIM,Mapping,Scanning,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..." }, { "id": 487, "title": "General Mitchell International Airport (GMIA) Redundant Feeder", "linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/", "category": "Electrical, Site Design", "filter": "Buildings,Power Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..." }, { "id": 486, "title": "Zoo Interchange Lighting", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/", "category": "Electrical", "filter": "Lighting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..." }, { "id": 485, "title": "Winnebago Street Roundabout", "linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/", "category": "Landscape Architecture, Transportation", "filter": "Intersection,Local Roads,Reconstruction,Roundabout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..." }, { "id": 484, "title": "I-94 North-South Public Involvement GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/", "category": "GIS, Transportation", "filter": "Bridges,Interchange,Interstate,Reconstruction", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..." }, { "id": 483, "title": "Kapur Internal Multi-Office GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/", "category": "GIS", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg", "mbl_crp": "50  ", "region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania", "xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..." }, { "id": 482, "title": "Lakeshore Lateral Pipeline GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/", "category": "GIS, Power & Energy, Survey, UAV", "filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..." }, { "id": 481, "title": "Schlitz Park Brewtown Square", "linkz": "https:\/\/kapurengineers.com\/case-studies\/schlitz-park-brewtown-square\/", "category": "Landscape Architecture, Site Design", "filter": "Corporate,Green Space,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5144.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Undeveloped property in downtown Milwaukee is at a premium. Without room for urban expansion, out-of-the-box alternatives are necessary to develop this area of the city. ..." }, { "id": 480, "title": "Milwaukee School of Engineering (MSOE) Athletic Complex", "linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-school-of-engineering-msoe-athletic-complex\/", "category": "Landscape Architecture, Site Design", "filter": "Athletics,Education,Mixed Use", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Pocket-Park-scaled.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When MSOE dreamed of a state-of-the-art athletic facility, Drs. Robert and Patricia Kern met the challenge by providing funds to acquire the land for the ..." }, { "id": 479, "title": "Village of Darien GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/village-of-darien-gis\/", "category": "GIS, Municipal, Survey", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/darien3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur is the\u00a0primary provider of engineering services for the Village of Darien. When Kapur was\u00a0awarded its first street reconstruction project with the Village of Darien ..." }, { "id": 478, "title": "City of Burlington GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-burlington-gis\/", "category": "GIS, Municipal, Survey", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Burlington_GIS2_Floodplain.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was in the process of collecting data for an old and rudimentary GIS when the City of Burlington decided to upgrade the site. Presented ..." }, { "id": 477, "title": "Zoo Interchange GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-gis\/", "category": "Environmental, GIS, Survey, Transportation", "filter": "Asset Management,Custom Software Tools,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Zoo-Web-GIS-Screen_Utilities_1.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange was a massive project reconstructing the I-94 and I-41 interchange in Milwaukee and Waukesha Counties in Wisconsin. A project this large required ..." }, { "id": 476, "title": "We Energies Gas Laterals", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-gas-laterals\/", "category": "GIS, Planning, Power & Energy, Survey", "filter": "Custom Software Tools,Easements,Extranet Applications,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/gis-nwl-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur won the design and survey contract for three separate laterals in Northwest Wisconsin. As part of the design solution, Kapur developed a GIS system ..." }, { "id": 475, "title": "City of Lake Geneva GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-lake-geneva-gis\/", "category": "GIS, Municipal, Survey", "filter": "Custom Software Tools,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LG_DNRMonitoringSitesEx.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Prior to serving as the Engineer of Record for the City of Lake Geneva, we conducted a thorough analysis of the city’s existing GIS structure ..." }, { "id": 474, "title": "Downtown Wayfinding", "linkz": "https:\/\/kapurengineers.com\/case-studies\/downtown-wayfinding\/", "category": "Municipal", "filter": "Asset Management,Civic,Local Roads,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/20191029_151822.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When Kapur was selected as the Engineer of Record for the City of Lake Geneva, one of the first projects we delivered was an updated ..." }, { "id": 473, "title": "Civic Campus Redevelopment", "linkz": "https:\/\/kapurengineers.com\/case-studies\/civic-campus-redevelopment\/", "category": "Landscape Architecture, Municipal, Site Design", "filter": "Civic,Green Space,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A0526.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "For many years the Village of Mount Pleasant, Wisconsin, staff worked in a cramped, outdated, urban property set in the retail-first area of the village." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." }, { "id": 499, "title": "Salt Dome, Brine Building, and Maintenance Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/", "category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural", "filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..." }, { "id": 498, "title": "Linwood Water Tunnel", "linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/", "category": "LiDAR, Structural, Survey, Water Services", "filter": "I&C,Mapping,Scanning,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..." }, { "id": 497, "title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus", "linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/", "category": "Landscape Architecture, Natural Resources, Site Design", "filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..." }, { "id": 496, "title": "Milwaukee River Flushing Station Foundation Restoration", "linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/", "category": "Landscape Architecture, Site Design, Structural", "filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..." }, { "id": 495, "title": "Ishnala Trail Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/", "category": "Structural", "filter": "Bridges", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..." }, { "id": 494, "title": "Glacier Hills Wind Park", "linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/", "category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey", "filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..." }, { "id": 493, "title": "Gas Main Replacement", "linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/", "category": "Municipal, Planning, Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..." }, { "id": 492, "title": "School District Master Planning", "linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/", "category": "Landscape Architecture, Planning, Site Design, Survey", "filter": "Athletics,Civic,Education,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..." }, { "id": 491, "title": "Conveyance Gate Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/", "category": "Electrical, Structural, Water Services", "filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..." }, { "id": 490, "title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/", "category": "Electrical, Water Services", "filter": "Buildings,I&C,Power Distribution,Treatment Plant", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..." }, { "id": 489, "title": "We Energies Environmental Training", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/", "category": "Environmental, Natural Resources, Power & Energy", "filter": "Erosion Control,Permitting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..." }, { "id": 488, "title": "Coal Pile Runoff and Air Quality", "linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/", "category": "Electrical, Power & Energy", "filter": "BIM,Mapping,Scanning,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..." }, { "id": 487, "title": "General Mitchell International Airport (GMIA) Redundant Feeder", "linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/", "category": "Electrical, Site Design", "filter": "Buildings,Power Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..." }, { "id": 486, "title": "Zoo Interchange Lighting", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/", "category": "Electrical", "filter": "Lighting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..." }, { "id": 485, "title": "Winnebago Street Roundabout", "linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/", "category": "Landscape Architecture, Transportation", "filter": "Intersection,Local Roads,Reconstruction,Roundabout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..." }, { "id": 484, "title": "I-94 North-South Public Involvement GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/", "category": "GIS, Transportation", "filter": "Bridges,Interchange,Interstate,Reconstruction", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..." }, { "id": 483, "title": "Kapur Internal Multi-Office GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/", "category": "GIS", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg", "mbl_crp": "50  ", "region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania", "xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..." }, { "id": 482, "title": "Lakeshore Lateral Pipeline GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/", "category": "GIS, Power & Energy, Survey, UAV", "filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..." }, { "id": 481, "title": "Schlitz Park Brewtown Square", "linkz": "https:\/\/kapurengineers.com\/case-studies\/schlitz-park-brewtown-square\/", "category": "Landscape Architecture, Site Design", "filter": "Corporate,Green Space,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5144.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Undeveloped property in downtown Milwaukee is at a premium. Without room for urban expansion, out-of-the-box alternatives are necessary to develop this area of the city. ..." }, { "id": 480, "title": "Milwaukee School of Engineering (MSOE) Athletic Complex", "linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-school-of-engineering-msoe-athletic-complex\/", "category": "Landscape Architecture, Site Design", "filter": "Athletics,Education,Mixed Use", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Pocket-Park-scaled.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When MSOE dreamed of a state-of-the-art athletic facility, Drs. Robert and Patricia Kern met the challenge by providing funds to acquire the land for the ..." }, { "id": 479, "title": "Village of Darien GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/village-of-darien-gis\/", "category": "GIS, Municipal, Survey", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/darien3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur is the\u00a0primary provider of engineering services for the Village of Darien. When Kapur was\u00a0awarded its first street reconstruction project with the Village of Darien ..." }, { "id": 478, "title": "City of Burlington GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-burlington-gis\/", "category": "GIS, Municipal, Survey", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Burlington_GIS2_Floodplain.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was in the process of collecting data for an old and rudimentary GIS when the City of Burlington decided to upgrade the site. Presented ..." }, { "id": 477, "title": "Zoo Interchange GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-gis\/", "category": "Environmental, GIS, Survey, Transportation", "filter": "Asset Management,Custom Software Tools,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Zoo-Web-GIS-Screen_Utilities_1.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange was a massive project reconstructing the I-94 and I-41 interchange in Milwaukee and Waukesha Counties in Wisconsin. A project this large required ..." }, { "id": 476, "title": "We Energies Gas Laterals", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-gas-laterals\/", "category": "GIS, Planning, Power & Energy, Survey", "filter": "Custom Software Tools,Easements,Extranet Applications,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/gis-nwl-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur won the design and survey contract for three separate laterals in Northwest Wisconsin. As part of the design solution, Kapur developed a GIS system ..." }, { "id": 475, "title": "City of Lake Geneva GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-lake-geneva-gis\/", "category": "GIS, Municipal, Survey", "filter": "Custom Software Tools,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LG_DNRMonitoringSitesEx.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Prior to serving as the Engineer of Record for the City of Lake Geneva, we conducted a thorough analysis of the city’s existing GIS structure ..." }, { "id": 474, "title": "Downtown Wayfinding", "linkz": "https:\/\/kapurengineers.com\/case-studies\/downtown-wayfinding\/", "category": "Municipal", "filter": "Asset Management,Civic,Local Roads,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/20191029_151822.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When Kapur was selected as the Engineer of Record for the City of Lake Geneva, one of the first projects we delivered was an updated ..." }, { "id": 473, "title": "Civic Campus Redevelopment", "linkz": "https:\/\/kapurengineers.com\/case-studies\/civic-campus-redevelopment\/", "category": "Landscape Architecture, Municipal, Site Design", "filter": "Civic,Green Space,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A0526.