[
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
},
{
"id": 499,
"title": "Salt Dome, Brine Building, and Maintenance Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/",
"category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural",
"filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
},
{
"id": 499,
"title": "Salt Dome, Brine Building, and Maintenance Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/",
"category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural",
"filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..."
},
{
"id": 498,
"title": "Linwood Water Tunnel",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/",
"category": "LiDAR, Structural, Survey, Water Services",
"filter": "I&C,Mapping,Scanning,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
},
{
"id": 499,
"title": "Salt Dome, Brine Building, and Maintenance Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/",
"category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural",
"filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..."
},
{
"id": 498,
"title": "Linwood Water Tunnel",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/",
"category": "LiDAR, Structural, Survey, Water Services",
"filter": "I&C,Mapping,Scanning,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..."
},
{
"id": 497,
"title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/",
"category": "Landscape Architecture, Natural Resources, Site Design",
"filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
},
{
"id": 499,
"title": "Salt Dome, Brine Building, and Maintenance Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/",
"category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural",
"filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..."
},
{
"id": 498,
"title": "Linwood Water Tunnel",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/",
"category": "LiDAR, Structural, Survey, Water Services",
"filter": "I&C,Mapping,Scanning,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..."
},
{
"id": 497,
"title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/",
"category": "Landscape Architecture, Natural Resources, Site Design",
"filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..."
},
{
"id": 496,
"title": "Milwaukee River Flushing Station Foundation Restoration",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/",
"category": "Landscape Architecture, Site Design, Structural",
"filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
},
{
"id": 499,
"title": "Salt Dome, Brine Building, and Maintenance Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/",
"category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural",
"filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..."
},
{
"id": 498,
"title": "Linwood Water Tunnel",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/",
"category": "LiDAR, Structural, Survey, Water Services",
"filter": "I&C,Mapping,Scanning,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..."
},
{
"id": 497,
"title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/",
"category": "Landscape Architecture, Natural Resources, Site Design",
"filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..."
},
{
"id": 496,
"title": "Milwaukee River Flushing Station Foundation Restoration",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/",
"category": "Landscape Architecture, Site Design, Structural",
"filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..."
},
{
"id": 495,
"title": "Ishnala Trail Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/",
"category": "Structural",
"filter": "Bridges",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
},
{
"id": 499,
"title": "Salt Dome, Brine Building, and Maintenance Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/",
"category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural",
"filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..."
},
{
"id": 498,
"title": "Linwood Water Tunnel",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/",
"category": "LiDAR, Structural, Survey, Water Services",
"filter": "I&C,Mapping,Scanning,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..."
},
{
"id": 497,
"title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/",
"category": "Landscape Architecture, Natural Resources, Site Design",
"filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..."
},
{
"id": 496,
"title": "Milwaukee River Flushing Station Foundation Restoration",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/",
"category": "Landscape Architecture, Site Design, Structural",
"filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..."
},
{
"id": 495,
"title": "Ishnala Trail Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/",
"category": "Structural",
"filter": "Bridges",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..."
},
{
"id": 494,
"title": "Glacier Hills Wind Park",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/",
"category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey",
"filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
},
{
"id": 499,
"title": "Salt Dome, Brine Building, and Maintenance Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/",
"category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural",
"filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..."
},
{
"id": 498,
"title": "Linwood Water Tunnel",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/",
"category": "LiDAR, Structural, Survey, Water Services",
"filter": "I&C,Mapping,Scanning,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..."
},
{
"id": 497,
"title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/",
"category": "Landscape Architecture, Natural Resources, Site Design",
"filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..."
},
{
"id": 496,
"title": "Milwaukee River Flushing Station Foundation Restoration",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/",
"category": "Landscape Architecture, Site Design, Structural",
"filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..."
},
{
"id": 495,
"title": "Ishnala Trail Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/",
"category": "Structural",
"filter": "Bridges",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..."
},
{
"id": 494,
"title": "Glacier Hills Wind Park",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/",
"category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey",
"filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..."
},
{
"id": 493,
"title": "Gas Main Replacement",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/",
"category": "Municipal, Planning, Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
},
{
"id": 499,
"title": "Salt Dome, Brine Building, and Maintenance Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/",
"category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural",
"filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..."
},
{
"id": 498,
"title": "Linwood Water Tunnel",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/",
"category": "LiDAR, Structural, Survey, Water Services",
"filter": "I&C,Mapping,Scanning,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..."
},
{
"id": 497,
"title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/",
"category": "Landscape Architecture, Natural Resources, Site Design",
"filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..."
},
{
"id": 496,
"title": "Milwaukee River Flushing Station Foundation Restoration",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/",
"category": "Landscape Architecture, Site Design, Structural",
"filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..."
},
{
"id": 495,
"title": "Ishnala Trail Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/",
"category": "Structural",
"filter": "Bridges",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..."
},
{
"id": 494,
"title": "Glacier Hills Wind Park",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/",
"category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey",
"filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..."
},
{
"id": 493,
"title": "Gas Main Replacement",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/",
"category": "Municipal, Planning, Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..."
},
{
"id": 492,
"title": "School District Master Planning",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/",
"category": "Landscape Architecture, Planning, Site Design, Survey",
"filter": "Athletics,Civic,Education,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
},
{
"id": 499,
"title": "Salt Dome, Brine Building, and Maintenance Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/",
"category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural",
"filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..."
},
{
"id": 498,
"title": "Linwood Water Tunnel",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/",
"category": "LiDAR, Structural, Survey, Water Services",
"filter": "I&C,Mapping,Scanning,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..."
},
{
"id": 497,
"title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/",
"category": "Landscape Architecture, Natural Resources, Site Design",
"filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..."
},
{
"id": 496,
"title": "Milwaukee River Flushing Station Foundation Restoration",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/",
"category": "Landscape Architecture, Site Design, Structural",
"filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..."
},
{
"id": 495,
"title": "Ishnala Trail Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/",
"category": "Structural",
"filter": "Bridges",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..."
},
{
"id": 494,
"title": "Glacier Hills Wind Park",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/",
"category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey",
"filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..."
},
{
"id": 493,
"title": "Gas Main Replacement",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/",
"category": "Municipal, Planning, Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..."
},
{
"id": 492,
"title": "School District Master Planning",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/",
"category": "Landscape Architecture, Planning, Site Design, Survey",
"filter": "Athletics,Civic,Education,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..."
},
{
"id": 491,
"title": "Conveyance Gate Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/",
"category": "Electrical, Structural, Water Services",
"filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
},
{
"id": 499,
"title": "Salt Dome, Brine Building, and Maintenance Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/",
"category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural",
"filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..."
},
{
"id": 498,
"title": "Linwood Water Tunnel",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/",
"category": "LiDAR, Structural, Survey, Water Services",
"filter": "I&C,Mapping,Scanning,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..."
},
{
"id": 497,
"title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/",
"category": "Landscape Architecture, Natural Resources, Site Design",
"filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..."
},
{
"id": 496,
"title": "Milwaukee River Flushing Station Foundation Restoration",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/",
"category": "Landscape Architecture, Site Design, Structural",
"filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..."
},
{
"id": 495,
"title": "Ishnala Trail Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/",
"category": "Structural",
"filter": "Bridges",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..."
},
{
"id": 494,
"title": "Glacier Hills Wind Park",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/",
"category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey",
"filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..."
},
{
"id": 493,
"title": "Gas Main Replacement",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/",
"category": "Municipal, Planning, Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..."
},
{
"id": 492,
"title": "School District Master Planning",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/",
"category": "Landscape Architecture, Planning, Site Design, Survey",
"filter": "Athletics,Civic,Education,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..."
},
{
"id": 491,
"title": "Conveyance Gate Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/",
"category": "Electrical, Structural, Water Services",
"filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..."
},
{
"id": 490,
"title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/",
"category": "Electrical, Water Services",
"filter": "Buildings,I&C,Power Distribution,Treatment Plant",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
},
{
"id": 499,
"title": "Salt Dome, Brine Building, and Maintenance Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/",
"category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural",
"filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..."
},
{
"id": 498,
"title": "Linwood Water Tunnel",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/",
"category": "LiDAR, Structural, Survey, Water Services",
"filter": "I&C,Mapping,Scanning,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..."
},
{
"id": 497,
"title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/",
"category": "Landscape Architecture, Natural Resources, Site Design",
"filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..."
},
{
"id": 496,
"title": "Milwaukee River Flushing Station Foundation Restoration",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/",
"category": "Landscape Architecture, Site Design, Structural",
"filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..."
},
{
"id": 495,
"title": "Ishnala Trail Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/",
"category": "Structural",
"filter": "Bridges",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..."
},
{
"id": 494,
"title": "Glacier Hills Wind Park",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/",
"category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey",
"filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..."
},
{
"id": 493,
"title": "Gas Main Replacement",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/",
"category": "Municipal, Planning, Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..."
},
{
"id": 492,
"title": "School District Master Planning",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/",
"category": "Landscape Architecture, Planning, Site Design, Survey",
"filter": "Athletics,Civic,Education,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..."
},
{
"id": 491,
"title": "Conveyance Gate Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/",
"category": "Electrical, Structural, Water Services",
"filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..."
},
{
"id": 490,
"title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/",
"category": "Electrical, Water Services",
"filter": "Buildings,I&C,Power Distribution,Treatment Plant",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..."
},
{
"id": 489,
"title": "We Energies Environmental Training",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/",
"category": "Environmental, Natural Resources, Power & Energy",
"filter": "Erosion Control,Permitting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
},
{
"id": 499,
"title": "Salt Dome, Brine Building, and Maintenance Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/",
"category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural",
"filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..."
},
{
"id": 498,
"title": "Linwood Water Tunnel",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/",
"category": "LiDAR, Structural, Survey, Water Services",
"filter": "I&C,Mapping,Scanning,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..."
},
{
"id": 497,
"title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/",
"category": "Landscape Architecture, Natural Resources, Site Design",
"filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..."
},
{
"id": 496,
"title": "Milwaukee River Flushing Station Foundation Restoration",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/",
"category": "Landscape Architecture, Site Design, Structural",
"filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..."
},
{
"id": 495,
"title": "Ishnala Trail Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/",
"category": "Structural",
"filter": "Bridges",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..."
},
{
"id": 494,
"title": "Glacier Hills Wind Park",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/",
"category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey",
"filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..."
},
{
"id": 493,
"title": "Gas Main Replacement",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/",
"category": "Municipal, Planning, Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..."
},
{
"id": 492,
"title": "School District Master Planning",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/",
"category": "Landscape Architecture, Planning, Site Design, Survey",
"filter": "Athletics,Civic,Education,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..."
},
{
"id": 491,
"title": "Conveyance Gate Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/",
"category": "Electrical, Structural, Water Services",
"filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..."