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "For many years the Village of Mount Pleasant, Wisconsin, staff worked in a cramped, outdated, urban property set in the retail-first area of the village." }, { "id": 472, "title": "Milwaukee Bucks Arena District Site Design", "linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-bucks-arena-district-site-design\/", "category": "Landscape Architecture, Site Design", "filter": "Athletics,Commercial,Green Space,Hospitality,Mapping,Mixed Use,Scanning,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/2022-Fiserv-Forum-Deer-District_1.png", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Bucks had outgrown their dated facility, so the team began searching for a new location and assembling a team to assist with planning ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." }, { "id": 499, "title": "Salt Dome, Brine Building, and Maintenance Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/", "category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural", "filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..." }, { "id": 498, "title": "Linwood Water Tunnel", "linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/", "category": "LiDAR, Structural, Survey, Water Services", "filter": "I&C,Mapping,Scanning,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..." }, { "id": 497, "title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus", "linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/", "category": "Landscape Architecture, Natural Resources, Site Design", "filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..." }, { "id": 496, "title": "Milwaukee River Flushing Station Foundation Restoration", "linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/", "category": "Landscape Architecture, Site Design, Structural", "filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..." }, { "id": 495, "title": "Ishnala Trail Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/", "category": "Structural", "filter": "Bridges", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..." }, { "id": 494, "title": "Glacier Hills Wind Park", "linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/", "category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey", "filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..." }, { "id": 493, "title": "Gas Main Replacement", "linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/", "category": "Municipal, Planning, Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..." }, { "id": 492, "title": "School District Master Planning", "linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/", "category": "Landscape Architecture, Planning, Site Design, Survey", "filter": "Athletics,Civic,Education,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..." }, { "id": 491, "title": "Conveyance Gate Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/", "category": "Electrical, Structural, Water Services", "filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..." }, { "id": 490, "title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/", "category": "Electrical, Water Services", "filter": "Buildings,I&C,Power Distribution,Treatment Plant", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..." }, { "id": 489, "title": "We Energies Environmental Training", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/", "category": "Environmental, Natural Resources, Power & Energy", "filter": "Erosion Control,Permitting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..." }, { "id": 488, "title": "Coal Pile Runoff and Air Quality", "linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/", "category": "Electrical, Power & Energy", "filter": "BIM,Mapping,Scanning,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..." }, { "id": 487, "title": "General Mitchell International Airport (GMIA) Redundant Feeder", "linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/", "category": "Electrical, Site Design", "filter": "Buildings,Power Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..." }, { "id": 486, "title": "Zoo Interchange Lighting", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/", "category": "Electrical", "filter": "Lighting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..." }, { "id": 485, "title": "Winnebago Street Roundabout", "linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/", "category": "Landscape Architecture, Transportation", "filter": "Intersection,Local Roads,Reconstruction,Roundabout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..." }, { "id": 484, "title": "I-94 North-South Public Involvement GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/", "category": "GIS, Transportation", "filter": "Bridges,Interchange,Interstate,Reconstruction", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..." }, { "id": 483, "title": "Kapur Internal Multi-Office GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/", "category": "GIS", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg", "mbl_crp": "50  ", "region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania", "xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..." }, { "id": 482, "title": "Lakeshore Lateral Pipeline GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/", "category": "GIS, Power & Energy, Survey, UAV", "filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..." }, { "id": 481, "title": "Schlitz Park Brewtown Square", "linkz": "https:\/\/kapurengineers.com\/case-studies\/schlitz-park-brewtown-square\/", "category": "Landscape Architecture, Site Design", "filter": "Corporate,Green Space,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5144.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Undeveloped property in downtown Milwaukee is at a premium. Without room for urban expansion, out-of-the-box alternatives are necessary to develop this area of the city. ..." }, { "id": 480, "title": "Milwaukee School of Engineering (MSOE) Athletic Complex", "linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-school-of-engineering-msoe-athletic-complex\/", "category": "Landscape Architecture, Site Design", "filter": "Athletics,Education,Mixed Use", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Pocket-Park-scaled.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When MSOE dreamed of a state-of-the-art athletic facility, Drs. Robert and Patricia Kern met the challenge by providing funds to acquire the land for the ..." }, { "id": 479, "title": "Village of Darien GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/village-of-darien-gis\/", "category": "GIS, Municipal, Survey", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/darien3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur is the\u00a0primary provider of engineering services for the Village of Darien. When Kapur was\u00a0awarded its first street reconstruction project with the Village of Darien ..." }, { "id": 478, "title": "City of Burlington GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-burlington-gis\/", "category": "GIS, Municipal, Survey", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Burlington_GIS2_Floodplain.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was in the process of collecting data for an old and rudimentary GIS when the City of Burlington decided to upgrade the site. Presented ..." }, { "id": 477, "title": "Zoo Interchange GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-gis\/", "category": "Environmental, GIS, Survey, Transportation", "filter": "Asset Management,Custom Software Tools,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Zoo-Web-GIS-Screen_Utilities_1.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange was a massive project reconstructing the I-94 and I-41 interchange in Milwaukee and Waukesha Counties in Wisconsin. A project this large required ..." }, { "id": 476, "title": "We Energies Gas Laterals", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-gas-laterals\/", "category": "GIS, Planning, Power & Energy, Survey", "filter": "Custom Software Tools,Easements,Extranet Applications,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/gis-nwl-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur won the design and survey contract for three separate laterals in Northwest Wisconsin. As part of the design solution, Kapur developed a GIS system ..." }, { "id": 475, "title": "City of Lake Geneva GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-lake-geneva-gis\/", "category": "GIS, Municipal, Survey", "filter": "Custom Software Tools,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LG_DNRMonitoringSitesEx.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Prior to serving as the Engineer of Record for the City of Lake Geneva, we conducted a thorough analysis of the city’s existing GIS structure ..." }, { "id": 474, "title": "Downtown Wayfinding", "linkz": "https:\/\/kapurengineers.com\/case-studies\/downtown-wayfinding\/", "category": "Municipal", "filter": "Asset Management,Civic,Local Roads,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/20191029_151822.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When Kapur was selected as the Engineer of Record for the City of Lake Geneva, one of the first projects we delivered was an updated ..." }, { "id": 473, "title": "Civic Campus Redevelopment", "linkz": "https:\/\/kapurengineers.com\/case-studies\/civic-campus-redevelopment\/", "category": "Landscape Architecture, Municipal, Site Design", "filter": "Civic,Green Space,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A0526.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "For many years the Village of Mount Pleasant, Wisconsin, staff worked in a cramped, outdated, urban property set in the retail-first area of the village." }, { "id": 472, "title": "Milwaukee Bucks Arena District Site Design", "linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-bucks-arena-district-site-design\/", "category": "Landscape Architecture, Site Design", "filter": "Athletics,Commercial,Green Space,Hospitality,Mapping,Mixed Use,Scanning,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/2022-Fiserv-Forum-Deer-District_1.png", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Bucks had outgrown their dated facility, so the team began searching for a new location and assembling a team to assist with planning ..." }, { "id": 471, "title": "The Corners of Brookfield Retail Development", "linkz": "https:\/\/kapurengineers.com\/case-studies\/the-corners-of-brookfield-retail-development\/", "category": "Landscape Architecture, Site Design, Structural, Survey", "filter": "ALTA\/CSM,Commercial,Easements,Green Space,Hospitality,Mixed Use,Study,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Von-Maur-1.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The client, Marcus Corporation, aimed to create a space based on the Suburban Town Center model in Brookfield, Wisconsin, west of the City of Milwaukee.Marcus ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." }, { "id": 499, "title": "Salt Dome, Brine Building, and Maintenance Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/", "category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural", "filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..." }, { "id": 498, "title": "Linwood Water Tunnel", "linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/", "category": "LiDAR, Structural, Survey, Water Services", "filter": "I&C,Mapping,Scanning,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..." }, { "id": 497, "title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus", "linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/", "category": "Landscape Architecture, Natural Resources, Site Design", "filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..." }, { "id": 496, "title": "Milwaukee River Flushing Station Foundation Restoration", "linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/", "category": "Landscape Architecture, Site Design, Structural", "filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..." }, { "id": 495, "title": "Ishnala Trail Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/", "category": "Structural", "filter": "Bridges", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..." }, { "id": 494, "title": "Glacier Hills Wind Park", "linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/", "category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey", "filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..." }, { "id": 493, "title": "Gas Main Replacement", "linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/", "category": "Municipal, Planning, Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..." }, { "id": 492, "title": "School District Master Planning", "linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/", "category": "Landscape Architecture, Planning, Site Design, Survey", "filter": "Athletics,Civic,Education,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..." }, { "id": 491, "title": "Conveyance Gate Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/", "category": "Electrical, Structural, Water Services", "filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..." }, { "id": 490, "title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/", "category": "Electrical, Water Services", "filter": "Buildings,I&C,Power Distribution,Treatment Plant", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..." }, { "id": 489, "title": "We Energies Environmental Training", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/", "category": "Environmental, Natural Resources, Power & Energy", "filter": "Erosion Control,Permitting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..." }, { "id": 488, "title": "Coal Pile Runoff and Air Quality", "linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/", "category": "Electrical, Power & Energy", "filter": "BIM,Mapping,Scanning,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..." }, { "id": 487, "title": "General Mitchell International Airport (GMIA) Redundant Feeder", "linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/", "category": "Electrical, Site Design", "filter": "Buildings,Power Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..." }, { "id": 486, "title": "Zoo Interchange Lighting", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/", "category": "Electrical", "filter": "Lighting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..." }, { "id": 485, "title": "Winnebago Street Roundabout", "linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/", "category": "Landscape Architecture, Transportation", "filter": "Intersection,Local Roads,Reconstruction,Roundabout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..." }, { "id": 484, "title": "I-94 North-South Public Involvement GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/", "category": "GIS, Transportation", "filter": "Bridges,Interchange,Interstate,Reconstruction", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..." }, { "id": 483, "title": "Kapur Internal Multi-Office GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/", "category": "GIS", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg", "mbl_crp": "50  ", "region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania", "xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..." }, { "id": 482, "title": "Lakeshore Lateral Pipeline GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/", "category": "GIS, Power & Energy, Survey, UAV", "filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..." }, { "id": 481, "title": "Schlitz Park Brewtown Square", "linkz": "https:\/\/kapurengineers.com\/case-studies\/schlitz-park-brewtown-square\/", "category": "Landscape Architecture, Site Design", "filter": "Corporate,Green Space,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5144.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Undeveloped property in downtown Milwaukee is at a premium. Without room for urban expansion, out-of-the-box alternatives are necessary to develop this area of the city. ..." }, { "id": 480, "title": "Milwaukee School of Engineering (MSOE) Athletic Complex", "linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-school-of-engineering-msoe-athletic-complex\/", "category": "Landscape Architecture, Site Design", "filter": "Athletics,Education,Mixed Use", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Pocket-Park-scaled.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When MSOE dreamed of a state-of-the-art athletic facility, Drs. Robert and Patricia Kern met the challenge by providing funds to acquire the land for the ..." }, { "id": 479, "title": "Village of Darien GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/village-of-darien-gis\/", "category": "GIS, Municipal, Survey", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/darien3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur is the\u00a0primary provider of engineering services for the Village of Darien. When Kapur was\u00a0awarded its first street reconstruction project with the Village of Darien ..." }, { "id": 478, "title": "City of Burlington GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-burlington-gis\/", "category": "GIS, Municipal, Survey", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Burlington_GIS2_Floodplain.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was in the process of collecting data for an old and rudimentary GIS when the City of Burlington decided to upgrade the site. Presented ..." }, { "id": 477, "title": "Zoo Interchange GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-gis\/", "category": "Environmental, GIS, Survey, Transportation", "filter": "Asset Management,Custom Software Tools,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Zoo-Web-GIS-Screen_Utilities_1.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange was a massive project reconstructing the I-94 and I-41 interchange in Milwaukee and Waukesha Counties in Wisconsin. A project this large required ..." }, { "id": 476, "title": "We Energies Gas Laterals", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-gas-laterals\/", "category": "GIS, Planning, Power & Energy, Survey", "filter": "Custom Software Tools,Easements,Extranet Applications,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/gis-nwl-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur won the design and survey contract for three separate laterals in Northwest Wisconsin. As part of the design solution, Kapur developed a GIS system ..." }, { "id": 475, "title": "City of Lake Geneva GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-lake-geneva-gis\/", "category": "GIS, Municipal, Survey", "filter": "Custom Software Tools,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LG_DNRMonitoringSitesEx.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Prior to serving as the Engineer of Record for the City of Lake Geneva, we conducted a thorough analysis of the city’s existing GIS structure ..." }, { "id": 474, "title": "Downtown Wayfinding", "linkz": "https:\/\/kapurengineers.com\/case-studies\/downtown-wayfinding\/", "category": "Municipal", "filter": "Asset Management,Civic,Local Roads,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/20191029_151822.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When Kapur was selected as the Engineer of Record for the City of Lake Geneva, one of the first projects we delivered was an updated ..." }, { "id": 473, "title": "Civic Campus Redevelopment", "linkz": "https:\/\/kapurengineers.com\/case-studies\/civic-campus-redevelopment\/", "category": "Landscape Architecture, Municipal, Site Design", "filter": "Civic,Green Space,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A0526.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "For many years the Village of Mount Pleasant, Wisconsin, staff worked in a cramped, outdated, urban property set in the retail-first area of the village." }, { "id": 472, "title": "Milwaukee Bucks Arena District Site Design", "linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-bucks-arena-district-site-design\/", "category": "Landscape Architecture, Site Design", "filter": "Athletics,Commercial,Green Space,Hospitality,Mapping,Mixed Use,Scanning,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/2022-Fiserv-Forum-Deer-District_1.png", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Bucks had outgrown their dated facility, so the team began searching for a new location and assembling a team to assist with planning ..." }, { "id": 471, "title": "The Corners of Brookfield Retail Development", "linkz": "https:\/\/kapurengineers.com\/case-studies\/the-corners-of-brookfield-retail-development\/", "category": "Landscape Architecture, Site Design, Structural, Survey", "filter": "ALTA\/CSM,Commercial,Easements,Green Space,Hospitality,Mixed Use,Study,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Von-Maur-1.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The client, Marcus Corporation, aimed to create a space based on the Suburban Town Center model in Brookfield, Wisconsin, west of the City of Milwaukee.Marcus ..." }, { "id": 470, "title": "Cristo Rey Jesuit High School Environmental Investigation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/cristo-rey-jesuit-high-school-environmental-investigation\/", "category": "Environmental, Site Design, Survey", "filter": "Remediation,Site Assessment,Site Investigation,UST", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_0269.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "After first retaining Kapur for site design services, Cristo Rey Jesuit High School later selected Kapur to also provide environmental consulting for the redevelopment of ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." }, { "id": 499, "title": "Salt Dome, Brine Building, and Maintenance Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/", "category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural", "filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..." }, { "id": 498, "title": "Linwood Water Tunnel", "linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/", "category": "LiDAR, Structural, Survey, Water Services", "filter": "I&C,Mapping,Scanning,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..." }, { "id": 497, "title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus", "linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/", "category": "Landscape Architecture, Natural Resources, Site Design", "filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..." }, { "id": 496, "title": "Milwaukee River Flushing Station Foundation Restoration", "linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/", "category": "Landscape Architecture, Site Design, Structural", "filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..." }, { "id": 495, "title": "Ishnala Trail Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/", "category": "Structural", "filter": "Bridges", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..." }, { "id": 494, "title": "Glacier Hills Wind Park", "linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/", "category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey", "filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..." }, { "id": 493, "title": "Gas Main Replacement", "linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/", "category": "Municipal, Planning, Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..." }, { "id": 492, "title": "School District Master Planning", "linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/", "category": "Landscape Architecture, Planning, Site Design, Survey", "filter": "Athletics,Civic,Education,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..." }, { "id": 491, "title": "Conveyance Gate Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/", "category": "Electrical, Structural, Water Services", "filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..." }, { "id": 490, "title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/", "category": "Electrical, Water Services", "filter": "Buildings,I&C,Power Distribution,Treatment Plant", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..." }, { "id": 489, "title": "We Energies Environmental Training", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/", "category": "Environmental, Natural Resources, Power & Energy", "filter": "Erosion Control,Permitting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..." }, { "id": 488, "title": "Coal Pile Runoff and Air Quality", "linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/", "category": "Electrical, Power & Energy", "filter": "BIM,Mapping,Scanning,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..." }, { "id": 487, "title": "General Mitchell International Airport (GMIA) Redundant Feeder", "linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/", "category": "Electrical, Site Design", "filter": "Buildings,Power Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..." }, { "id": 486, "title": "Zoo Interchange Lighting", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/", "category": "Electrical", "filter": "Lighting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..." }, { "id": 485, "title": "Winnebago Street Roundabout", "linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/", "category": "Landscape Architecture, Transportation", "filter": "Intersection,Local Roads,Reconstruction,Roundabout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..." }, { "id": 484, "title": "I-94 North-South Public Involvement GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/", "category": "GIS, Transportation", "filter": "Bridges,Interchange,Interstate,Reconstruction", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..." }, { "id": 483, "title": "Kapur Internal Multi-Office GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/", "category": "GIS", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg", "mbl_crp": "50  ", "region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania", "xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..." }, { "id": 482, "title": "Lakeshore Lateral Pipeline GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/", "category": "GIS, Power & Energy, Survey, UAV", "filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..." }, { "id": 481, "title": "Schlitz Park Brewtown Square", "linkz": "https:\/\/kapurengineers.com\/case-studies\/schlitz-park-brewtown-square\/", "category": "Landscape Architecture, Site Design", "filter": "Corporate,Green Space,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5144.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Undeveloped property in downtown Milwaukee is at a premium. Without room for urban expansion, out-of-the-box alternatives are necessary to develop this area of the city. ..." }, { "id": 480, "title": "Milwaukee School of Engineering (MSOE) Athletic Complex", "linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-school-of-engineering-msoe-athletic-complex\/", "category": "Landscape Architecture, Site Design", "filter": "Athletics,Education,Mixed Use", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Pocket-Park-scaled.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When MSOE dreamed of a state-of-the-art athletic facility, Drs. Robert and Patricia Kern met the challenge by providing funds to acquire the land for the ..." }, { "id": 479, "title": "Village of Darien GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/village-of-darien-gis\/", "category": "GIS, Municipal, Survey", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/darien3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur is the\u00a0primary provider of engineering services for the Village of Darien. When Kapur was\u00a0awarded its first street reconstruction project with the Village of Darien ..." }, { "id": 478, "title": "City of Burlington GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-burlington-gis\/", "category": "GIS, Municipal, Survey", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Burlington_GIS2_Floodplain.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was in the process of collecting data for an old and rudimentary GIS when the City of Burlington decided to upgrade the site. Presented ..." }, { "id": 477, "title": "Zoo Interchange GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-gis\/", "category": "Environmental, GIS, Survey, Transportation", "filter": "Asset Management,Custom Software Tools,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Zoo-Web-GIS-Screen_Utilities_1.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange was a massive project reconstructing the I-94 and I-41 interchange in Milwaukee and Waukesha Counties in Wisconsin. A project this large required ..." }, { "id": 476, "title": "We Energies Gas Laterals", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-gas-laterals\/", "category": "GIS, Planning, Power & Energy, Survey", "filter": "Custom Software Tools,Easements,Extranet Applications,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/gis-nwl-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur won the design and survey contract for three separate laterals in Northwest Wisconsin. As part of the design solution, Kapur developed a GIS system ..." }, { "id": 475, "title": "City of Lake Geneva GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-lake-geneva-gis\/", "category": "GIS, Municipal, Survey", "filter": "Custom Software Tools,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LG_DNRMonitoringSitesEx.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Prior to serving as the Engineer of Record for the City of Lake Geneva, we conducted a thorough analysis of the city’s existing GIS structure ..." }, { "id": 474, "title": "Downtown Wayfinding", "linkz": "https:\/\/kapurengineers.com\/case-studies\/downtown-wayfinding\/", "category": "Municipal", "filter": "Asset Management,Civic,Local Roads,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/20191029_151822.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When Kapur was selected as the Engineer of Record for the City of Lake Geneva, one of the first projects we delivered was an updated ..." }, { "id": 473, "title": "Civic Campus Redevelopment", "linkz": "https:\/\/kapurengineers.com\/case-studies\/civic-campus-redevelopment\/", "category": "Landscape Architecture, Municipal, Site Design", "filter": "Civic,Green Space,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A0526.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "For many years the Village of Mount Pleasant, Wisconsin, staff worked in a cramped, outdated, urban property set in the retail-first area of the village." }, { "id": 472, "title": "Milwaukee Bucks Arena District Site Design", "linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-bucks-arena-district-site-design\/", "category": "Landscape Architecture, Site Design", "filter": "Athletics,Commercial,Green Space,Hospitality,Mapping,Mixed Use,Scanning,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/2022-Fiserv-Forum-Deer-District_1.png", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Bucks had outgrown their dated facility, so the team began searching for a new location and assembling a team to assist with planning ..." }, { "id": 471, "title": "The Corners of Brookfield Retail Development", "linkz": "https:\/\/kapurengineers.com\/case-studies\/the-corners-of-brookfield-retail-development\/", "category": "Landscape Architecture, Site Design, Structural, Survey", "filter": "ALTA\/CSM,Commercial,Easements,Green Space,Hospitality,Mixed Use,Study,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Von-Maur-1.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The client, Marcus Corporation, aimed to create a space based on the Suburban Town Center model in Brookfield, Wisconsin, west of the City of Milwaukee.Marcus ..." }, { "id": 470, "title": "Cristo Rey Jesuit High School Environmental Investigation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/cristo-rey-jesuit-high-school-environmental-investigation\/", "category": "Environmental, Site Design, Survey", "filter": "Remediation,Site Assessment,Site Investigation,UST", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_0269.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "After first retaining Kapur for site design services, Cristo Rey Jesuit High School later selected Kapur to also provide environmental consulting for the redevelopment of ..." }, { "id": 469, "title": "Harbor View Lofts Environmental Investigation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/harbor-view-lofts-environmental-investigation\/", "category": "Environmental, Survey", "filter": "Remediation,Site Assessment,Site Investigation,UST", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/34.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "As part of a property acquisition, LCM Funds selected Kapur to provide a Phase I Environmental Site Assessment (ESA).The Phase I ESA revealed the site ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." }, { "id": 499, "title": "Salt Dome, Brine Building, and Maintenance Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/", "category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural", "filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..." }, { "id": 498, "title": "Linwood Water Tunnel", "linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/", "category": "LiDAR, Structural, Survey, Water Services", "filter": "I&C,Mapping,Scanning,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..." }, { "id": 497, "title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus", "linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/", "category": "Landscape Architecture, Natural Resources, Site Design", "filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..." }, { "id": 496, "title": "Milwaukee River Flushing Station Foundation Restoration", "linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/", "category": "Landscape Architecture, Site Design, Structural", "filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..." }, { "id": 495, "title": "Ishnala Trail Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/", "category": "Structural", "filter": "Bridges", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..." }, { "id": 494, "title": "Glacier Hills Wind Park", "linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/", "category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey", "filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..." }, { "id": 493, "title": "Gas Main Replacement", "linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/", "category": "Municipal, Planning, Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..." }, { "id": 492, "title": "School District Master Planning", "linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/", "category": "Landscape Architecture, Planning, Site Design, Survey", "filter": "Athletics,Civic,Education,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..." }, { "id": 491, "title": "Conveyance Gate Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/", "category": "Electrical, Structural, Water Services", "filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..." }, { "id": 490, "title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/", "category": "Electrical, Water Services", "filter": "Buildings,I&C,Power Distribution,Treatment Plant", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..." }, { "id": 489, "title": "We Energies Environmental Training", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/", "category": "Environmental, Natural Resources, Power & Energy", "filter": "Erosion Control,Permitting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..." }, { "id": 488, "title": "Coal Pile Runoff and Air Quality", "linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/", "category": "Electrical, Power & Energy", "filter": "BIM,Mapping,Scanning,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..." }, { "id": 487, "title": "General Mitchell International Airport (GMIA) Redundant Feeder", "linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/", "category": "Electrical, Site Design", "filter": "Buildings,Power Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..." }, { "id": 486, "title": "Zoo Interchange Lighting", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/", "category": "Electrical", "filter": "Lighting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..." }, { "id": 485, "title": "Winnebago Street Roundabout", "linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/", "category": "Landscape Architecture, Transportation", "filter": "Intersection,Local Roads,Reconstruction,Roundabout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..." }, { "id": 484, "title": "I-94 North-South Public Involvement GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/", "category": "GIS, Transportation", "filter": "Bridges,Interchange,Interstate,Reconstruction", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..." }, { "id": 483, "title": "Kapur Internal Multi-Office GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/", "category": "GIS", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg", "mbl_crp": "50  ", "region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania", "xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..." }, { "id": 482, "title": "Lakeshore Lateral Pipeline GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/", "category": "GIS, Power & Energy, Survey, UAV", "filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..." }, { "id": 481, "title": "Schlitz Park Brewtown Square", "linkz": "https:\/\/kapurengineers.com\/case-studies\/schlitz-park-brewtown-square\/", "category": "Landscape Architecture, Site Design", "filter": "Corporate,Green Space,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5144.