},
{
"id": 490,
"title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/",
"category": "Electrical, Water Services",
"filter": "Buildings,I&C,Power Distribution,Treatment Plant",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..."
},
{
"id": 489,
"title": "We Energies Environmental Training",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/",
"category": "Environmental, Natural Resources, Power & Energy",
"filter": "Erosion Control,Permitting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..."
},
{
"id": 488,
"title": "Coal Pile Runoff and Air Quality",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/",
"category": "Electrical, Power & Energy",
"filter": "BIM,Mapping,Scanning,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
},
{
"id": 499,
"title": "Salt Dome, Brine Building, and Maintenance Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/",
"category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural",
"filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..."
},
{
"id": 498,
"title": "Linwood Water Tunnel",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/",
"category": "LiDAR, Structural, Survey, Water Services",
"filter": "I&C,Mapping,Scanning,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..."
},
{
"id": 497,
"title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/",
"category": "Landscape Architecture, Natural Resources, Site Design",
"filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..."
},
{
"id": 496,
"title": "Milwaukee River Flushing Station Foundation Restoration",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/",
"category": "Landscape Architecture, Site Design, Structural",
"filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..."
},
{
"id": 495,
"title": "Ishnala Trail Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/",
"category": "Structural",
"filter": "Bridges",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..."
},
{
"id": 494,
"title": "Glacier Hills Wind Park",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/",
"category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey",
"filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..."
},
{
"id": 493,
"title": "Gas Main Replacement",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/",
"category": "Municipal, Planning, Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..."
},
{
"id": 492,
"title": "School District Master Planning",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/",
"category": "Landscape Architecture, Planning, Site Design, Survey",
"filter": "Athletics,Civic,Education,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..."
},
{
"id": 491,
"title": "Conveyance Gate Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/",
"category": "Electrical, Structural, Water Services",
"filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..."
},
{
"id": 490,
"title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/",
"category": "Electrical, Water Services",
"filter": "Buildings,I&C,Power Distribution,Treatment Plant",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..."
},
{
"id": 489,
"title": "We Energies Environmental Training",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/",
"category": "Environmental, Natural Resources, Power & Energy",
"filter": "Erosion Control,Permitting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..."
},
{
"id": 488,
"title": "Coal Pile Runoff and Air Quality",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/",
"category": "Electrical, Power & Energy",
"filter": "BIM,Mapping,Scanning,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..."
},
{
"id": 487,
"title": "General Mitchell International Airport (GMIA) Redundant Feeder",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/",
"category": "Electrical, Site Design",
"filter": "Buildings,Power Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
},
{
"id": 499,
"title": "Salt Dome, Brine Building, and Maintenance Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/",
"category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural",
"filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..."
},
{
"id": 498,
"title": "Linwood Water Tunnel",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/",
"category": "LiDAR, Structural, Survey, Water Services",
"filter": "I&C,Mapping,Scanning,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..."
},
{
"id": 497,
"title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/",
"category": "Landscape Architecture, Natural Resources, Site Design",
"filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..."
},
{
"id": 496,
"title": "Milwaukee River Flushing Station Foundation Restoration",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/",
"category": "Landscape Architecture, Site Design, Structural",
"filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..."
},
{
"id": 495,
"title": "Ishnala Trail Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/",
"category": "Structural",
"filter": "Bridges",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..."
},
{
"id": 494,
"title": "Glacier Hills Wind Park",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/",
"category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey",
"filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..."
},
{
"id": 493,
"title": "Gas Main Replacement",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/",
"category": "Municipal, Planning, Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..."
},
{
"id": 492,
"title": "School District Master Planning",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/",
"category": "Landscape Architecture, Planning, Site Design, Survey",
"filter": "Athletics,Civic,Education,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..."
},
{
"id": 491,
"title": "Conveyance Gate Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/",
"category": "Electrical, Structural, Water Services",
"filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..."
},
{
"id": 490,
"title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/",
"category": "Electrical, Water Services",
"filter": "Buildings,I&C,Power Distribution,Treatment Plant",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..."
},
{
"id": 489,
"title": "We Energies Environmental Training",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/",
"category": "Environmental, Natural Resources, Power & Energy",
"filter": "Erosion Control,Permitting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..."
},
{
"id": 488,
"title": "Coal Pile Runoff and Air Quality",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/",
"category": "Electrical, Power & Energy",
"filter": "BIM,Mapping,Scanning,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..."
},
{
"id": 487,
"title": "General Mitchell International Airport (GMIA) Redundant Feeder",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/",
"category": "Electrical, Site Design",
"filter": "Buildings,Power Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..."
},
{
"id": 486,
"title": "Zoo Interchange Lighting",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/",
"category": "Electrical",
"filter": "Lighting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
},
{
"id": 499,
"title": "Salt Dome, Brine Building, and Maintenance Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/",
"category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural",
"filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..."
},
{
"id": 498,
"title": "Linwood Water Tunnel",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/",
"category": "LiDAR, Structural, Survey, Water Services",
"filter": "I&C,Mapping,Scanning,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..."
},
{
"id": 497,
"title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/",
"category": "Landscape Architecture, Natural Resources, Site Design",
"filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..."
},
{
"id": 496,
"title": "Milwaukee River Flushing Station Foundation Restoration",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/",
"category": "Landscape Architecture, Site Design, Structural",
"filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..."
},
{
"id": 495,
"title": "Ishnala Trail Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/",
"category": "Structural",
"filter": "Bridges",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..."
},
{
"id": 494,
"title": "Glacier Hills Wind Park",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/",
"category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey",
"filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..."
},
{
"id": 493,
"title": "Gas Main Replacement",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/",
"category": "Municipal, Planning, Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..."
},
{
"id": 492,
"title": "School District Master Planning",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/",
"category": "Landscape Architecture, Planning, Site Design, Survey",
"filter": "Athletics,Civic,Education,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..."
},
{
"id": 491,
"title": "Conveyance Gate Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/",
"category": "Electrical, Structural, Water Services",
"filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..."
},
{
"id": 490,
"title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/",
"category": "Electrical, Water Services",
"filter": "Buildings,I&C,Power Distribution,Treatment Plant",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..."
},
{
"id": 489,
"title": "We Energies Environmental Training",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/",
"category": "Environmental, Natural Resources, Power & Energy",
"filter": "Erosion Control,Permitting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..."
},
{
"id": 488,
"title": "Coal Pile Runoff and Air Quality",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/",
"category": "Electrical, Power & Energy",
"filter": "BIM,Mapping,Scanning,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..."
},
{
"id": 487,
"title": "General Mitchell International Airport (GMIA) Redundant Feeder",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/",
"category": "Electrical, Site Design",
"filter": "Buildings,Power Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..."
},
{
"id": 486,
"title": "Zoo Interchange Lighting",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/",
"category": "Electrical",
"filter": "Lighting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..."
},
{
"id": 485,
"title": "Winnebago Street Roundabout",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/",
"category": "Landscape Architecture, Transportation",
"filter": "Intersection,Local Roads,Reconstruction,Roundabout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
},
{
"id": 499,
"title": "Salt Dome, Brine Building, and Maintenance Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/",
"category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural",
"filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..."
},
{
"id": 498,
"title": "Linwood Water Tunnel",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/",
"category": "LiDAR, Structural, Survey, Water Services",
"filter": "I&C,Mapping,Scanning,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..."
},
{
"id": 497,
"title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/",
"category": "Landscape Architecture, Natural Resources, Site Design",
"filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..."
},
{
"id": 496,
"title": "Milwaukee River Flushing Station Foundation Restoration",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/",
"category": "Landscape Architecture, Site Design, Structural",
"filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..."
},
{
"id": 495,
"title": "Ishnala Trail Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/",
"category": "Structural",
"filter": "Bridges",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..."
},
{
"id": 494,
"title": "Glacier Hills Wind Park",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/",
"category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey",
"filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..."
},
{
"id": 493,
"title": "Gas Main Replacement",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/",
"category": "Municipal, Planning, Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..."
},
{
"id": 492,
"title": "School District Master Planning",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/",
"category": "Landscape Architecture, Planning, Site Design, Survey",
"filter": "Athletics,Civic,Education,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..."
},
{
"id": 491,
"title": "Conveyance Gate Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/",
"category": "Electrical, Structural, Water Services",
"filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..."
},
{
"id": 490,
"title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/",
"category": "Electrical, Water Services",
"filter": "Buildings,I&C,Power Distribution,Treatment Plant",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..."
},
{
"id": 489,
"title": "We Energies Environmental Training",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/",
"category": "Environmental, Natural Resources, Power & Energy",
"filter": "Erosion Control,Permitting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..."
},
{
"id": 488,
"title": "Coal Pile Runoff and Air Quality",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/",
"category": "Electrical, Power & Energy",
"filter": "BIM,Mapping,Scanning,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..."
},
{
"id": 487,
"title": "General Mitchell International Airport (GMIA) Redundant Feeder",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/",
"category": "Electrical, Site Design",
"filter": "Buildings,Power Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..."
},
{
"id": 486,
"title": "Zoo Interchange Lighting",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/",
"category": "Electrical",
"filter": "Lighting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..."
},
{
"id": 485,
"title": "Winnebago Street Roundabout",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/",
"category": "Landscape Architecture, Transportation",
"filter": "Intersection,Local Roads,Reconstruction,Roundabout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..."
},
{
"id": 484,
"title": "I-94 North-South Public Involvement GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/",
"category": "GIS, Transportation",
"filter": "Bridges,Interchange,Interstate,Reconstruction",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
},
{
"id": 499,
"title": "Salt Dome, Brine Building, and Maintenance Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/",
"category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural",
"filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..."
},
{
"id": 498,
"title": "Linwood Water Tunnel",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/",
"category": "LiDAR, Structural, Survey, Water Services",
"filter": "I&C,Mapping,Scanning,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..."
},
{
"id": 497,
"title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/",
"category": "Landscape Architecture, Natural Resources, Site Design",
"filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..."
},
{
"id": 496,
"title": "Milwaukee River Flushing Station Foundation Restoration",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/",
"category": "Landscape Architecture, Site Design, Structural",
"filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..."
},
{
"id": 495,
"title": "Ishnala Trail Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/",
"category": "Structural",
"filter": "Bridges",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..."
},
{
"id": 494,
"title": "Glacier Hills Wind Park",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/",
"category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey",
"filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..."
},
{
"id": 493,
"title": "Gas Main Replacement",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/",
"category": "Municipal, Planning, Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..."
},
{
"id": 492,
"title": "School District Master Planning",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/",
"category": "Landscape Architecture, Planning, Site Design, Survey",
"filter": "Athletics,Civic,Education,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..."
},
{
"id": 491,
"title": "Conveyance Gate Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/",
"category": "Electrical, Structural, Water Services",
"filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..."
},
{
"id": 490,
"title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/",
"category": "Electrical, Water Services",
"filter": "Buildings,I&C,Power Distribution,Treatment Plant",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..."