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Undeveloped property in downtown Milwaukee is at a premium. Without room for urban expansion, out-of-the-box alternatives are necessary to develop this area of the city. ..." }, { "id": 480, "title": "Milwaukee School of Engineering (MSOE) Athletic Complex", "linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-school-of-engineering-msoe-athletic-complex\/", "category": "Landscape Architecture, Site Design", "filter": "Athletics,Education,Mixed Use", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Pocket-Park-scaled.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When MSOE dreamed of a state-of-the-art athletic facility, Drs. Robert and Patricia Kern met the challenge by providing funds to acquire the land for the ..." }, { "id": 479, "title": "Village of Darien GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/village-of-darien-gis\/", "category": "GIS, Municipal, Survey", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/darien3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur is the\u00a0primary provider of engineering services for the Village of Darien. When Kapur was\u00a0awarded its first street reconstruction project with the Village of Darien ..." }, { "id": 478, "title": "City of Burlington GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-burlington-gis\/", "category": "GIS, Municipal, Survey", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Burlington_GIS2_Floodplain.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was in the process of collecting data for an old and rudimentary GIS when the City of Burlington decided to upgrade the site. Presented ..." }, { "id": 477, "title": "Zoo Interchange GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-gis\/", "category": "Environmental, GIS, Survey, Transportation", "filter": "Asset Management,Custom Software Tools,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Zoo-Web-GIS-Screen_Utilities_1.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange was a massive project reconstructing the I-94 and I-41 interchange in Milwaukee and Waukesha Counties in Wisconsin. A project this large required ..." }, { "id": 476, "title": "We Energies Gas Laterals", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-gas-laterals\/", "category": "GIS, Planning, Power & Energy, Survey", "filter": "Custom Software Tools,Easements,Extranet Applications,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/gis-nwl-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur won the design and survey contract for three separate laterals in Northwest Wisconsin. As part of the design solution, Kapur developed a GIS system ..." }, { "id": 475, "title": "City of Lake Geneva GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-lake-geneva-gis\/", "category": "GIS, Municipal, Survey", "filter": "Custom Software Tools,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LG_DNRMonitoringSitesEx.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Prior to serving as the Engineer of Record for the City of Lake Geneva, we conducted a thorough analysis of the city’s existing GIS structure ..." }, { "id": 474, "title": "Downtown Wayfinding", "linkz": "https:\/\/kapurengineers.com\/case-studies\/downtown-wayfinding\/", "category": "Municipal", "filter": "Asset Management,Civic,Local Roads,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/20191029_151822.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When Kapur was selected as the Engineer of Record for the City of Lake Geneva, one of the first projects we delivered was an updated ..." }, { "id": 473, "title": "Civic Campus Redevelopment", "linkz": "https:\/\/kapurengineers.com\/case-studies\/civic-campus-redevelopment\/", "category": "Landscape Architecture, Municipal, Site Design", "filter": "Civic,Green Space,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A0526.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "For many years the Village of Mount Pleasant, Wisconsin, staff worked in a cramped, outdated, urban property set in the retail-first area of the village." }, { "id": 472, "title": "Milwaukee Bucks Arena District Site Design", "linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-bucks-arena-district-site-design\/", "category": "Landscape Architecture, Site Design", "filter": "Athletics,Commercial,Green Space,Hospitality,Mapping,Mixed Use,Scanning,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/2022-Fiserv-Forum-Deer-District_1.png", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Bucks had outgrown their dated facility, so the team began searching for a new location and assembling a team to assist with planning ..." }, { "id": 471, "title": "The Corners of Brookfield Retail Development", "linkz": "https:\/\/kapurengineers.com\/case-studies\/the-corners-of-brookfield-retail-development\/", "category": "Landscape Architecture, Site Design, Structural, Survey", "filter": "ALTA\/CSM,Commercial,Easements,Green Space,Hospitality,Mixed Use,Study,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Von-Maur-1.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The client, Marcus Corporation, aimed to create a space based on the Suburban Town Center model in Brookfield, Wisconsin, west of the City of Milwaukee.Marcus ..." }, { "id": 470, "title": "Cristo Rey Jesuit High School Environmental Investigation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/cristo-rey-jesuit-high-school-environmental-investigation\/", "category": "Environmental, Site Design, Survey", "filter": "Remediation,Site Assessment,Site Investigation,UST", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_0269.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "After first retaining Kapur for site design services, Cristo Rey Jesuit High School later selected Kapur to also provide environmental consulting for the redevelopment of ..." }, { "id": 469, "title": "Harbor View Lofts Environmental Investigation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/harbor-view-lofts-environmental-investigation\/", "category": "Environmental, Survey", "filter": "Remediation,Site Assessment,Site Investigation,UST", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/34.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "As part of a property acquisition, LCM Funds selected Kapur to provide a Phase I Environmental Site Assessment (ESA).The Phase I ESA revealed the site ..." }, { "id": 468, "title": "Environmental Services for the Foxconn Development", "linkz": "https:\/\/kapurengineers.com\/case-studies\/environmental-services-for-the-foxconn-development\/", "category": "Environmental, Survey", "filter": "Asbestos,Lead,Remediation,Site Assessment,Site Investigation,UST", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_3903.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Village of Mount Pleasant selected Kapur to provide environmental consulting to facilitate the demolition of residential and commercial properties acquired by the Village in ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." }, { "id": 499, "title": "Salt Dome, Brine Building, and Maintenance Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/", "category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural", "filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..." }, { "id": 498, "title": "Linwood Water Tunnel", "linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/", "category": "LiDAR, Structural, Survey, Water Services", "filter": "I&C,Mapping,Scanning,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..." }, { "id": 497, "title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus", "linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/", "category": "Landscape Architecture, Natural Resources, Site Design", "filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..." }, { "id": 496, "title": "Milwaukee River Flushing Station Foundation Restoration", "linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/", "category": "Landscape Architecture, Site Design, Structural", "filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..." }, { "id": 495, "title": "Ishnala Trail Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/", "category": "Structural", "filter": "Bridges", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..." }, { "id": 494, "title": "Glacier Hills Wind Park", "linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/", "category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey", "filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..." }, { "id": 493, "title": "Gas Main Replacement", "linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/", "category": "Municipal, Planning, Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..." }, { "id": 492, "title": "School District Master Planning", "linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/", "category": "Landscape Architecture, Planning, Site Design, Survey", "filter": "Athletics,Civic,Education,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..." }, { "id": 491, "title": "Conveyance Gate Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/", "category": "Electrical, Structural, Water Services", "filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..." }, { "id": 490, "title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/", "category": "Electrical, Water Services", "filter": "Buildings,I&C,Power Distribution,Treatment Plant", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..." }, { "id": 489, "title": "We Energies Environmental Training", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/", "category": "Environmental, Natural Resources, Power & Energy", "filter": "Erosion Control,Permitting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..." }, { "id": 488, "title": "Coal Pile Runoff and Air Quality", "linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/", "category": "Electrical, Power & Energy", "filter": "BIM,Mapping,Scanning,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..." }, { "id": 487, "title": "General Mitchell International Airport (GMIA) Redundant Feeder", "linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/", "category": "Electrical, Site Design", "filter": "Buildings,Power Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..." }, { "id": 486, "title": "Zoo Interchange Lighting", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/", "category": "Electrical", "filter": "Lighting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..." }, { "id": 485, "title": "Winnebago Street Roundabout", "linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/", "category": "Landscape Architecture, Transportation", "filter": "Intersection,Local Roads,Reconstruction,Roundabout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..." }, { "id": 484, "title": "I-94 North-South Public Involvement GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/", "category": "GIS, Transportation", "filter": "Bridges,Interchange,Interstate,Reconstruction", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..." }, { "id": 483, "title": "Kapur Internal Multi-Office GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/", "category": "GIS", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg", "mbl_crp": "50  ", "region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania", "xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..." }, { "id": 482, "title": "Lakeshore Lateral Pipeline GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/", "category": "GIS, Power & Energy, Survey, UAV", "filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..." }, { "id": 481, "title": "Schlitz Park Brewtown Square", "linkz": "https:\/\/kapurengineers.com\/case-studies\/schlitz-park-brewtown-square\/", "category": "Landscape Architecture, Site Design", "filter": "Corporate,Green Space,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5144.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Undeveloped property in downtown Milwaukee is at a premium. Without room for urban expansion, out-of-the-box alternatives are necessary to develop this area of the city. ..." }, { "id": 480, "title": "Milwaukee School of Engineering (MSOE) Athletic Complex", "linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-school-of-engineering-msoe-athletic-complex\/", "category": "Landscape Architecture, Site Design", "filter": "Athletics,Education,Mixed Use", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Pocket-Park-scaled.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When MSOE dreamed of a state-of-the-art athletic facility, Drs. Robert and Patricia Kern met the challenge by providing funds to acquire the land for the ..." }, { "id": 479, "title": "Village of Darien GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/village-of-darien-gis\/", "category": "GIS, Municipal, Survey", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/darien3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur is the\u00a0primary provider of engineering services for the Village of Darien. When Kapur was\u00a0awarded its first street reconstruction project with the Village of Darien ..." }, { "id": 478, "title": "City of Burlington GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-burlington-gis\/", "category": "GIS, Municipal, Survey", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Burlington_GIS2_Floodplain.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was in the process of collecting data for an old and rudimentary GIS when the City of Burlington decided to upgrade the site. Presented ..." }, { "id": 477, "title": "Zoo Interchange GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-gis\/", "category": "Environmental, GIS, Survey, Transportation", "filter": "Asset Management,Custom Software Tools,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Zoo-Web-GIS-Screen_Utilities_1.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange was a massive project reconstructing the I-94 and I-41 interchange in Milwaukee and Waukesha Counties in Wisconsin. A project this large required ..." }, { "id": 476, "title": "We Energies Gas Laterals", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-gas-laterals\/", "category": "GIS, Planning, Power & Energy, Survey", "filter": "Custom Software Tools,Easements,Extranet Applications,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/gis-nwl-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur won the design and survey contract for three separate laterals in Northwest Wisconsin. As part of the design solution, Kapur developed a GIS system ..." }, { "id": 475, "title": "City of Lake Geneva GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-lake-geneva-gis\/", "category": "GIS, Municipal, Survey", "filter": "Custom Software Tools,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LG_DNRMonitoringSitesEx.