},
{
"id": 489,
"title": "We Energies Environmental Training",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/",
"category": "Environmental, Natural Resources, Power & Energy",
"filter": "Erosion Control,Permitting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..."
},
{
"id": 488,
"title": "Coal Pile Runoff and Air Quality",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/",
"category": "Electrical, Power & Energy",
"filter": "BIM,Mapping,Scanning,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..."
},
{
"id": 487,
"title": "General Mitchell International Airport (GMIA) Redundant Feeder",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/",
"category": "Electrical, Site Design",
"filter": "Buildings,Power Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..."
},
{
"id": 486,
"title": "Zoo Interchange Lighting",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/",
"category": "Electrical",
"filter": "Lighting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..."
},
{
"id": 485,
"title": "Winnebago Street Roundabout",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/",
"category": "Landscape Architecture, Transportation",
"filter": "Intersection,Local Roads,Reconstruction,Roundabout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..."
},
{
"id": 484,
"title": "I-94 North-South Public Involvement GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/",
"category": "GIS, Transportation",
"filter": "Bridges,Interchange,Interstate,Reconstruction",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..."
},
{
"id": 483,
"title": "Kapur Internal Multi-Office GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/",
"category": "GIS",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania",
"xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
},
{
"id": 499,
"title": "Salt Dome, Brine Building, and Maintenance Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/",
"category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural",
"filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..."
},
{
"id": 498,
"title": "Linwood Water Tunnel",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/",
"category": "LiDAR, Structural, Survey, Water Services",
"filter": "I&C,Mapping,Scanning,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..."
},
{
"id": 497,
"title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/",
"category": "Landscape Architecture, Natural Resources, Site Design",
"filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..."
},
{
"id": 496,
"title": "Milwaukee River Flushing Station Foundation Restoration",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/",
"category": "Landscape Architecture, Site Design, Structural",
"filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..."
},
{
"id": 495,
"title": "Ishnala Trail Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/",
"category": "Structural",
"filter": "Bridges",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..."
},
{
"id": 494,
"title": "Glacier Hills Wind Park",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/",
"category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey",
"filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..."
},
{
"id": 493,
"title": "Gas Main Replacement",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/",
"category": "Municipal, Planning, Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..."
},
{
"id": 492,
"title": "School District Master Planning",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/",
"category": "Landscape Architecture, Planning, Site Design, Survey",
"filter": "Athletics,Civic,Education,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..."
},
{
"id": 491,
"title": "Conveyance Gate Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/",
"category": "Electrical, Structural, Water Services",
"filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..."
},
{
"id": 490,
"title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/",
"category": "Electrical, Water Services",
"filter": "Buildings,I&C,Power Distribution,Treatment Plant",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..."
},
{
"id": 489,
"title": "We Energies Environmental Training",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/",
"category": "Environmental, Natural Resources, Power & Energy",
"filter": "Erosion Control,Permitting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..."
},
{
"id": 488,
"title": "Coal Pile Runoff and Air Quality",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/",
"category": "Electrical, Power & Energy",
"filter": "BIM,Mapping,Scanning,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..."
},
{
"id": 487,
"title": "General Mitchell International Airport (GMIA) Redundant Feeder",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/",
"category": "Electrical, Site Design",
"filter": "Buildings,Power Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..."
},
{
"id": 486,
"title": "Zoo Interchange Lighting",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/",
"category": "Electrical",
"filter": "Lighting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..."
},
{
"id": 485,
"title": "Winnebago Street Roundabout",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/",
"category": "Landscape Architecture, Transportation",
"filter": "Intersection,Local Roads,Reconstruction,Roundabout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..."
},
{
"id": 484,
"title": "I-94 North-South Public Involvement GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/",
"category": "GIS, Transportation",
"filter": "Bridges,Interchange,Interstate,Reconstruction",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..."
},
{
"id": 483,
"title": "Kapur Internal Multi-Office GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/",
"category": "GIS",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania",
"xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..."
},
{
"id": 482,
"title": "Lakeshore Lateral Pipeline GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/",
"category": "GIS, Power & Energy, Survey, UAV",
"filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
},
{
"id": 499,
"title": "Salt Dome, Brine Building, and Maintenance Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/",
"category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural",
"filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..."
},
{
"id": 498,
"title": "Linwood Water Tunnel",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/",
"category": "LiDAR, Structural, Survey, Water Services",
"filter": "I&C,Mapping,Scanning,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..."
},
{
"id": 497,
"title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/",
"category": "Landscape Architecture, Natural Resources, Site Design",
"filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..."
},
{
"id": 496,
"title": "Milwaukee River Flushing Station Foundation Restoration",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/",
"category": "Landscape Architecture, Site Design, Structural",
"filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..."
},
{
"id": 495,
"title": "Ishnala Trail Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/",
"category": "Structural",
"filter": "Bridges",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..."
},
{
"id": 494,
"title": "Glacier Hills Wind Park",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/",
"category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey",
"filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..."
},
{
"id": 493,
"title": "Gas Main Replacement",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/",
"category": "Municipal, Planning, Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..."
},
{
"id": 492,
"title": "School District Master Planning",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/",
"category": "Landscape Architecture, Planning, Site Design, Survey",
"filter": "Athletics,Civic,Education,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..."
},
{
"id": 491,
"title": "Conveyance Gate Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/",
"category": "Electrical, Structural, Water Services",
"filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..."
},
{
"id": 490,
"title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/",
"category": "Electrical, Water Services",
"filter": "Buildings,I&C,Power Distribution,Treatment Plant",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..."
},
{
"id": 489,
"title": "We Energies Environmental Training",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/",
"category": "Environmental, Natural Resources, Power & Energy",
"filter": "Erosion Control,Permitting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..."
},
{
"id": 488,
"title": "Coal Pile Runoff and Air Quality",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/",
"category": "Electrical, Power & Energy",
"filter": "BIM,Mapping,Scanning,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..."
},
{
"id": 487,
"title": "General Mitchell International Airport (GMIA) Redundant Feeder",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/",
"category": "Electrical, Site Design",
"filter": "Buildings,Power Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..."
},
{
"id": 486,
"title": "Zoo Interchange Lighting",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/",
"category": "Electrical",
"filter": "Lighting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..."
},
{
"id": 485,
"title": "Winnebago Street Roundabout",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/",
"category": "Landscape Architecture, Transportation",
"filter": "Intersection,Local Roads,Reconstruction,Roundabout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..."
},
{
"id": 484,
"title": "I-94 North-South Public Involvement GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/",
"category": "GIS, Transportation",
"filter": "Bridges,Interchange,Interstate,Reconstruction",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..."
},
{
"id": 483,
"title": "Kapur Internal Multi-Office GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/",
"category": "GIS",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania",
"xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..."
},
{
"id": 482,
"title": "Lakeshore Lateral Pipeline GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/",
"category": "GIS, Power & Energy, Survey, UAV",
"filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..."
},
{
"id": 481,
"title": "Schlitz Park Brewtown Square",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/schlitz-park-brewtown-square\/",
"category": "Landscape Architecture, Site Design",
"filter": "Corporate,Green Space,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5144.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Undeveloped property in downtown Milwaukee is at a premium. Without room for urban expansion, out-of-the-box alternatives are necessary to develop this area of the city. ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
},
{
"id": 499,
"title": "Salt Dome, Brine Building, and Maintenance Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/",
"category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural",
"filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..."
},
{
"id": 498,
"title": "Linwood Water Tunnel",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/",
"category": "LiDAR, Structural, Survey, Water Services",
"filter": "I&C,Mapping,Scanning,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..."
},
{
"id": 497,
"title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/",
"category": "Landscape Architecture, Natural Resources, Site Design",
"filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..."
},
{
"id": 496,
"title": "Milwaukee River Flushing Station Foundation Restoration",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/",
"category": "Landscape Architecture, Site Design, Structural",
"filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..."
},
{
"id": 495,
"title": "Ishnala Trail Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/",
"category": "Structural",
"filter": "Bridges",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..."
},
{
"id": 494,
"title": "Glacier Hills Wind Park",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/",
"category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey",
"filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..."
},
{
"id": 493,
"title": "Gas Main Replacement",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/",
"category": "Municipal, Planning, Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..."
},
{
"id": 492,
"title": "School District Master Planning",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/",
"category": "Landscape Architecture, Planning, Site Design, Survey",
"filter": "Athletics,Civic,Education,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..."
},
{
"id": 491,
"title": "Conveyance Gate Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/",
"category": "Electrical, Structural, Water Services",
"filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..."
},
{
"id": 490,
"title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/",
"category": "Electrical, Water Services",
"filter": "Buildings,I&C,Power Distribution,Treatment Plant",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..."
},
{
"id": 489,
"title": "We Energies Environmental Training",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/",
"category": "Environmental, Natural Resources, Power & Energy",
"filter": "Erosion Control,Permitting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..."
},
{
"id": 488,
"title": "Coal Pile Runoff and Air Quality",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/",
"category": "Electrical, Power & Energy",
"filter": "BIM,Mapping,Scanning,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..."
},
{
"id": 487,
"title": "General Mitchell International Airport (GMIA) Redundant Feeder",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/",
"category": "Electrical, Site Design",
"filter": "Buildings,Power Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..."
},
{
"id": 486,
"title": "Zoo Interchange Lighting",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/",
"category": "Electrical",
"filter": "Lighting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..."
},
{
"id": 485,
"title": "Winnebago Street Roundabout",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/",
"category": "Landscape Architecture, Transportation",
"filter": "Intersection,Local Roads,Reconstruction,Roundabout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..."
},
{
"id": 484,
"title": "I-94 North-South Public Involvement GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/",
"category": "GIS, Transportation",
"filter": "Bridges,Interchange,Interstate,Reconstruction",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..."
},
{
"id": 483,
"title": "Kapur Internal Multi-Office GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/",
"category": "GIS",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania",
"xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..."
},
{
"id": 482,
"title": "Lakeshore Lateral Pipeline GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/",
"category": "GIS, Power & Energy, Survey, UAV",
"filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..."
},
{
"id": 481,
"title": "Schlitz Park Brewtown Square",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/schlitz-park-brewtown-square\/",
"category": "Landscape Architecture, Site Design",
"filter": "Corporate,Green Space,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5144.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Undeveloped property in downtown Milwaukee is at a premium. Without room for urban expansion, out-of-the-box alternatives are necessary to develop this area of the city. ..."
},
{
"id": 480,
"title": "Milwaukee School of Engineering (MSOE) Athletic Complex",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-school-of-engineering-msoe-athletic-complex\/",
"category": "Landscape Architecture, Site Design",
"filter": "Athletics,Education,Mixed Use",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Pocket-Park-scaled.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When MSOE dreamed of a state-of-the-art athletic facility, Drs. Robert and Patricia Kern met the challenge by providing funds to acquire the land for the ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
},
{
"id": 499,
"title": "Salt Dome, Brine Building, and Maintenance Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/",
"category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural",
"filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..."