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Prior to serving as the Engineer of Record for the City of Lake Geneva, we conducted a thorough analysis of the city’s existing GIS structure ..." }, { "id": 474, "title": "Downtown Wayfinding", "linkz": "https:\/\/kapurengineers.com\/case-studies\/downtown-wayfinding\/", "category": "Municipal", "filter": "Asset Management,Civic,Local Roads,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/20191029_151822.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When Kapur was selected as the Engineer of Record for the City of Lake Geneva, one of the first projects we delivered was an updated ..." }, { "id": 473, "title": "Civic Campus Redevelopment", "linkz": "https:\/\/kapurengineers.com\/case-studies\/civic-campus-redevelopment\/", "category": "Landscape Architecture, Municipal, Site Design", "filter": "Civic,Green Space,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A0526.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "For many years the Village of Mount Pleasant, Wisconsin, staff worked in a cramped, outdated, urban property set in the retail-first area of the village." }, { "id": 472, "title": "Milwaukee Bucks Arena District Site Design", "linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-bucks-arena-district-site-design\/", "category": "Landscape Architecture, Site Design", "filter": "Athletics,Commercial,Green Space,Hospitality,Mapping,Mixed Use,Scanning,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/2022-Fiserv-Forum-Deer-District_1.png", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Bucks had outgrown their dated facility, so the team began searching for a new location and assembling a team to assist with planning ..." }, { "id": 471, "title": "The Corners of Brookfield Retail Development", "linkz": "https:\/\/kapurengineers.com\/case-studies\/the-corners-of-brookfield-retail-development\/", "category": "Landscape Architecture, Site Design, Structural, Survey", "filter": "ALTA\/CSM,Commercial,Easements,Green Space,Hospitality,Mixed Use,Study,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Von-Maur-1.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The client, Marcus Corporation, aimed to create a space based on the Suburban Town Center model in Brookfield, Wisconsin, west of the City of Milwaukee.Marcus ..." }, { "id": 470, "title": "Cristo Rey Jesuit High School Environmental Investigation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/cristo-rey-jesuit-high-school-environmental-investigation\/", "category": "Environmental, Site Design, Survey", "filter": "Remediation,Site Assessment,Site Investigation,UST", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_0269.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "After first retaining Kapur for site design services, Cristo Rey Jesuit High School later selected Kapur to also provide environmental consulting for the redevelopment of ..." }, { "id": 469, "title": "Harbor View Lofts Environmental Investigation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/harbor-view-lofts-environmental-investigation\/", "category": "Environmental, Survey", "filter": "Remediation,Site Assessment,Site Investigation,UST", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/34.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "As part of a property acquisition, LCM Funds selected Kapur to provide a Phase I Environmental Site Assessment (ESA).The Phase I ESA revealed the site ..." }, { "id": 468, "title": "Environmental Services for the Foxconn Development", "linkz": "https:\/\/kapurengineers.com\/case-studies\/environmental-services-for-the-foxconn-development\/", "category": "Environmental, Survey", "filter": "Asbestos,Lead,Remediation,Site Assessment,Site Investigation,UST", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_3903.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Village of Mount Pleasant selected Kapur to provide environmental consulting to facilitate the demolition of residential and commercial properties acquired by the Village in ..." }, { "id": 467, "title": "Former Pallet Company Environmental Site Assessment", "linkz": "https:\/\/kapurengineers.com\/case-studies\/former-pallet-company-environmental-site-assessment\/", "category": "Environmental, Survey", "filter": "Remediation,Site Assessment,Site Investigation", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Wetenkamp1.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was selected by the lender to provide a Records Search with Risk Assessment (RSRA) for the former Wetenkamp Pallet Company property in Newton, Wisconsin, ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." }, { "id": 499, "title": "Salt Dome, Brine Building, and Maintenance Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/", "category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural", "filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..." }, { "id": 498, "title": "Linwood Water Tunnel", "linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/", "category": "LiDAR, Structural, Survey, Water Services", "filter": "I&C,Mapping,Scanning,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..." }, { "id": 497, "title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus", "linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/", "category": "Landscape Architecture, Natural Resources, Site Design", "filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..." }, { "id": 496, "title": "Milwaukee River Flushing Station Foundation Restoration", "linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/", "category": "Landscape Architecture, Site Design, Structural", "filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..." }, { "id": 495, "title": "Ishnala Trail Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/", "category": "Structural", "filter": "Bridges", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..." }, { "id": 494, "title": "Glacier Hills Wind Park", "linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/", "category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey", "filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..." }, { "id": 493, "title": "Gas Main Replacement", "linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/", "category": "Municipal, Planning, Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..." }, { "id": 492, "title": "School District Master Planning", "linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/", "category": "Landscape Architecture, Planning, Site Design, Survey", "filter": "Athletics,Civic,Education,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..." }, { "id": 491, "title": "Conveyance Gate Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/", "category": "Electrical, Structural, Water Services", "filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..." }, { "id": 490, "title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/", "category": "Electrical, Water Services", "filter": "Buildings,I&C,Power Distribution,Treatment Plant", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..." }, { "id": 489, "title": "We Energies Environmental Training", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/", "category": "Environmental, Natural Resources, Power & Energy", "filter": "Erosion Control,Permitting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..." }, { "id": 488, "title": "Coal Pile Runoff and Air Quality", "linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/", "category": "Electrical, Power & Energy", "filter": "BIM,Mapping,Scanning,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..." }, { "id": 487, "title": "General Mitchell International Airport (GMIA) Redundant Feeder", "linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/", "category": "Electrical, Site Design", "filter": "Buildings,Power Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..." }, { "id": 486, "title": "Zoo Interchange Lighting", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/", "category": "Electrical", "filter": "Lighting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..." }, { "id": 485, "title": "Winnebago Street Roundabout", "linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/", "category": "Landscape Architecture, Transportation", "filter": "Intersection,Local Roads,Reconstruction,Roundabout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..." }, { "id": 484, "title": "I-94 North-South Public Involvement GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/", "category": "GIS, Transportation", "filter": "Bridges,Interchange,Interstate,Reconstruction", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..." }, { "id": 483, "title": "Kapur Internal Multi-Office GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/", "category": "GIS", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg", "mbl_crp": "50  ", "region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania", "xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..." }, { "id": 482, "title": "Lakeshore Lateral Pipeline GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/", "category": "GIS, Power & Energy, Survey, UAV", "filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..." }, { "id": 481, "title": "Schlitz Park Brewtown Square", "linkz": "https:\/\/kapurengineers.com\/case-studies\/schlitz-park-brewtown-square\/", "category": "Landscape Architecture, Site Design", "filter": "Corporate,Green Space,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5144.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Undeveloped property in downtown Milwaukee is at a premium. Without room for urban expansion, out-of-the-box alternatives are necessary to develop this area of the city. ..." }, { "id": 480, "title": "Milwaukee School of Engineering (MSOE) Athletic Complex", "linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-school-of-engineering-msoe-athletic-complex\/", "category": "Landscape Architecture, Site Design", "filter": "Athletics,Education,Mixed Use", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Pocket-Park-scaled.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When MSOE dreamed of a state-of-the-art athletic facility, Drs. Robert and Patricia Kern met the challenge by providing funds to acquire the land for the ..." }, { "id": 479, "title": "Village of Darien GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/village-of-darien-gis\/", "category": "GIS, Municipal, Survey", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/darien3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur is the\u00a0primary provider of engineering services for the Village of Darien. When Kapur was\u00a0awarded its first street reconstruction project with the Village of Darien ..." }, { "id": 478, "title": "City of Burlington GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-burlington-gis\/", "category": "GIS, Municipal, Survey", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Burlington_GIS2_Floodplain.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was in the process of collecting data for an old and rudimentary GIS when the City of Burlington decided to upgrade the site. Presented ..." }, { "id": 477, "title": "Zoo Interchange GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-gis\/", "category": "Environmental, GIS, Survey, Transportation", "filter": "Asset Management,Custom Software Tools,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Zoo-Web-GIS-Screen_Utilities_1.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange was a massive project reconstructing the I-94 and I-41 interchange in Milwaukee and Waukesha Counties in Wisconsin. A project this large required ..." }, { "id": 476, "title": "We Energies Gas Laterals", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-gas-laterals\/", "category": "GIS, Planning, Power & Energy, Survey", "filter": "Custom Software Tools,Easements,Extranet Applications,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/gis-nwl-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur won the design and survey contract for three separate laterals in Northwest Wisconsin. As part of the design solution, Kapur developed a GIS system ..." }, { "id": 475, "title": "City of Lake Geneva GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-lake-geneva-gis\/", "category": "GIS, Municipal, Survey", "filter": "Custom Software Tools,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LG_DNRMonitoringSitesEx.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Prior to serving as the Engineer of Record for the City of Lake Geneva, we conducted a thorough analysis of the city’s existing GIS structure ..." }, { "id": 474, "title": "Downtown Wayfinding", "linkz": "https:\/\/kapurengineers.com\/case-studies\/downtown-wayfinding\/", "category": "Municipal", "filter": "Asset Management,Civic,Local Roads,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/20191029_151822.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When Kapur was selected as the Engineer of Record for the City of Lake Geneva, one of the first projects we delivered was an updated ..." }, { "id": 473, "title": "Civic Campus Redevelopment", "linkz": "https:\/\/kapurengineers.com\/case-studies\/civic-campus-redevelopment\/", "category": "Landscape Architecture, Municipal, Site Design", "filter": "Civic,Green Space,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A0526.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "For many years the Village of Mount Pleasant, Wisconsin, staff worked in a cramped, outdated, urban property set in the retail-first area of the village." }, { "id": 472, "title": "Milwaukee Bucks Arena District Site Design", "linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-bucks-arena-district-site-design\/", "category": "Landscape Architecture, Site Design", "filter": "Athletics,Commercial,Green Space,Hospitality,Mapping,Mixed Use,Scanning,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/2022-Fiserv-Forum-Deer-District_1.png", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Bucks had outgrown their dated facility, so the team began searching for a new location and assembling a team to assist with planning ..." }, { "id": 471, "title": "The Corners of Brookfield Retail Development", "linkz": "https:\/\/kapurengineers.com\/case-studies\/the-corners-of-brookfield-retail-development\/", "category": "Landscape Architecture, Site Design, Structural, Survey", "filter": "ALTA\/CSM,Commercial,Easements,Green Space,Hospitality,Mixed Use,Study,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Von-Maur-1.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The client, Marcus Corporation, aimed to create a space based on the Suburban Town Center model in Brookfield, Wisconsin, west of the City of Milwaukee.Marcus ..." }, { "id": 470, "title": "Cristo Rey Jesuit High School Environmental Investigation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/cristo-rey-jesuit-high-school-environmental-investigation\/", "category": "Environmental, Site Design, Survey", "filter": "Remediation,Site Assessment,Site Investigation,UST", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_0269.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "After first retaining Kapur for site design services, Cristo Rey Jesuit High School later selected Kapur to also provide environmental consulting for the redevelopment of ..." }, { "id": 469, "title": "Harbor View Lofts Environmental Investigation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/harbor-view-lofts-environmental-investigation\/", "category": "Environmental, Survey", "filter": "Remediation,Site Assessment,Site Investigation,UST", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/34.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "As part of a property acquisition, LCM Funds selected Kapur to provide a Phase I Environmental Site Assessment (ESA).The Phase I ESA revealed the site ..." }, { "id": 468, "title": "Environmental Services for the Foxconn Development", "linkz": "https:\/\/kapurengineers.com\/case-studies\/environmental-services-for-the-foxconn-development\/", "category": "Environmental, Survey", "filter": "Asbestos,Lead,Remediation,Site Assessment,Site Investigation,UST", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_3903.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Village of Mount Pleasant selected Kapur to provide environmental consulting to facilitate the demolition of residential and commercial properties acquired by the Village in ..." }, { "id": 467, "title": "Former Pallet Company Environmental Site Assessment", "linkz": "https:\/\/kapurengineers.com\/case-studies\/former-pallet-company-environmental-site-assessment\/", "category": "Environmental, Survey", "filter": "Remediation,Site Assessment,Site Investigation", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Wetenkamp1.