},
{
"id": 498,
"title": "Linwood Water Tunnel",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/",
"category": "LiDAR, Structural, Survey, Water Services",
"filter": "I&C,Mapping,Scanning,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..."
},
{
"id": 497,
"title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/",
"category": "Landscape Architecture, Natural Resources, Site Design",
"filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..."
},
{
"id": 496,
"title": "Milwaukee River Flushing Station Foundation Restoration",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/",
"category": "Landscape Architecture, Site Design, Structural",
"filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..."
},
{
"id": 495,
"title": "Ishnala Trail Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/",
"category": "Structural",
"filter": "Bridges",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..."
},
{
"id": 494,
"title": "Glacier Hills Wind Park",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/",
"category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey",
"filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..."
},
{
"id": 493,
"title": "Gas Main Replacement",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/",
"category": "Municipal, Planning, Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..."
},
{
"id": 492,
"title": "School District Master Planning",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/",
"category": "Landscape Architecture, Planning, Site Design, Survey",
"filter": "Athletics,Civic,Education,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..."
},
{
"id": 491,
"title": "Conveyance Gate Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/",
"category": "Electrical, Structural, Water Services",
"filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..."
},
{
"id": 490,
"title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/",
"category": "Electrical, Water Services",
"filter": "Buildings,I&C,Power Distribution,Treatment Plant",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..."
},
{
"id": 489,
"title": "We Energies Environmental Training",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/",
"category": "Environmental, Natural Resources, Power & Energy",
"filter": "Erosion Control,Permitting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..."
},
{
"id": 488,
"title": "Coal Pile Runoff and Air Quality",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/",
"category": "Electrical, Power & Energy",
"filter": "BIM,Mapping,Scanning,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..."
},
{
"id": 487,
"title": "General Mitchell International Airport (GMIA) Redundant Feeder",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/",
"category": "Electrical, Site Design",
"filter": "Buildings,Power Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..."
},
{
"id": 486,
"title": "Zoo Interchange Lighting",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/",
"category": "Electrical",
"filter": "Lighting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..."
},
{
"id": 485,
"title": "Winnebago Street Roundabout",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/",
"category": "Landscape Architecture, Transportation",
"filter": "Intersection,Local Roads,Reconstruction,Roundabout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..."
},
{
"id": 484,
"title": "I-94 North-South Public Involvement GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/",
"category": "GIS, Transportation",
"filter": "Bridges,Interchange,Interstate,Reconstruction",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..."
},
{
"id": 483,
"title": "Kapur Internal Multi-Office GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/",
"category": "GIS",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania",
"xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..."
},
{
"id": 482,
"title": "Lakeshore Lateral Pipeline GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/",
"category": "GIS, Power & Energy, Survey, UAV",
"filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..."
},
{
"id": 481,
"title": "Schlitz Park Brewtown Square",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/schlitz-park-brewtown-square\/",
"category": "Landscape Architecture, Site Design",
"filter": "Corporate,Green Space,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5144.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Undeveloped property in downtown Milwaukee is at a premium. Without room for urban expansion, out-of-the-box alternatives are necessary to develop this area of the city. ..."
},
{
"id": 480,
"title": "Milwaukee School of Engineering (MSOE) Athletic Complex",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-school-of-engineering-msoe-athletic-complex\/",
"category": "Landscape Architecture, Site Design",
"filter": "Athletics,Education,Mixed Use",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Pocket-Park-scaled.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When MSOE dreamed of a state-of-the-art athletic facility, Drs. Robert and Patricia Kern met the challenge by providing funds to acquire the land for the ..."
},
{
"id": 479,
"title": "Village of Darien GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/village-of-darien-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/darien3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur is the\u00a0primary provider of engineering services for the Village of Darien. When Kapur was\u00a0awarded its first street reconstruction project with the Village of Darien ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
},
{
"id": 499,
"title": "Salt Dome, Brine Building, and Maintenance Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/",
"category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural",
"filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..."
},
{
"id": 498,
"title": "Linwood Water Tunnel",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/",
"category": "LiDAR, Structural, Survey, Water Services",
"filter": "I&C,Mapping,Scanning,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..."
},
{
"id": 497,
"title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/",
"category": "Landscape Architecture, Natural Resources, Site Design",
"filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..."
},
{
"id": 496,
"title": "Milwaukee River Flushing Station Foundation Restoration",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/",
"category": "Landscape Architecture, Site Design, Structural",
"filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..."
},
{
"id": 495,
"title": "Ishnala Trail Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/",
"category": "Structural",
"filter": "Bridges",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..."
},
{
"id": 494,
"title": "Glacier Hills Wind Park",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/",
"category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey",
"filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..."
},
{
"id": 493,
"title": "Gas Main Replacement",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/",
"category": "Municipal, Planning, Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..."
},
{
"id": 492,
"title": "School District Master Planning",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/",
"category": "Landscape Architecture, Planning, Site Design, Survey",
"filter": "Athletics,Civic,Education,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..."
},
{
"id": 491,
"title": "Conveyance Gate Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/",
"category": "Electrical, Structural, Water Services",
"filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..."
},
{
"id": 490,
"title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/",
"category": "Electrical, Water Services",
"filter": "Buildings,I&C,Power Distribution,Treatment Plant",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..."
},
{
"id": 489,
"title": "We Energies Environmental Training",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/",
"category": "Environmental, Natural Resources, Power & Energy",
"filter": "Erosion Control,Permitting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..."
},
{
"id": 488,
"title": "Coal Pile Runoff and Air Quality",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/",
"category": "Electrical, Power & Energy",
"filter": "BIM,Mapping,Scanning,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..."
},
{
"id": 487,
"title": "General Mitchell International Airport (GMIA) Redundant Feeder",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/",
"category": "Electrical, Site Design",
"filter": "Buildings,Power Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..."
},
{
"id": 486,
"title": "Zoo Interchange Lighting",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/",
"category": "Electrical",
"filter": "Lighting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..."
},
{
"id": 485,
"title": "Winnebago Street Roundabout",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/",
"category": "Landscape Architecture, Transportation",
"filter": "Intersection,Local Roads,Reconstruction,Roundabout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..."
},
{
"id": 484,
"title": "I-94 North-South Public Involvement GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/",
"category": "GIS, Transportation",
"filter": "Bridges,Interchange,Interstate,Reconstruction",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..."
},
{
"id": 483,
"title": "Kapur Internal Multi-Office GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/",
"category": "GIS",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania",
"xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..."
},
{
"id": 482,
"title": "Lakeshore Lateral Pipeline GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/",
"category": "GIS, Power & Energy, Survey, UAV",
"filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..."
},
{
"id": 481,
"title": "Schlitz Park Brewtown Square",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/schlitz-park-brewtown-square\/",
"category": "Landscape Architecture, Site Design",
"filter": "Corporate,Green Space,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5144.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Undeveloped property in downtown Milwaukee is at a premium. Without room for urban expansion, out-of-the-box alternatives are necessary to develop this area of the city. ..."
},
{
"id": 480,
"title": "Milwaukee School of Engineering (MSOE) Athletic Complex",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-school-of-engineering-msoe-athletic-complex\/",
"category": "Landscape Architecture, Site Design",
"filter": "Athletics,Education,Mixed Use",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Pocket-Park-scaled.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When MSOE dreamed of a state-of-the-art athletic facility, Drs. Robert and Patricia Kern met the challenge by providing funds to acquire the land for the ..."
},
{
"id": 479,
"title": "Village of Darien GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/village-of-darien-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/darien3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur is the\u00a0primary provider of engineering services for the Village of Darien. When Kapur was\u00a0awarded its first street reconstruction project with the Village of Darien ..."
},
{
"id": 478,
"title": "City of Burlington GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-burlington-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Burlington_GIS2_Floodplain.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was in the process of collecting data for an old and rudimentary GIS when the City of Burlington decided to upgrade the site. Presented ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
},
{
"id": 499,
"title": "Salt Dome, Brine Building, and Maintenance Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/",
"category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural",
"filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..."
},
{
"id": 498,
"title": "Linwood Water Tunnel",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/",
"category": "LiDAR, Structural, Survey, Water Services",
"filter": "I&C,Mapping,Scanning,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..."
},
{
"id": 497,
"title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/",
"category": "Landscape Architecture, Natural Resources, Site Design",
"filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..."
},
{
"id": 496,
"title": "Milwaukee River Flushing Station Foundation Restoration",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/",
"category": "Landscape Architecture, Site Design, Structural",
"filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..."
},
{
"id": 495,
"title": "Ishnala Trail Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/",
"category": "Structural",
"filter": "Bridges",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..."
},
{
"id": 494,
"title": "Glacier Hills Wind Park",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/",
"category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey",
"filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..."
},
{
"id": 493,
"title": "Gas Main Replacement",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/",
"category": "Municipal, Planning, Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..."
},
{
"id": 492,
"title": "School District Master Planning",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/",
"category": "Landscape Architecture, Planning, Site Design, Survey",
"filter": "Athletics,Civic,Education,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..."
},
{
"id": 491,
"title": "Conveyance Gate Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/",
"category": "Electrical, Structural, Water Services",
"filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..."
},
{
"id": 490,
"title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/",
"category": "Electrical, Water Services",
"filter": "Buildings,I&C,Power Distribution,Treatment Plant",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..."
},
{
"id": 489,
"title": "We Energies Environmental Training",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/",
"category": "Environmental, Natural Resources, Power & Energy",
"filter": "Erosion Control,Permitting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..."
},
{
"id": 488,
"title": "Coal Pile Runoff and Air Quality",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/",
"category": "Electrical, Power & Energy",
"filter": "BIM,Mapping,Scanning,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..."
},
{
"id": 487,
"title": "General Mitchell International Airport (GMIA) Redundant Feeder",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/",
"category": "Electrical, Site Design",
"filter": "Buildings,Power Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..."
},
{
"id": 486,
"title": "Zoo Interchange Lighting",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/",
"category": "Electrical",
"filter": "Lighting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..."
},
{
"id": 485,
"title": "Winnebago Street Roundabout",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/",
"category": "Landscape Architecture, Transportation",
"filter": "Intersection,Local Roads,Reconstruction,Roundabout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..."
},
{
"id": 484,
"title": "I-94 North-South Public Involvement GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/",
"category": "GIS, Transportation",
"filter": "Bridges,Interchange,Interstate,Reconstruction",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..."
},
{
"id": 483,
"title": "Kapur Internal Multi-Office GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/",
"category": "GIS",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania",
"xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..."
},
{
"id": 482,
"title": "Lakeshore Lateral Pipeline GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/",
"category": "GIS, Power & Energy, Survey, UAV",
"filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..."
},
{
"id": 481,
"title": "Schlitz Park Brewtown Square",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/schlitz-park-brewtown-square\/",
"category": "Landscape Architecture, Site Design",
"filter": "Corporate,Green Space,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5144.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Undeveloped property in downtown Milwaukee is at a premium. Without room for urban expansion, out-of-the-box alternatives are necessary to develop this area of the city. ..."
},
{
"id": 480,
"title": "Milwaukee School of Engineering (MSOE) Athletic Complex",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-school-of-engineering-msoe-athletic-complex\/",
"category": "Landscape Architecture, Site Design",
"filter": "Athletics,Education,Mixed Use",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Pocket-Park-scaled.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When MSOE dreamed of a state-of-the-art athletic facility, Drs. Robert and Patricia Kern met the challenge by providing funds to acquire the land for the ..."
},
{
"id": 479,
"title": "Village of Darien GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/village-of-darien-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/darien3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur is the\u00a0primary provider of engineering services for the Village of Darien. When Kapur was\u00a0awarded its first street reconstruction project with the Village of Darien ..."
},
{
"id": 478,
"title": "City of Burlington GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-burlington-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Burlington_GIS2_Floodplain.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was in the process of collecting data for an old and rudimentary GIS when the City of Burlington decided to upgrade the site. Presented ..."
},
{
"id": 477,
"title": "Zoo Interchange GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-gis\/",
"category": "Environmental, GIS, Survey, Transportation",
"filter": "Asset Management,Custom Software Tools,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Zoo-Web-GIS-Screen_Utilities_1.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange was a massive project reconstructing the I-94 and I-41 interchange in Milwaukee and Waukesha Counties in Wisconsin. A project this large required ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
},
{
"id": 499,
"title": "Salt Dome, Brine Building, and Maintenance Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/",
"category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural",
"filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..."
},
{
"id": 498,
"title": "Linwood Water Tunnel",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/",
"category": "LiDAR, Structural, Survey, Water Services",
"filter": "I&C,Mapping,Scanning,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..."
},
{
"id": 497,
"title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/",
"category": "Landscape Architecture, Natural Resources, Site Design",
"filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..."
},
{
"id": 496,
"title": "Milwaukee River Flushing Station Foundation Restoration",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/",
"category": "Landscape Architecture, Site Design, Structural",
"filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..."
},
{
"id": 495,
"title": "Ishnala Trail Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/",
"category": "Structural",
"filter": "Bridges",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..."
},
{
"id": 494,
"title": "Glacier Hills Wind Park",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/",
"category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey",
"filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..."
},
{
"id": 493,
"title": "Gas Main Replacement",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/",
"category": "Municipal, Planning, Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..."
},
{
"id": 492,
"title": "School District Master Planning",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/",
"category": "Landscape Architecture, Planning, Site Design, Survey",
"filter": "Athletics,Civic,Education,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..."
},
{
"id": 491,
"title": "Conveyance Gate Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/",
"category": "Electrical, Structural, Water Services",
"filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..."
},
{
"id": 490,
"title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/",
"category": "Electrical, Water Services",
"filter": "Buildings,I&C,Power Distribution,Treatment Plant",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..."
},
{
"id": 489,
"title": "We Energies Environmental Training",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/",
"category": "Environmental, Natural Resources, Power & Energy",
"filter": "Erosion Control,Permitting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..."
},
{
"id": 488,
"title": "Coal Pile Runoff and Air Quality",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/",
"category": "Electrical, Power & Energy",
"filter": "BIM,Mapping,Scanning,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..."
},
{
"id": 487,
"title": "General Mitchell International Airport (GMIA) Redundant Feeder",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/",
"category": "Electrical, Site Design",
"filter": "Buildings,Power Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..."
},
{
"id": 486,
"title": "Zoo Interchange Lighting",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/",
"category": "Electrical",
"filter": "Lighting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..."
},
{
"id": 485,
"title": "Winnebago Street Roundabout",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/",
"category": "Landscape Architecture, Transportation",
"filter": "Intersection,Local Roads,Reconstruction,Roundabout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..."
},
{
"id": 484,
"title": "I-94 North-South Public Involvement GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/",
"category": "GIS, Transportation",
"filter": "Bridges,Interchange,Interstate,Reconstruction",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..."
},
{
"id": 483,
"title": "Kapur Internal Multi-Office GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/",
"category": "GIS",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania",
"xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..."
},
{
"id": 482,
"title": "Lakeshore Lateral Pipeline GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/",
"category": "GIS, Power & Energy, Survey, UAV",
"filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..."
},
{
"id": 481,
"title": "Schlitz Park Brewtown Square",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/schlitz-park-brewtown-square\/",
"category": "Landscape Architecture, Site Design",
"filter": "Corporate,Green Space,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5144.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Undeveloped property in downtown Milwaukee is at a premium. Without room for urban expansion, out-of-the-box alternatives are necessary to develop this area of the city. ..."
},
{
"id": 480,
"title": "Milwaukee School of Engineering (MSOE) Athletic Complex",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-school-of-engineering-msoe-athletic-complex\/",
"category": "Landscape Architecture, Site Design",
"filter": "Athletics,Education,Mixed Use",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Pocket-Park-scaled.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When MSOE dreamed of a state-of-the-art athletic facility, Drs. Robert and Patricia Kern met the challenge by providing funds to acquire the land for the ..."
},
{
"id": 479,
"title": "Village of Darien GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/village-of-darien-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/darien3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur is the\u00a0primary provider of engineering services for the Village of Darien. When Kapur was\u00a0awarded its first street reconstruction project with the Village of Darien ..."
},
{
"id": 478,
"title": "City of Burlington GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-burlington-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Burlington_GIS2_Floodplain.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was in the process of collecting data for an old and rudimentary GIS when the City of Burlington decided to upgrade the site. Presented ..."
},
{
"id": 477,
"title": "Zoo Interchange GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-gis\/",
"category": "Environmental, GIS, Survey, Transportation",
"filter": "Asset Management,Custom Software Tools,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Zoo-Web-GIS-Screen_Utilities_1.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange was a massive project reconstructing the I-94 and I-41 interchange in Milwaukee and Waukesha Counties in Wisconsin. A project this large required ..."
},
{
"id": 476,
"title": "We Energies Gas Laterals",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-gas-laterals\/",
"category": "GIS, Planning, Power & Energy, Survey",
"filter": "Custom Software Tools,Easements,Extranet Applications,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/gis-nwl-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur won the design and survey contract for three separate laterals in Northwest Wisconsin. As part of the design solution, Kapur developed a GIS system ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
},
{
"id": 499,
"title": "Salt Dome, Brine Building, and Maintenance Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/",
"category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural",
"filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..."
},
{
"id": 498,
"title": "Linwood Water Tunnel",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/",
"category": "LiDAR, Structural, Survey, Water Services",
"filter": "I&C,Mapping,Scanning,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..."
},
{
"id": 497,
"title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/",
"category": "Landscape Architecture, Natural Resources, Site Design",
"filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..."
},
{
"id": 496,
"title": "Milwaukee River Flushing Station Foundation Restoration",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/",
"category": "Landscape Architecture, Site Design, Structural",
"filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..."
},
{
"id": 495,
"title": "Ishnala Trail Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/",
"category": "Structural",
"filter": "Bridges",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..."
},
{
"id": 494,
"title": "Glacier Hills Wind Park",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/",
"category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey",
"filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..."
},
{
"id": 493,
"title": "Gas Main Replacement",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/",
"category": "Municipal, Planning, Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..."
},
{
"id": 492,
"title": "School District Master Planning",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/",
"category": "Landscape Architecture, Planning, Site Design, Survey",
"filter": "Athletics,Civic,Education,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..."
},
{
"id": 491,
"title": "Conveyance Gate Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/",
"category": "Electrical, Structural, Water Services",
"filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..."
},
{
"id": 490,
"title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/",
"category": "Electrical, Water Services",
"filter": "Buildings,I&C,Power Distribution,Treatment Plant",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..."
},
{
"id": 489,
"title": "We Energies Environmental Training",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/",
"category": "Environmental, Natural Resources, Power & Energy",
"filter": "Erosion Control,Permitting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..."
},
{
"id": 488,
"title": "Coal Pile Runoff and Air Quality",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/",
"category": "Electrical, Power & Energy",
"filter": "BIM,Mapping,Scanning,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..."
},
{
"id": 487,
"title": "General Mitchell International Airport (GMIA) Redundant Feeder",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/",
"category": "Electrical, Site Design",
"filter": "Buildings,Power Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..."
},
{
"id": 486,
"title": "Zoo Interchange Lighting",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/",
"category": "Electrical",
"filter": "Lighting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..."
},
{
"id": 485,
"title": "Winnebago Street Roundabout",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/",
"category": "Landscape Architecture, Transportation",
"filter": "Intersection,Local Roads,Reconstruction,Roundabout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..."
},
{
"id": 484,
"title": "I-94 North-South Public Involvement GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/",
"category": "GIS, Transportation",
"filter": "Bridges,Interchange,Interstate,Reconstruction",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..."
},
{
"id": 483,
"title": "Kapur Internal Multi-Office GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/",
"category": "GIS",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania",
"xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..."
},
{
"id": 482,
"title": "Lakeshore Lateral Pipeline GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/",
"category": "GIS, Power & Energy, Survey, UAV",
"filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..."
},
{
"id": 481,
"title": "Schlitz Park Brewtown Square",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/schlitz-park-brewtown-square\/",
"category": "Landscape Architecture, Site Design",
"filter": "Corporate,Green Space,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5144.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Undeveloped property in downtown Milwaukee is at a premium. Without room for urban expansion, out-of-the-box alternatives are necessary to develop this area of the city. ..."
},
{
"id": 480,
"title": "Milwaukee School of Engineering (MSOE) Athletic Complex",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-school-of-engineering-msoe-athletic-complex\/",
"category": "Landscape Architecture, Site Design",
"filter": "Athletics,Education,Mixed Use",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Pocket-Park-scaled.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When MSOE dreamed of a state-of-the-art athletic facility, Drs. Robert and Patricia Kern met the challenge by providing funds to acquire the land for the ..."
},
{
"id": 479,
"title": "Village of Darien GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/village-of-darien-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/darien3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur is the\u00a0primary provider of engineering services for the Village of Darien. When Kapur was\u00a0awarded its first street reconstruction project with the Village of Darien ..."
},
{
"id": 478,
"title": "City of Burlington GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-burlington-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Burlington_GIS2_Floodplain.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was in the process of collecting data for an old and rudimentary GIS when the City of Burlington decided to upgrade the site. Presented ..."
},
{
"id": 477,
"title": "Zoo Interchange GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-gis\/",
"category": "Environmental, GIS, Survey, Transportation",
"filter": "Asset Management,Custom Software Tools,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Zoo-Web-GIS-Screen_Utilities_1.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange was a massive project reconstructing the I-94 and I-41 interchange in Milwaukee and Waukesha Counties in Wisconsin. A project this large required ..."