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was selected by the lender to provide a Records Search with Risk Assessment (RSRA) for the former Wetenkamp Pallet Company property in Newton, Wisconsin, ..." }, { "id": 466, "title": "Lift Station Design", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lift-station-design\/", "category": "Construction Management, Electrical, Municipal, Natural Resources, Planning, Site Design, Survey", "filter": "I&C,Sanitary Sewer,SCADA", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_5151.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The City of Plymouth, Wisconsin, planned to improve two lift stations and add a third to resolve issues with high flows within their sanitary sewer ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." }, { "id": 499, "title": "Salt Dome, Brine Building, and Maintenance Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/", "category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural", "filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..." }, { "id": 498, "title": "Linwood Water Tunnel", "linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/", "category": "LiDAR, Structural, Survey, Water Services", "filter": "I&C,Mapping,Scanning,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..." }, { "id": 497, "title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus", "linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/", "category": "Landscape Architecture, Natural Resources, Site Design", "filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..." }, { "id": 496, "title": "Milwaukee River Flushing Station Foundation Restoration", "linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/", "category": "Landscape Architecture, Site Design, Structural", "filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..." }, { "id": 495, "title": "Ishnala Trail Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/", "category": "Structural", "filter": "Bridges", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..." }, { "id": 494, "title": "Glacier Hills Wind Park", "linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/", "category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey", "filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..." }, { "id": 493, "title": "Gas Main Replacement", "linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/", "category": "Municipal, Planning, Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..." }, { "id": 492, "title": "School District Master Planning", "linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/", "category": "Landscape Architecture, Planning, Site Design, Survey", "filter": "Athletics,Civic,Education,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..." }, { "id": 491, "title": "Conveyance Gate Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/", "category": "Electrical, Structural, Water Services", "filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..." }, { "id": 490, "title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/", "category": "Electrical, Water Services", "filter": "Buildings,I&C,Power Distribution,Treatment Plant", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..." }, { "id": 489, "title": "We Energies Environmental Training", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/", "category": "Environmental, Natural Resources, Power & Energy", "filter": "Erosion Control,Permitting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..." }, { "id": 488, "title": "Coal Pile Runoff and Air Quality", "linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/", "category": "Electrical, Power & Energy", "filter": "BIM,Mapping,Scanning,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..." }, { "id": 487, "title": "General Mitchell International Airport (GMIA) Redundant Feeder", "linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/", "category": "Electrical, Site Design", "filter": "Buildings,Power Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..." }, { "id": 486, "title": "Zoo Interchange Lighting", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/", "category": "Electrical", "filter": "Lighting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..." }, { "id": 485, "title": "Winnebago Street Roundabout", "linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/", "category": "Landscape Architecture, Transportation", "filter": "Intersection,Local Roads,Reconstruction,Roundabout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..." }, { "id": 484, "title": "I-94 North-South Public Involvement GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/", "category": "GIS, Transportation", "filter": "Bridges,Interchange,Interstate,Reconstruction", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..." }, { "id": 483, "title": "Kapur Internal Multi-Office GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/", "category": "GIS", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg", "mbl_crp": "50  ", "region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania", "xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..." }, { "id": 482, "title": "Lakeshore Lateral Pipeline GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/", "category": "GIS, Power & Energy, Survey, UAV", "filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..." }, { "id": 481, "title": "Schlitz Park Brewtown Square", "linkz": "https:\/\/kapurengineers.com\/case-studies\/schlitz-park-brewtown-square\/", "category": "Landscape Architecture, Site Design", "filter": "Corporate,Green Space,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5144.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Undeveloped property in downtown Milwaukee is at a premium. Without room for urban expansion, out-of-the-box alternatives are necessary to develop this area of the city. ..." }, { "id": 480, "title": "Milwaukee School of Engineering (MSOE) Athletic Complex", "linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-school-of-engineering-msoe-athletic-complex\/", "category": "Landscape Architecture, Site Design", "filter": "Athletics,Education,Mixed Use", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Pocket-Park-scaled.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When MSOE dreamed of a state-of-the-art athletic facility, Drs. Robert and Patricia Kern met the challenge by providing funds to acquire the land for the ..." }, { "id": 479, "title": "Village of Darien GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/village-of-darien-gis\/", "category": "GIS, Municipal, Survey", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/darien3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur is the\u00a0primary provider of engineering services for the Village of Darien. When Kapur was\u00a0awarded its first street reconstruction project with the Village of Darien ..." }, { "id": 478, "title": "City of Burlington GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-burlington-gis\/", "category": "GIS, Municipal, Survey", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Burlington_GIS2_Floodplain.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was in the process of collecting data for an old and rudimentary GIS when the City of Burlington decided to upgrade the site. Presented ..." }, { "id": 477, "title": "Zoo Interchange GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-gis\/", "category": "Environmental, GIS, Survey, Transportation", "filter": "Asset Management,Custom Software Tools,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Zoo-Web-GIS-Screen_Utilities_1.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange was a massive project reconstructing the I-94 and I-41 interchange in Milwaukee and Waukesha Counties in Wisconsin. A project this large required ..." }, { "id": 476, "title": "We Energies Gas Laterals", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-gas-laterals\/", "category": "GIS, Planning, Power & Energy, Survey", "filter": "Custom Software Tools,Easements,Extranet Applications,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/gis-nwl-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur won the design and survey contract for three separate laterals in Northwest Wisconsin. As part of the design solution, Kapur developed a GIS system ..." }, { "id": 475, "title": "City of Lake Geneva GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-lake-geneva-gis\/", "category": "GIS, Municipal, Survey", "filter": "Custom Software Tools,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LG_DNRMonitoringSitesEx.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Prior to serving as the Engineer of Record for the City of Lake Geneva, we conducted a thorough analysis of the city’s existing GIS structure ..." }, { "id": 474, "title": "Downtown Wayfinding", "linkz": "https:\/\/kapurengineers.com\/case-studies\/downtown-wayfinding\/", "category": "Municipal", "filter": "Asset Management,Civic,Local Roads,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/20191029_151822.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When Kapur was selected as the Engineer of Record for the City of Lake Geneva, one of the first projects we delivered was an updated ..." }, { "id": 473, "title": "Civic Campus Redevelopment", "linkz": "https:\/\/kapurengineers.com\/case-studies\/civic-campus-redevelopment\/", "category": "Landscape Architecture, Municipal, Site Design", "filter": "Civic,Green Space,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A0526.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "For many years the Village of Mount Pleasant, Wisconsin, staff worked in a cramped, outdated, urban property set in the retail-first area of the village." }, { "id": 472, "title": "Milwaukee Bucks Arena District Site Design", "linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-bucks-arena-district-site-design\/", "category": "Landscape Architecture, Site Design", "filter": "Athletics,Commercial,Green Space,Hospitality,Mapping,Mixed Use,Scanning,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/2022-Fiserv-Forum-Deer-District_1.png", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Bucks had outgrown their dated facility, so the team began searching for a new location and assembling a team to assist with planning ..." }, { "id": 471, "title": "The Corners of Brookfield Retail Development", "linkz": "https:\/\/kapurengineers.com\/case-studies\/the-corners-of-brookfield-retail-development\/", "category": "Landscape Architecture, Site Design, Structural, Survey", "filter": "ALTA\/CSM,Commercial,Easements,Green Space,Hospitality,Mixed Use,Study,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Von-Maur-1.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The client, Marcus Corporation, aimed to create a space based on the Suburban Town Center model in Brookfield, Wisconsin, west of the City of Milwaukee.Marcus ..." }, { "id": 470, "title": "Cristo Rey Jesuit High School Environmental Investigation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/cristo-rey-jesuit-high-school-environmental-investigation\/", "category": "Environmental, Site Design, Survey", "filter": "Remediation,Site Assessment,Site Investigation,UST", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_0269.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "After first retaining Kapur for site design services, Cristo Rey Jesuit High School later selected Kapur to also provide environmental consulting for the redevelopment of ..." }, { "id": 469, "title": "Harbor View Lofts Environmental Investigation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/harbor-view-lofts-environmental-investigation\/", "category": "Environmental, Survey", "filter": "Remediation,Site Assessment,Site Investigation,UST", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/34.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "As part of a property acquisition, LCM Funds selected Kapur to provide a Phase I Environmental Site Assessment (ESA).The Phase I ESA revealed the site ..." }, { "id": 468, "title": "Environmental Services for the Foxconn Development", "linkz": "https:\/\/kapurengineers.com\/case-studies\/environmental-services-for-the-foxconn-development\/", "category": "Environmental, Survey", "filter": "Asbestos,Lead,Remediation,Site Assessment,Site Investigation,UST", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_3903.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Village of Mount Pleasant selected Kapur to provide environmental consulting to facilitate the demolition of residential and commercial properties acquired by the Village in ..." }, { "id": 467, "title": "Former Pallet Company Environmental Site Assessment", "linkz": "https:\/\/kapurengineers.com\/case-studies\/former-pallet-company-environmental-site-assessment\/", "category": "Environmental, Survey", "filter": "Remediation,Site Assessment,Site Investigation", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Wetenkamp1.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was selected by the lender to provide a Records Search with Risk Assessment (RSRA) for the former Wetenkamp Pallet Company property in Newton, Wisconsin, ..." }, { "id": 466, "title": "Lift Station Design", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lift-station-design\/", "category": "Construction Management, Electrical, Municipal, Natural Resources, Planning, Site Design, Survey", "filter": "I&C,Sanitary Sewer,SCADA", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_5151.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The City of Plymouth, Wisconsin, planned to improve two lift stations and add a third to resolve issues with high flows within their sanitary sewer ..." }, { "id": 465, "title": "Village-Wide Stormwater Management", "linkz": "https:\/\/kapurengineers.com\/case-studies\/village-wide-stormwater-management\/", "category": "Municipal, Site Design", "filter": "Rehabilitation,Storm Sewer,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Bayside-5.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Village of Bayside has a challenging, flat topography with clay soil composition that makes the design of efficient stormwater facilities critical to flood prevention. ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." }, { "id": 499, "title": "Salt Dome, Brine Building, and Maintenance Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/", "category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural", "filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..." }, { "id": 498, "title": "Linwood Water Tunnel", "linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/", "category": "LiDAR, Structural, Survey, Water Services", "filter": "I&C,Mapping,Scanning,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..." }, { "id": 497, "title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus", "linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/", "category": "Landscape Architecture, Natural Resources, Site Design", "filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..." }, { "id": 496, "title": "Milwaukee River Flushing Station Foundation Restoration", "linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/", "category": "Landscape Architecture, Site Design, Structural", "filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..." }, { "id": 495, "title": "Ishnala Trail Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/", "category": "Structural", "filter": "Bridges", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..." }, { "id": 494, "title": "Glacier Hills Wind Park", "linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/", "category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey", "filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..." }, { "id": 493, "title": "Gas Main Replacement", "linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/", "category": "Municipal, Planning, Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..." }, { "id": 492, "title": "School District Master Planning", "linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/", "category": "Landscape Architecture, Planning, Site Design, Survey", "filter": "Athletics,Civic,Education,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..." }, { "id": 491, "title": "Conveyance Gate Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/", "category": "Electrical, Structural, Water Services", "filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..." }, { "id": 490, "title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/", "category": "Electrical, Water Services", "filter": "Buildings,I&C,Power Distribution,Treatment Plant", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..." }, { "id": 489, "title": "We Energies Environmental Training", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/", "category": "Environmental, Natural Resources, Power & Energy", "filter": "Erosion Control,Permitting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..." }, { "id": 488, "title": "Coal Pile Runoff and Air Quality", "linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/", "category": "Electrical, Power & Energy", "filter": "BIM,Mapping,Scanning,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..." }, { "id": 487, "title": "General Mitchell International Airport (GMIA) Redundant Feeder", "linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/", "category": "Electrical, Site Design", "filter": "Buildings,Power Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..." }, { "id": 486, "title": "Zoo Interchange Lighting", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/", "category": "Electrical", "filter": "Lighting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..." }, { "id": 485, "title": "Winnebago Street Roundabout", "linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/", "category": "Landscape Architecture, Transportation", "filter": "Intersection,Local Roads,Reconstruction,Roundabout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..." }, { "id": 484, "title": "I-94 North-South Public Involvement GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/", "category": "GIS, Transportation", "filter": "Bridges,Interchange,Interstate,Reconstruction", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..." }, { "id": 483, "title": "Kapur Internal Multi-Office GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/", "category": "GIS", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg", "mbl_crp": "50  ", "region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania", "xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..." }, { "id": 482, "title": "Lakeshore Lateral Pipeline GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/", "category": "GIS, Power & Energy, Survey, UAV", "filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..." }, { "id": 481, "title": "Schlitz Park Brewtown Square", "linkz": "https:\/\/kapurengineers.com\/case-studies\/schlitz-park-brewtown-square\/", "category": "Landscape Architecture, Site Design", "filter": "Corporate,Green Space,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5144.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Undeveloped property in downtown Milwaukee is at a premium. Without room for urban expansion, out-of-the-box alternatives are necessary to develop this area of the city. ..." }, { "id": 480, "title": "Milwaukee School of Engineering (MSOE) Athletic Complex", "linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-school-of-engineering-msoe-athletic-complex\/", "category": "Landscape Architecture, Site Design", "filter": "Athletics,Education,Mixed Use", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Pocket-Park-scaled.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When MSOE dreamed of a state-of-the-art athletic facility, Drs. Robert and Patricia Kern met the challenge by providing funds to acquire the land for the ..." }, { "id": 479, "title": "Village of Darien GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/village-of-darien-gis\/", "category": "GIS, Municipal, Survey", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/darien3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur is the\u00a0primary provider of engineering services for the Village of Darien. When Kapur was\u00a0awarded its first street reconstruction project with the Village of Darien ..." }, { "id": 478, "title": "City of Burlington GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-burlington-gis\/", "category": "GIS, Municipal, Survey", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Burlington_GIS2_Floodplain.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was in the process of collecting data for an old and rudimentary GIS when the City of Burlington decided to upgrade the site. Presented ..." }, { "id": 477, "title": "Zoo Interchange GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-gis\/", "category": "Environmental, GIS, Survey, Transportation", "filter": "Asset Management,Custom Software Tools,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Zoo-Web-GIS-Screen_Utilities_1.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange was a massive project reconstructing the I-94 and I-41 interchange in Milwaukee and Waukesha Counties in Wisconsin. A project this large required ..." }, { "id": 476, "title": "We Energies Gas Laterals", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-gas-laterals\/", "category": "GIS, Planning, Power & Energy, Survey", "filter": "Custom Software Tools,Easements,Extranet Applications,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/gis-nwl-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur won the design and survey contract for three separate laterals in Northwest Wisconsin. As part of the design solution, Kapur developed a GIS system ..." }, { "id": 475, "title": "City of Lake Geneva GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-lake-geneva-gis\/", "category": "GIS, Municipal, Survey", "filter": "Custom Software Tools,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LG_DNRMonitoringSitesEx.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Prior to serving as the Engineer of Record for the City of Lake Geneva, we conducted a thorough analysis of the city’s existing GIS structure ..." }, { "id": 474, "title": "Downtown Wayfinding", "linkz": "https:\/\/kapurengineers.com\/case-studies\/downtown-wayfinding\/", "category": "Municipal", "filter": "Asset Management,Civic,Local Roads,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/20191029_151822.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When Kapur was selected as the Engineer of Record for the City of Lake Geneva, one of the first projects we delivered was an updated ..." }, { "id": 473, "title": "Civic Campus Redevelopment", "linkz": "https:\/\/kapurengineers.com\/case-studies\/civic-campus-redevelopment\/", "category": "Landscape Architecture, Municipal, Site Design", "filter": "Civic,Green Space,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A0526.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "For many years the Village of Mount Pleasant, Wisconsin, staff worked in a cramped, outdated, urban property set in the retail-first area of the village." }, { "id": 472, "title": "Milwaukee Bucks Arena District Site Design", "linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-bucks-arena-district-site-design\/", "category": "Landscape Architecture, Site Design", "filter": "Athletics,Commercial,Green Space,Hospitality,Mapping,Mixed Use,Scanning,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/2022-Fiserv-Forum-Deer-District_1.png", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Bucks had outgrown their dated facility, so the team began searching for a new location and assembling a team to assist with planning ..." }, { "id": 471, "title": "The Corners of Brookfield Retail Development", "linkz": "https:\/\/kapurengineers.com\/case-studies\/the-corners-of-brookfield-retail-development\/", "category": "Landscape Architecture, Site Design, Structural, Survey", "filter": "ALTA\/CSM,Commercial,Easements,Green Space,Hospitality,Mixed Use,Study,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Von-Maur-1.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The client, Marcus Corporation, aimed to create a space based on the Suburban Town Center model in Brookfield, Wisconsin, west of the City of Milwaukee.Marcus ..." }, { "id": 470, "title": "Cristo Rey Jesuit High School Environmental Investigation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/cristo-rey-jesuit-high-school-environmental-investigation\/", "category": "Environmental, Site Design, Survey", "filter": "Remediation,Site Assessment,Site Investigation,UST", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_0269.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "After first retaining Kapur for site design services, Cristo Rey Jesuit High School later selected Kapur to also provide environmental consulting for the redevelopment of ..." }, { "id": 469, "title": "Harbor View Lofts Environmental Investigation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/harbor-view-lofts-environmental-investigation\/", "category": "Environmental, Survey", "filter": "Remediation,Site Assessment,Site Investigation,UST", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/34.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "As part of a property acquisition, LCM Funds selected Kapur to provide a Phase I Environmental Site Assessment (ESA).The Phase I ESA revealed the site ..." }, { "id": 468, "title": "Environmental Services for the Foxconn Development", "linkz": "https:\/\/kapurengineers.com\/case-studies\/environmental-services-for-the-foxconn-development\/", "category": "Environmental, Survey", "filter": "Asbestos,Lead,Remediation,Site Assessment,Site Investigation,UST", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_3903.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Village of Mount Pleasant selected Kapur to provide environmental consulting to facilitate the demolition of residential and commercial properties acquired by the Village in ..." }, { "id": 467, "title": "Former Pallet Company Environmental Site Assessment", "linkz": "https:\/\/kapurengineers.com\/case-studies\/former-pallet-company-environmental-site-assessment\/", "category": "Environmental, Survey", "filter": "Remediation,Site Assessment,Site Investigation", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Wetenkamp1.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was selected by the lender to provide a Records Search with Risk Assessment (RSRA) for the former Wetenkamp Pallet Company property in Newton, Wisconsin, ..." }, { "id": 466, "title": "Lift Station Design", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lift-station-design\/", "category": "Construction Management, Electrical, Municipal, Natural Resources, Planning, Site Design, Survey", "filter": "I&C,Sanitary Sewer,SCADA", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_5151.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The City of Plymouth, Wisconsin, planned to improve two lift stations and add a third to resolve issues with high flows within their sanitary sewer ..." }, { "id": 465, "title": "Village-Wide Stormwater Management", "linkz": "https:\/\/kapurengineers.com\/case-studies\/village-wide-stormwater-management\/", "category": "Municipal, Site Design", "filter": "Rehabilitation,Storm Sewer,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Bayside-5.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Village of Bayside has a challenging, flat topography with clay soil composition that makes the design of efficient stormwater facilities critical to flood prevention. ..." }, { "id": 464, "title": "Sanitary Sewer Infiltration and Inflow (I&I) - Villages of Fox Point and Bayside", "linkz": "https:\/\/kapurengineers.com\/case-studies\/sanitary-sewer-infiltration-and-inflow-ii-village-of-fox-point-and-village-of-bayside\/", "category": "Municipal", "filter": "Rehabilitation,Sanitary Sewer,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/011.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The villages of Fox Point and Bayside experience some of the most I&I in the Milwaukee Metropolitan Sewerage District (MMSD) service area. Defects in pipes, ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." }, { "id": 499, "title": "Salt Dome, Brine Building, and Maintenance Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/", "category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural", "filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..." }, { "id": 498, "title": "Linwood Water Tunnel", "linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/", "category": "LiDAR, Structural, Survey, Water Services", "filter": "I&C,Mapping,Scanning,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..." }, { "id": 497, "title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus", "linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/", "category": "Landscape Architecture, Natural Resources, Site Design", "filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..." }, { "id": 496, "title": "Milwaukee River Flushing Station Foundation Restoration", "linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/", "category": "Landscape Architecture, Site Design, Structural", "filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..." }, { "id": 495, "title": "Ishnala Trail Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/", "category": "Structural", "filter": "Bridges", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..." }, { "id": 494, "title": "Glacier Hills Wind Park", "linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/", "category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey", "filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..." }, { "id": 493, "title": "Gas Main Replacement", "linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/", "category": "Municipal, Planning, Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..." }, { "id": 492, "title": "School District Master Planning", "linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/", "category": "Landscape Architecture, Planning, Site Design, Survey", "filter": "Athletics,Civic,Education,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..." }, { "id": 491, "title": "Conveyance Gate Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/", "category": "Electrical, Structural, Water Services", "filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..." }, { "id": 490, "title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/", "category": "Electrical, Water Services", "filter": "Buildings,I&C,Power Distribution,Treatment Plant", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..." }, { "id": 489, "title": "We Energies Environmental Training", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/", "category": "Environmental, Natural Resources, Power & Energy", "filter": "Erosion Control,Permitting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..." }, { "id": 488, "title": "Coal Pile Runoff and Air Quality", "linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/", "category": "Electrical, Power & Energy", "filter": "BIM,Mapping,Scanning,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..." }, { "id": 487, "title": "General Mitchell International Airport (GMIA) Redundant Feeder", "linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/", "category": "Electrical, Site Design", "filter": "Buildings,Power Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..." }, { "id": 486, "title": "Zoo Interchange Lighting", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/", "category": "Electrical", "filter": "Lighting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..." }, { "id": 485, "title": "Winnebago Street Roundabout", "linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/", "category": "Landscape Architecture, Transportation", "filter": "Intersection,Local Roads,Reconstruction,Roundabout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..." }, { "id": 484, "title": "I-94 North-South Public Involvement GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/", "category": "GIS, Transportation", "filter": "Bridges,Interchange,Interstate,Reconstruction", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..." }, { "id": 483, "title": "Kapur Internal Multi-Office GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/", "category": "GIS", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg", "mbl_crp": "50  ", "region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania", "xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..." }, { "id": 482, "title": "Lakeshore Lateral Pipeline GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/", "category": "GIS, Power & Energy, Survey, UAV", "filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..." }, { "id": 481, "title": "Schlitz Park Brewtown Square", "linkz": "https:\/\/kapurengineers.com\/case-studies\/schlitz-park-brewtown-square\/", "category": "Landscape Architecture, Site Design", "filter": "Corporate,Green Space,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5144.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Undeveloped property in downtown Milwaukee is at a premium. Without room for urban expansion, out-of-the-box alternatives are necessary to develop this area of the city. ..." }, { "id": 480, "title": "Milwaukee School of Engineering (MSOE) Athletic Complex", "linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-school-of-engineering-msoe-athletic-complex\/", "category": "Landscape Architecture, Site Design", "filter": "Athletics,Education,Mixed Use", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Pocket-Park-scaled.