},
{
"id": 476,
"title": "We Energies Gas Laterals",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-gas-laterals\/",
"category": "GIS, Planning, Power & Energy, Survey",
"filter": "Custom Software Tools,Easements,Extranet Applications,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/gis-nwl-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur won the design and survey contract for three separate laterals in Northwest Wisconsin. As part of the design solution, Kapur developed a GIS system ..."
},
{
"id": 475,
"title": "City of Lake Geneva GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-lake-geneva-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Custom Software Tools,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LG_DNRMonitoringSitesEx.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Prior to serving as the Engineer of Record for the City of Lake Geneva, we conducted a thorough analysis of the city’s existing GIS structure ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
},
{
"id": 499,
"title": "Salt Dome, Brine Building, and Maintenance Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/",
"category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural",
"filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..."
},
{
"id": 498,
"title": "Linwood Water Tunnel",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/",
"category": "LiDAR, Structural, Survey, Water Services",
"filter": "I&C,Mapping,Scanning,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..."
},
{
"id": 497,
"title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/",
"category": "Landscape Architecture, Natural Resources, Site Design",
"filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..."
},
{
"id": 496,
"title": "Milwaukee River Flushing Station Foundation Restoration",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/",
"category": "Landscape Architecture, Site Design, Structural",
"filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..."
},
{
"id": 495,
"title": "Ishnala Trail Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/",
"category": "Structural",
"filter": "Bridges",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..."
},
{
"id": 494,
"title": "Glacier Hills Wind Park",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/",
"category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey",
"filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..."
},
{
"id": 493,
"title": "Gas Main Replacement",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/",
"category": "Municipal, Planning, Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..."
},
{
"id": 492,
"title": "School District Master Planning",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/",
"category": "Landscape Architecture, Planning, Site Design, Survey",
"filter": "Athletics,Civic,Education,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..."
},
{
"id": 491,
"title": "Conveyance Gate Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/",
"category": "Electrical, Structural, Water Services",
"filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..."
},
{
"id": 490,
"title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/",
"category": "Electrical, Water Services",
"filter": "Buildings,I&C,Power Distribution,Treatment Plant",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..."
},
{
"id": 489,
"title": "We Energies Environmental Training",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/",
"category": "Environmental, Natural Resources, Power & Energy",
"filter": "Erosion Control,Permitting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..."
},
{
"id": 488,
"title": "Coal Pile Runoff and Air Quality",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/",
"category": "Electrical, Power & Energy",
"filter": "BIM,Mapping,Scanning,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..."
},
{
"id": 487,
"title": "General Mitchell International Airport (GMIA) Redundant Feeder",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/",
"category": "Electrical, Site Design",
"filter": "Buildings,Power Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..."
},
{
"id": 486,
"title": "Zoo Interchange Lighting",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/",
"category": "Electrical",
"filter": "Lighting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..."
},
{
"id": 485,
"title": "Winnebago Street Roundabout",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/",
"category": "Landscape Architecture, Transportation",
"filter": "Intersection,Local Roads,Reconstruction,Roundabout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..."
},
{
"id": 484,
"title": "I-94 North-South Public Involvement GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/",
"category": "GIS, Transportation",
"filter": "Bridges,Interchange,Interstate,Reconstruction",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..."
},
{
"id": 483,
"title": "Kapur Internal Multi-Office GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/",
"category": "GIS",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania",
"xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..."
},
{
"id": 482,
"title": "Lakeshore Lateral Pipeline GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/",
"category": "GIS, Power & Energy, Survey, UAV",
"filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..."
},
{
"id": 481,
"title": "Schlitz Park Brewtown Square",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/schlitz-park-brewtown-square\/",
"category": "Landscape Architecture, Site Design",
"filter": "Corporate,Green Space,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5144.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Undeveloped property in downtown Milwaukee is at a premium. Without room for urban expansion, out-of-the-box alternatives are necessary to develop this area of the city. ..."
},
{
"id": 480,
"title": "Milwaukee School of Engineering (MSOE) Athletic Complex",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-school-of-engineering-msoe-athletic-complex\/",
"category": "Landscape Architecture, Site Design",
"filter": "Athletics,Education,Mixed Use",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Pocket-Park-scaled.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When MSOE dreamed of a state-of-the-art athletic facility, Drs. Robert and Patricia Kern met the challenge by providing funds to acquire the land for the ..."
},
{
"id": 479,
"title": "Village of Darien GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/village-of-darien-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/darien3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur is the\u00a0primary provider of engineering services for the Village of Darien. When Kapur was\u00a0awarded its first street reconstruction project with the Village of Darien ..."
},
{
"id": 478,
"title": "City of Burlington GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-burlington-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Burlington_GIS2_Floodplain.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was in the process of collecting data for an old and rudimentary GIS when the City of Burlington decided to upgrade the site. Presented ..."
},
{
"id": 477,
"title": "Zoo Interchange GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-gis\/",
"category": "Environmental, GIS, Survey, Transportation",
"filter": "Asset Management,Custom Software Tools,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Zoo-Web-GIS-Screen_Utilities_1.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange was a massive project reconstructing the I-94 and I-41 interchange in Milwaukee and Waukesha Counties in Wisconsin. A project this large required ..."
},
{
"id": 476,
"title": "We Energies Gas Laterals",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-gas-laterals\/",
"category": "GIS, Planning, Power & Energy, Survey",
"filter": "Custom Software Tools,Easements,Extranet Applications,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/gis-nwl-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur won the design and survey contract for three separate laterals in Northwest Wisconsin. As part of the design solution, Kapur developed a GIS system ..."
},
{
"id": 475,
"title": "City of Lake Geneva GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-lake-geneva-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Custom Software Tools,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LG_DNRMonitoringSitesEx.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Prior to serving as the Engineer of Record for the City of Lake Geneva, we conducted a thorough analysis of the city’s existing GIS structure ..."
},
{
"id": 474,
"title": "Downtown Wayfinding",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/downtown-wayfinding\/",
"category": "Municipal",
"filter": "Asset Management,Civic,Local Roads,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/20191029_151822.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When Kapur was selected as the Engineer of Record for the City of Lake Geneva, one of the first projects we delivered was an updated ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
},
{
"id": 499,
"title": "Salt Dome, Brine Building, and Maintenance Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/",
"category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural",
"filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..."
},
{
"id": 498,
"title": "Linwood Water Tunnel",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/",
"category": "LiDAR, Structural, Survey, Water Services",
"filter": "I&C,Mapping,Scanning,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..."
},
{
"id": 497,
"title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/",
"category": "Landscape Architecture, Natural Resources, Site Design",
"filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..."
},
{
"id": 496,
"title": "Milwaukee River Flushing Station Foundation Restoration",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/",
"category": "Landscape Architecture, Site Design, Structural",
"filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..."
},
{
"id": 495,
"title": "Ishnala Trail Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/",
"category": "Structural",
"filter": "Bridges",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..."
},
{
"id": 494,
"title": "Glacier Hills Wind Park",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/",
"category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey",
"filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..."
},
{
"id": 493,
"title": "Gas Main Replacement",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/",
"category": "Municipal, Planning, Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..."
},
{
"id": 492,
"title": "School District Master Planning",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/",
"category": "Landscape Architecture, Planning, Site Design, Survey",
"filter": "Athletics,Civic,Education,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..."
},
{
"id": 491,
"title": "Conveyance Gate Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/",
"category": "Electrical, Structural, Water Services",
"filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..."
},
{
"id": 490,
"title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/",
"category": "Electrical, Water Services",
"filter": "Buildings,I&C,Power Distribution,Treatment Plant",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..."
},
{
"id": 489,
"title": "We Energies Environmental Training",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/",
"category": "Environmental, Natural Resources, Power & Energy",
"filter": "Erosion Control,Permitting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..."
},
{
"id": 488,
"title": "Coal Pile Runoff and Air Quality",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/",
"category": "Electrical, Power & Energy",
"filter": "BIM,Mapping,Scanning,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..."
},
{
"id": 487,
"title": "General Mitchell International Airport (GMIA) Redundant Feeder",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/",
"category": "Electrical, Site Design",
"filter": "Buildings,Power Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..."
},
{
"id": 486,
"title": "Zoo Interchange Lighting",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/",
"category": "Electrical",
"filter": "Lighting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..."
},
{
"id": 485,
"title": "Winnebago Street Roundabout",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/",
"category": "Landscape Architecture, Transportation",
"filter": "Intersection,Local Roads,Reconstruction,Roundabout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..."
},
{
"id": 484,
"title": "I-94 North-South Public Involvement GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/",
"category": "GIS, Transportation",
"filter": "Bridges,Interchange,Interstate,Reconstruction",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..."
},
{
"id": 483,
"title": "Kapur Internal Multi-Office GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/",
"category": "GIS",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania",
"xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..."
},
{
"id": 482,
"title": "Lakeshore Lateral Pipeline GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/",
"category": "GIS, Power & Energy, Survey, UAV",
"filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..."
},
{
"id": 481,
"title": "Schlitz Park Brewtown Square",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/schlitz-park-brewtown-square\/",
"category": "Landscape Architecture, Site Design",
"filter": "Corporate,Green Space,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5144.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Undeveloped property in downtown Milwaukee is at a premium. Without room for urban expansion, out-of-the-box alternatives are necessary to develop this area of the city. ..."
},
{
"id": 480,
"title": "Milwaukee School of Engineering (MSOE) Athletic Complex",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-school-of-engineering-msoe-athletic-complex\/",
"category": "Landscape Architecture, Site Design",
"filter": "Athletics,Education,Mixed Use",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Pocket-Park-scaled.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When MSOE dreamed of a state-of-the-art athletic facility, Drs. Robert and Patricia Kern met the challenge by providing funds to acquire the land for the ..."
},
{
"id": 479,
"title": "Village of Darien GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/village-of-darien-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/darien3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur is the\u00a0primary provider of engineering services for the Village of Darien. When Kapur was\u00a0awarded its first street reconstruction project with the Village of Darien ..."
},
{
"id": 478,
"title": "City of Burlington GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-burlington-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Burlington_GIS2_Floodplain.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was in the process of collecting data for an old and rudimentary GIS when the City of Burlington decided to upgrade the site. Presented ..."
},
{
"id": 477,
"title": "Zoo Interchange GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-gis\/",
"category": "Environmental, GIS, Survey, Transportation",
"filter": "Asset Management,Custom Software Tools,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Zoo-Web-GIS-Screen_Utilities_1.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange was a massive project reconstructing the I-94 and I-41 interchange in Milwaukee and Waukesha Counties in Wisconsin. A project this large required ..."
},
{
"id": 476,
"title": "We Energies Gas Laterals",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-gas-laterals\/",
"category": "GIS, Planning, Power & Energy, Survey",
"filter": "Custom Software Tools,Easements,Extranet Applications,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/gis-nwl-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur won the design and survey contract for three separate laterals in Northwest Wisconsin. As part of the design solution, Kapur developed a GIS system ..."
},
{
"id": 475,
"title": "City of Lake Geneva GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-lake-geneva-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Custom Software Tools,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LG_DNRMonitoringSitesEx.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Prior to serving as the Engineer of Record for the City of Lake Geneva, we conducted a thorough analysis of the city’s existing GIS structure ..."
},
{
"id": 474,
"title": "Downtown Wayfinding",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/downtown-wayfinding\/",
"category": "Municipal",
"filter": "Asset Management,Civic,Local Roads,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/20191029_151822.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When Kapur was selected as the Engineer of Record for the City of Lake Geneva, one of the first projects we delivered was an updated ..."
},
{
"id": 473,
"title": "Civic Campus Redevelopment",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/civic-campus-redevelopment\/",
"category": "Landscape Architecture, Municipal, Site Design",
"filter": "Civic,Green Space,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A0526.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "For many years the Village of Mount Pleasant, Wisconsin, staff worked in a cramped, outdated, urban property set in the retail-first area of the village."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
},
{
"id": 499,
"title": "Salt Dome, Brine Building, and Maintenance Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/",
"category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural",
"filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..."
},
{
"id": 498,
"title": "Linwood Water Tunnel",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/",
"category": "LiDAR, Structural, Survey, Water Services",
"filter": "I&C,Mapping,Scanning,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..."
},
{
"id": 497,
"title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/",
"category": "Landscape Architecture, Natural Resources, Site Design",
"filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..."
},
{
"id": 496,
"title": "Milwaukee River Flushing Station Foundation Restoration",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/",
"category": "Landscape Architecture, Site Design, Structural",
"filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..."
},
{
"id": 495,
"title": "Ishnala Trail Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/",
"category": "Structural",
"filter": "Bridges",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..."
},
{
"id": 494,
"title": "Glacier Hills Wind Park",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/",
"category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey",
"filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..."
},
{
"id": 493,
"title": "Gas Main Replacement",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/",
"category": "Municipal, Planning, Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..."
},
{
"id": 492,
"title": "School District Master Planning",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/",
"category": "Landscape Architecture, Planning, Site Design, Survey",
"filter": "Athletics,Civic,Education,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..."
},
{
"id": 491,
"title": "Conveyance Gate Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/",
"category": "Electrical, Structural, Water Services",
"filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..."
},
{
"id": 490,
"title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/",
"category": "Electrical, Water Services",
"filter": "Buildings,I&C,Power Distribution,Treatment Plant",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..."
},
{
"id": 489,
"title": "We Energies Environmental Training",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/",
"category": "Environmental, Natural Resources, Power & Energy",
"filter": "Erosion Control,Permitting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..."
},
{
"id": 488,
"title": "Coal Pile Runoff and Air Quality",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/",
"category": "Electrical, Power & Energy",
"filter": "BIM,Mapping,Scanning,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..."
},
{
"id": 487,
"title": "General Mitchell International Airport (GMIA) Redundant Feeder",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/",
"category": "Electrical, Site Design",
"filter": "Buildings,Power Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..."
},
{
"id": 486,
"title": "Zoo Interchange Lighting",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/",
"category": "Electrical",
"filter": "Lighting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..."
},
{
"id": 485,
"title": "Winnebago Street Roundabout",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/",
"category": "Landscape Architecture, Transportation",
"filter": "Intersection,Local Roads,Reconstruction,Roundabout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..."
},
{
"id": 484,
"title": "I-94 North-South Public Involvement GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/",
"category": "GIS, Transportation",
"filter": "Bridges,Interchange,Interstate,Reconstruction",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..."
},
{
"id": 483,
"title": "Kapur Internal Multi-Office GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/",
"category": "GIS",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania",
"xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..."
},
{
"id": 482,
"title": "Lakeshore Lateral Pipeline GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/",
"category": "GIS, Power & Energy, Survey, UAV",
"filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..."
},
{
"id": 481,
"title": "Schlitz Park Brewtown Square",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/schlitz-park-brewtown-square\/",
"category": "Landscape Architecture, Site Design",
"filter": "Corporate,Green Space,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5144.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Undeveloped property in downtown Milwaukee is at a premium. Without room for urban expansion, out-of-the-box alternatives are necessary to develop this area of the city. ..."
},
{
"id": 480,
"title": "Milwaukee School of Engineering (MSOE) Athletic Complex",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-school-of-engineering-msoe-athletic-complex\/",
"category": "Landscape Architecture, Site Design",
"filter": "Athletics,Education,Mixed Use",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Pocket-Park-scaled.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When MSOE dreamed of a state-of-the-art athletic facility, Drs. Robert and Patricia Kern met the challenge by providing funds to acquire the land for the ..."
},
{
"id": 479,
"title": "Village of Darien GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/village-of-darien-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/darien3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur is the\u00a0primary provider of engineering services for the Village of Darien. When Kapur was\u00a0awarded its first street reconstruction project with the Village of Darien ..."
},
{
"id": 478,
"title": "City of Burlington GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-burlington-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Burlington_GIS2_Floodplain.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was in the process of collecting data for an old and rudimentary GIS when the City of Burlington decided to upgrade the site. Presented ..."
},
{
"id": 477,
"title": "Zoo Interchange GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-gis\/",
"category": "Environmental, GIS, Survey, Transportation",
"filter": "Asset Management,Custom Software Tools,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Zoo-Web-GIS-Screen_Utilities_1.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange was a massive project reconstructing the I-94 and I-41 interchange in Milwaukee and Waukesha Counties in Wisconsin. A project this large required ..."
},
{
"id": 476,
"title": "We Energies Gas Laterals",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-gas-laterals\/",
"category": "GIS, Planning, Power & Energy, Survey",
"filter": "Custom Software Tools,Easements,Extranet Applications,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/gis-nwl-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur won the design and survey contract for three separate laterals in Northwest Wisconsin. As part of the design solution, Kapur developed a GIS system ..."
},
{
"id": 475,
"title": "City of Lake Geneva GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-lake-geneva-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Custom Software Tools,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LG_DNRMonitoringSitesEx.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Prior to serving as the Engineer of Record for the City of Lake Geneva, we conducted a thorough analysis of the city’s existing GIS structure ..."
},
{
"id": 474,
"title": "Downtown Wayfinding",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/downtown-wayfinding\/",
"category": "Municipal",
"filter": "Asset Management,Civic,Local Roads,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/20191029_151822.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When Kapur was selected as the Engineer of Record for the City of Lake Geneva, one of the first projects we delivered was an updated ..."
},
{
"id": 473,
"title": "Civic Campus Redevelopment",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/civic-campus-redevelopment\/",
"category": "Landscape Architecture, Municipal, Site Design",
"filter": "Civic,Green Space,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A0526.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "For many years the Village of Mount Pleasant, Wisconsin, staff worked in a cramped, outdated, urban property set in the retail-first area of the village."
},
{
"id": 472,
"title": "Milwaukee Bucks Arena District Site Design",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-bucks-arena-district-site-design\/",
"category": "Landscape Architecture, Site Design",
"filter": "Athletics,Commercial,Green Space,Hospitality,Mapping,Mixed Use,Scanning,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/2022-Fiserv-Forum-Deer-District_1.png",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Bucks had outgrown their dated facility, so the team began searching for a new location and assembling a team to assist with planning ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
},
{
"id": 499,
"title": "Salt Dome, Brine Building, and Maintenance Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/",
"category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural",
"filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..."
},
{
"id": 498,
"title": "Linwood Water Tunnel",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/",
"category": "LiDAR, Structural, Survey, Water Services",
"filter": "I&C,Mapping,Scanning,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..."
},
{
"id": 497,
"title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/",
"category": "Landscape Architecture, Natural Resources, Site Design",
"filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..."
},
{
"id": 496,
"title": "Milwaukee River Flushing Station Foundation Restoration",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/",
"category": "Landscape Architecture, Site Design, Structural",
"filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..."
},
{
"id": 495,
"title": "Ishnala Trail Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/",
"category": "Structural",
"filter": "Bridges",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..."
},
{
"id": 494,
"title": "Glacier Hills Wind Park",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/",
"category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey",
"filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..."
},
{
"id": 493,
"title": "Gas Main Replacement",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/",
"category": "Municipal, Planning, Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..."
},
{
"id": 492,
"title": "School District Master Planning",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/",
"category": "Landscape Architecture, Planning, Site Design, Survey",
"filter": "Athletics,Civic,Education,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..."
},
{
"id": 491,
"title": "Conveyance Gate Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/",
"category": "Electrical, Structural, Water Services",
"filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..."
},
{
"id": 490,
"title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/",
"category": "Electrical, Water Services",
"filter": "Buildings,I&C,Power Distribution,Treatment Plant",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..."
},
{
"id": 489,
"title": "We Energies Environmental Training",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/",
"category": "Environmental, Natural Resources, Power & Energy",
"filter": "Erosion Control,Permitting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..."
},
{
"id": 488,
"title": "Coal Pile Runoff and Air Quality",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/",
"category": "Electrical, Power & Energy",
"filter": "BIM,Mapping,Scanning,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..."
},
{
"id": 487,
"title": "General Mitchell International Airport (GMIA) Redundant Feeder",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/",
"category": "Electrical, Site Design",
"filter": "Buildings,Power Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..."
},
{
"id": 486,
"title": "Zoo Interchange Lighting",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/",
"category": "Electrical",
"filter": "Lighting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..."
},
{
"id": 485,
"title": "Winnebago Street Roundabout",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/",
"category": "Landscape Architecture, Transportation",
"filter": "Intersection,Local Roads,Reconstruction,Roundabout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..."
},
{
"id": 484,
"title": "I-94 North-South Public Involvement GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/",
"category": "GIS, Transportation",
"filter": "Bridges,Interchange,Interstate,Reconstruction",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..."
},
{
"id": 483,
"title": "Kapur Internal Multi-Office GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/",
"category": "GIS",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania",
"xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..."
},
{
"id": 482,
"title": "Lakeshore Lateral Pipeline GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/",
"category": "GIS, Power & Energy, Survey, UAV",
"filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..."
},
{
"id": 481,
"title": "Schlitz Park Brewtown Square",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/schlitz-park-brewtown-square\/",
"category": "Landscape Architecture, Site Design",
"filter": "Corporate,Green Space,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5144.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Undeveloped property in downtown Milwaukee is at a premium. Without room for urban expansion, out-of-the-box alternatives are necessary to develop this area of the city. ..."
},
{
"id": 480,
"title": "Milwaukee School of Engineering (MSOE) Athletic Complex",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-school-of-engineering-msoe-athletic-complex\/",
"category": "Landscape Architecture, Site Design",
"filter": "Athletics,Education,Mixed Use",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Pocket-Park-scaled.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When MSOE dreamed of a state-of-the-art athletic facility, Drs. Robert and Patricia Kern met the challenge by providing funds to acquire the land for the ..."