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When MSOE dreamed of a state-of-the-art athletic facility, Drs. Robert and Patricia Kern met the challenge by providing funds to acquire the land for the ..." }, { "id": 479, "title": "Village of Darien GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/village-of-darien-gis\/", "category": "GIS, Municipal, Survey", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/darien3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur is the\u00a0primary provider of engineering services for the Village of Darien. When Kapur was\u00a0awarded its first street reconstruction project with the Village of Darien ..." }, { "id": 478, "title": "City of Burlington GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-burlington-gis\/", "category": "GIS, Municipal, Survey", "filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Burlington_GIS2_Floodplain.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was in the process of collecting data for an old and rudimentary GIS when the City of Burlington decided to upgrade the site. Presented ..." }, { "id": 477, "title": "Zoo Interchange GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-gis\/", "category": "Environmental, GIS, Survey, Transportation", "filter": "Asset Management,Custom Software Tools,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Zoo-Web-GIS-Screen_Utilities_1.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange was a massive project reconstructing the I-94 and I-41 interchange in Milwaukee and Waukesha Counties in Wisconsin. A project this large required ..." }, { "id": 476, "title": "We Energies Gas Laterals", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-gas-laterals\/", "category": "GIS, Planning, Power & Energy, Survey", "filter": "Custom Software Tools,Easements,Extranet Applications,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/gis-nwl-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur won the design and survey contract for three separate laterals in Northwest Wisconsin. As part of the design solution, Kapur developed a GIS system ..." }, { "id": 475, "title": "City of Lake Geneva GIS", "linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-lake-geneva-gis\/", "category": "GIS, Municipal, Survey", "filter": "Custom Software Tools,Records Modernization,Web Development", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LG_DNRMonitoringSitesEx.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Prior to serving as the Engineer of Record for the City of Lake Geneva, we conducted a thorough analysis of the city’s existing GIS structure ..." }, { "id": 474, "title": "Downtown Wayfinding", "linkz": "https:\/\/kapurengineers.com\/case-studies\/downtown-wayfinding\/", "category": "Municipal", "filter": "Asset Management,Civic,Local Roads,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/20191029_151822.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When Kapur was selected as the Engineer of Record for the City of Lake Geneva, one of the first projects we delivered was an updated ..." }, { "id": 473, "title": "Civic Campus Redevelopment", "linkz": "https:\/\/kapurengineers.com\/case-studies\/civic-campus-redevelopment\/", "category": "Landscape Architecture, Municipal, Site Design", "filter": "Civic,Green Space,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A0526.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "For many years the Village of Mount Pleasant, Wisconsin, staff worked in a cramped, outdated, urban property set in the retail-first area of the village." }, { "id": 472, "title": "Milwaukee Bucks Arena District Site Design", "linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-bucks-arena-district-site-design\/", "category": "Landscape Architecture, Site Design", "filter": "Athletics,Commercial,Green Space,Hospitality,Mapping,Mixed Use,Scanning,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/2022-Fiserv-Forum-Deer-District_1.png", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Bucks had outgrown their dated facility, so the team began searching for a new location and assembling a team to assist with planning ..." }, { "id": 471, "title": "The Corners of Brookfield Retail Development", "linkz": "https:\/\/kapurengineers.com\/case-studies\/the-corners-of-brookfield-retail-development\/", "category": "Landscape Architecture, Site Design, Structural, Survey", "filter": "ALTA\/CSM,Commercial,Easements,Green Space,Hospitality,Mixed Use,Study,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Von-Maur-1.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The client, Marcus Corporation, aimed to create a space based on the Suburban Town Center model in Brookfield, Wisconsin, west of the City of Milwaukee.Marcus ..." }, { "id": 470, "title": "Cristo Rey Jesuit High School Environmental Investigation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/cristo-rey-jesuit-high-school-environmental-investigation\/", "category": "Environmental, Site Design, Survey", "filter": "Remediation,Site Assessment,Site Investigation,UST", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_0269.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "After first retaining Kapur for site design services, Cristo Rey Jesuit High School later selected Kapur to also provide environmental consulting for the redevelopment of ..." }, { "id": 469, "title": "Harbor View Lofts Environmental Investigation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/harbor-view-lofts-environmental-investigation\/", "category": "Environmental, Survey", "filter": "Remediation,Site Assessment,Site Investigation,UST", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/34.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "As part of a property acquisition, LCM Funds selected Kapur to provide a Phase I Environmental Site Assessment (ESA).The Phase I ESA revealed the site ..." }, { "id": 468, "title": "Environmental Services for the Foxconn Development", "linkz": "https:\/\/kapurengineers.com\/case-studies\/environmental-services-for-the-foxconn-development\/", "category": "Environmental, Survey", "filter": "Asbestos,Lead,Remediation,Site Assessment,Site Investigation,UST", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_3903.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Village of Mount Pleasant selected Kapur to provide environmental consulting to facilitate the demolition of residential and commercial properties acquired by the Village in ..." }, { "id": 467, "title": "Former Pallet Company Environmental Site Assessment", "linkz": "https:\/\/kapurengineers.com\/case-studies\/former-pallet-company-environmental-site-assessment\/", "category": "Environmental, Survey", "filter": "Remediation,Site Assessment,Site Investigation", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Wetenkamp1.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was selected by the lender to provide a Records Search with Risk Assessment (RSRA) for the former Wetenkamp Pallet Company property in Newton, Wisconsin, ..." }, { "id": 466, "title": "Lift Station Design", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lift-station-design\/", "category": "Construction Management, Electrical, Municipal, Natural Resources, Planning, Site Design, Survey", "filter": "I&C,Sanitary Sewer,SCADA", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_5151.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The City of Plymouth, Wisconsin, planned to improve two lift stations and add a third to resolve issues with high flows within their sanitary sewer ..." }, { "id": 465, "title": "Village-Wide Stormwater Management", "linkz": "https:\/\/kapurengineers.com\/case-studies\/village-wide-stormwater-management\/", "category": "Municipal, Site Design", "filter": "Rehabilitation,Storm Sewer,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Bayside-5.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Village of Bayside has a challenging, flat topography with clay soil composition that makes the design of efficient stormwater facilities critical to flood prevention. ..." }, { "id": 464, "title": "Sanitary Sewer Infiltration and Inflow (I&I) - Villages of Fox Point and Bayside", "linkz": "https:\/\/kapurengineers.com\/case-studies\/sanitary-sewer-infiltration-and-inflow-ii-village-of-fox-point-and-village-of-bayside\/", "category": "Municipal", "filter": "Rehabilitation,Sanitary Sewer,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/011.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The villages of Fox Point and Bayside experience some of the most I&I in the Milwaukee Metropolitan Sewerage District (MMSD) service area. Defects in pipes, ..." }, { "id": 463, "title": "Allen Street", "linkz": "https:\/\/kapurengineers.com\/case-studies\/allen-street\/", "category": "Construction Management, Municipal, Survey", "filter": "Intersection,Lighting,Local Roads,Platting,Reconstruction", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/allen_st.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Allen Street was the main road through Random Lake’s historic downtown. This area was predominantly flat, which caused drainage issues and accelerated pavement deterioration. Like ..." } ][ { "id": 2644, "title": "New Dermatology Group - Iron Mountain Clinic", "linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/", "category": "Site Design", "filter": "Commercial", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..." }, { "id": 1944, "title": "I-20 Ramp D Roadway and Bridge Construction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..." }, { "id": 1676, "title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/", "category": "Government Work, Quality Services", "filter": "Sanitary Sewer,Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur is the designer for the team selected for this design-build project." }, { "id": 1660, "title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range", "linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/", "category": "Government Work", "filter": "Quality Services", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..." }, { "id": 1272, "title": "Lake Street Bascule Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/", "category": "Survey", "filter": "Bridges,Scanning,Settlement", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..." }, { "id": 1128, "title": "O'Hare International Airport - American Airlines GEM Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/", "category": "3D Modeling, Survey", "filter": "AMG,BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion." }, { "id": 1250, "title": "I-74 Mississippi River Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/", "category": "Survey", "filter": "BIM,Bridges,Scanning,UAV", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg", "mbl_crp": "43  ", "region": "Illinois", "xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..." }, { "id": 1154, "title": "Lakefront Trail Renovation Project", "linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/", "category": "Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..." }, { "id": 1147, "title": "I-294 Mile Long Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/", "category": "3D Modeling, LiDAR, Survey", "filter": "AMG,Scanning,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..." }, { "id": 1137, "title": "O\u2019Hare International Airport - Runway 9C", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/", "category": "3D Modeling, Survey", "filter": "AMG,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..." }, { "id": 1117, "title": "O\u2019Hare International Airport - ARFF Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/", "category": "3D Modeling, Survey", "filter": "Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..." }, { "id": 1095, "title": "41st Street Pedestrian Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/", "category": "3D Modeling, Survey", "filter": "BIM,Staking & Layout", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg", "mbl_crp": "32  ", "region": "Illinois", "xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..." }, { "id": 1080, "title": "I-69 Reconstruction", "linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/", "category": "3D Modeling, LiDAR, Survey, UAV", "filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg", "mbl_crp": "50  ", "region": "Indiana", "xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..." }, { "id": 503, "title": "Peoples Gas Neighborhood Updates", "linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/", "category": "Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..." }, { "id": 502, "title": "Overhead to Underground Electrical Service Conversion", "linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/", "category": "Electrical, Power & Energy", "filter": "Electrical Distribution,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..." }, { "id": 501, "title": "130th Street and Torrence Avenue Truss Move", "linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/", "category": "3D Modeling, Planning, Survey", "filter": "AMG,BIM,Mapping,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..." }, { "id": 500, "title": "Elgin I-290 Interchange", "linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/", "category": "3D Modeling, LiDAR, Survey", "filter": "BIM,Mapping,UAV,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg", "mbl_crp": "50  ", "region": "Illinois", "xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..." }, { "id": 499, "title": "Salt Dome, Brine Building, and Maintenance Facility", "linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/", "category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural", "filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..." }, { "id": 498, "title": "Linwood Water Tunnel", "linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/", "category": "LiDAR, Structural, Survey, Water Services", "filter": "I&C,Mapping,Scanning,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..." }, { "id": 497, "title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus", "linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/", "category": "Landscape Architecture, Natural Resources, Site Design", "filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..." }, { "id": 496, "title": "Milwaukee River Flushing Station Foundation Restoration", "linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/", "category": "Landscape Architecture, Site Design, Structural", "filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..." }, { "id": 495, "title": "Ishnala Trail Bridge", "linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/", "category": "Structural", "filter": "Bridges", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..." }, { "id": 494, "title": "Glacier Hills Wind Park", "linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/", "category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey", "filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..." }, { "id": 493, "title": "Gas Main Replacement", "linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/", "category": "Municipal, Planning, Power & Energy, Survey", "filter": "Gas Distribution,Mapping,Scanning", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..." }, { "id": 492, "title": "School District Master Planning", "linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/", "category": "Landscape Architecture, Planning, Site Design, Survey", "filter": "Athletics,Civic,Education,Study", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..." }, { "id": 491, "title": "Conveyance Gate Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/", "category": "Electrical, Structural, Water Services", "filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..." }, { "id": 490, "title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation", "linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/", "category": "Electrical, Water Services", "filter": "Buildings,I&C,Power Distribution,Treatment Plant", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..." }, { "id": 489, "title": "We Energies Environmental Training", "linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/", "category": "Environmental, Natural Resources, Power & Energy", "filter": "Erosion Control,Permitting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..." }, { "id": 488, "title": "Coal Pile Runoff and Air Quality", "linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/", "category": "Electrical, Power & Energy", "filter": "BIM,Mapping,Scanning,Visualizations", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..." }, { "id": 487, "title": "General Mitchell International Airport (GMIA) Redundant Feeder", "linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/", "category": "Electrical, Site Design", "filter": "Buildings,Power Distribution", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..." }, { "id": 486, "title": "Zoo Interchange Lighting", "linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/", "category": "Electrical", "filter": "Lighting", "header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg", "mbl_crp": "50  ", "region": "Wisconsin", "xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 mile