},
{
"id": 479,
"title": "Village of Darien GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/village-of-darien-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/darien3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur is the\u00a0primary provider of engineering services for the Village of Darien. When Kapur was\u00a0awarded its first street reconstruction project with the Village of Darien ..."
},
{
"id": 478,
"title": "City of Burlington GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-burlington-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Burlington_GIS2_Floodplain.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was in the process of collecting data for an old and rudimentary GIS when the City of Burlington decided to upgrade the site. Presented ..."
},
{
"id": 477,
"title": "Zoo Interchange GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-gis\/",
"category": "Environmental, GIS, Survey, Transportation",
"filter": "Asset Management,Custom Software Tools,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Zoo-Web-GIS-Screen_Utilities_1.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange was a massive project reconstructing the I-94 and I-41 interchange in Milwaukee and Waukesha Counties in Wisconsin. A project this large required ..."
},
{
"id": 476,
"title": "We Energies Gas Laterals",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-gas-laterals\/",
"category": "GIS, Planning, Power & Energy, Survey",
"filter": "Custom Software Tools,Easements,Extranet Applications,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/gis-nwl-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur won the design and survey contract for three separate laterals in Northwest Wisconsin. As part of the design solution, Kapur developed a GIS system ..."
},
{
"id": 475,
"title": "City of Lake Geneva GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-lake-geneva-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Custom Software Tools,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LG_DNRMonitoringSitesEx.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Prior to serving as the Engineer of Record for the City of Lake Geneva, we conducted a thorough analysis of the city’s existing GIS structure ..."
},
{
"id": 474,
"title": "Downtown Wayfinding",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/downtown-wayfinding\/",
"category": "Municipal",
"filter": "Asset Management,Civic,Local Roads,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/20191029_151822.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When Kapur was selected as the Engineer of Record for the City of Lake Geneva, one of the first projects we delivered was an updated ..."
},
{
"id": 473,
"title": "Civic Campus Redevelopment",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/civic-campus-redevelopment\/",
"category": "Landscape Architecture, Municipal, Site Design",
"filter": "Civic,Green Space,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A0526.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "For many years the Village of Mount Pleasant, Wisconsin, staff worked in a cramped, outdated, urban property set in the retail-first area of the village."
},
{
"id": 472,
"title": "Milwaukee Bucks Arena District Site Design",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-bucks-arena-district-site-design\/",
"category": "Landscape Architecture, Site Design",
"filter": "Athletics,Commercial,Green Space,Hospitality,Mapping,Mixed Use,Scanning,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/2022-Fiserv-Forum-Deer-District_1.png",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Bucks had outgrown their dated facility, so the team began searching for a new location and assembling a team to assist with planning ..."
},
{
"id": 471,
"title": "The Corners of Brookfield Retail Development",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/the-corners-of-brookfield-retail-development\/",
"category": "Landscape Architecture, Site Design, Structural, Survey",
"filter": "ALTA\/CSM,Commercial,Easements,Green Space,Hospitality,Mixed Use,Study,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Von-Maur-1.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The client, Marcus Corporation, aimed to create a space based on the Suburban Town Center model in Brookfield, Wisconsin, west of the City of Milwaukee.Marcus ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
},
{
"id": 499,
"title": "Salt Dome, Brine Building, and Maintenance Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/",
"category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural",
"filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..."
},
{
"id": 498,
"title": "Linwood Water Tunnel",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/",
"category": "LiDAR, Structural, Survey, Water Services",
"filter": "I&C,Mapping,Scanning,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..."
},
{
"id": 497,
"title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/",
"category": "Landscape Architecture, Natural Resources, Site Design",
"filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..."
},
{
"id": 496,
"title": "Milwaukee River Flushing Station Foundation Restoration",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/",
"category": "Landscape Architecture, Site Design, Structural",
"filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..."
},
{
"id": 495,
"title": "Ishnala Trail Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/",
"category": "Structural",
"filter": "Bridges",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..."
},
{
"id": 494,
"title": "Glacier Hills Wind Park",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/",
"category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey",
"filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..."
},
{
"id": 493,
"title": "Gas Main Replacement",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/",
"category": "Municipal, Planning, Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..."
},
{
"id": 492,
"title": "School District Master Planning",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/",
"category": "Landscape Architecture, Planning, Site Design, Survey",
"filter": "Athletics,Civic,Education,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..."
},
{
"id": 491,
"title": "Conveyance Gate Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/",
"category": "Electrical, Structural, Water Services",
"filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..."
},
{
"id": 490,
"title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/",
"category": "Electrical, Water Services",
"filter": "Buildings,I&C,Power Distribution,Treatment Plant",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..."
},
{
"id": 489,
"title": "We Energies Environmental Training",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/",
"category": "Environmental, Natural Resources, Power & Energy",
"filter": "Erosion Control,Permitting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..."
},
{
"id": 488,
"title": "Coal Pile Runoff and Air Quality",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/",
"category": "Electrical, Power & Energy",
"filter": "BIM,Mapping,Scanning,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..."
},
{
"id": 487,
"title": "General Mitchell International Airport (GMIA) Redundant Feeder",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/",
"category": "Electrical, Site Design",
"filter": "Buildings,Power Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..."
},
{
"id": 486,
"title": "Zoo Interchange Lighting",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/",
"category": "Electrical",
"filter": "Lighting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..."
},
{
"id": 485,
"title": "Winnebago Street Roundabout",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/",
"category": "Landscape Architecture, Transportation",
"filter": "Intersection,Local Roads,Reconstruction,Roundabout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..."
},
{
"id": 484,
"title": "I-94 North-South Public Involvement GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/",
"category": "GIS, Transportation",
"filter": "Bridges,Interchange,Interstate,Reconstruction",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..."
},
{
"id": 483,
"title": "Kapur Internal Multi-Office GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/",
"category": "GIS",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania",
"xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..."
},
{
"id": 482,
"title": "Lakeshore Lateral Pipeline GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/",
"category": "GIS, Power & Energy, Survey, UAV",
"filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..."
},
{
"id": 481,
"title": "Schlitz Park Brewtown Square",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/schlitz-park-brewtown-square\/",
"category": "Landscape Architecture, Site Design",
"filter": "Corporate,Green Space,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5144.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Undeveloped property in downtown Milwaukee is at a premium. Without room for urban expansion, out-of-the-box alternatives are necessary to develop this area of the city. ..."
},
{
"id": 480,
"title": "Milwaukee School of Engineering (MSOE) Athletic Complex",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-school-of-engineering-msoe-athletic-complex\/",
"category": "Landscape Architecture, Site Design",
"filter": "Athletics,Education,Mixed Use",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Pocket-Park-scaled.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When MSOE dreamed of a state-of-the-art athletic facility, Drs. Robert and Patricia Kern met the challenge by providing funds to acquire the land for the ..."
},
{
"id": 479,
"title": "Village of Darien GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/village-of-darien-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/darien3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur is the\u00a0primary provider of engineering services for the Village of Darien. When Kapur was\u00a0awarded its first street reconstruction project with the Village of Darien ..."
},
{
"id": 478,
"title": "City of Burlington GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-burlington-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Burlington_GIS2_Floodplain.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was in the process of collecting data for an old and rudimentary GIS when the City of Burlington decided to upgrade the site. Presented ..."
},
{
"id": 477,
"title": "Zoo Interchange GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-gis\/",
"category": "Environmental, GIS, Survey, Transportation",
"filter": "Asset Management,Custom Software Tools,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Zoo-Web-GIS-Screen_Utilities_1.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange was a massive project reconstructing the I-94 and I-41 interchange in Milwaukee and Waukesha Counties in Wisconsin. A project this large required ..."
},
{
"id": 476,
"title": "We Energies Gas Laterals",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-gas-laterals\/",
"category": "GIS, Planning, Power & Energy, Survey",
"filter": "Custom Software Tools,Easements,Extranet Applications,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/gis-nwl-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur won the design and survey contract for three separate laterals in Northwest Wisconsin. As part of the design solution, Kapur developed a GIS system ..."
},
{
"id": 475,
"title": "City of Lake Geneva GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-lake-geneva-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Custom Software Tools,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LG_DNRMonitoringSitesEx.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Prior to serving as the Engineer of Record for the City of Lake Geneva, we conducted a thorough analysis of the city’s existing GIS structure ..."
},
{
"id": 474,
"title": "Downtown Wayfinding",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/downtown-wayfinding\/",
"category": "Municipal",
"filter": "Asset Management,Civic,Local Roads,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/20191029_151822.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When Kapur was selected as the Engineer of Record for the City of Lake Geneva, one of the first projects we delivered was an updated ..."
},
{
"id": 473,
"title": "Civic Campus Redevelopment",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/civic-campus-redevelopment\/",
"category": "Landscape Architecture, Municipal, Site Design",
"filter": "Civic,Green Space,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A0526.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "For many years the Village of Mount Pleasant, Wisconsin, staff worked in a cramped, outdated, urban property set in the retail-first area of the village."
},
{
"id": 472,
"title": "Milwaukee Bucks Arena District Site Design",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-bucks-arena-district-site-design\/",
"category": "Landscape Architecture, Site Design",
"filter": "Athletics,Commercial,Green Space,Hospitality,Mapping,Mixed Use,Scanning,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/2022-Fiserv-Forum-Deer-District_1.png",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Bucks had outgrown their dated facility, so the team began searching for a new location and assembling a team to assist with planning ..."
},
{
"id": 471,
"title": "The Corners of Brookfield Retail Development",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/the-corners-of-brookfield-retail-development\/",
"category": "Landscape Architecture, Site Design, Structural, Survey",
"filter": "ALTA\/CSM,Commercial,Easements,Green Space,Hospitality,Mixed Use,Study,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Von-Maur-1.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The client, Marcus Corporation, aimed to create a space based on the Suburban Town Center model in Brookfield, Wisconsin, west of the City of Milwaukee.Marcus ..."
},
{
"id": 470,
"title": "Cristo Rey Jesuit High School Environmental Investigation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/cristo-rey-jesuit-high-school-environmental-investigation\/",
"category": "Environmental, Site Design, Survey",
"filter": "Remediation,Site Assessment,Site Investigation,UST",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_0269.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "After first retaining Kapur for site design services, Cristo Rey Jesuit High School later selected Kapur to also provide environmental consulting for the redevelopment of ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
},
{
"id": 499,
"title": "Salt Dome, Brine Building, and Maintenance Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/",
"category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural",
"filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..."
},
{
"id": 498,
"title": "Linwood Water Tunnel",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/",
"category": "LiDAR, Structural, Survey, Water Services",
"filter": "I&C,Mapping,Scanning,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..."
},
{
"id": 497,
"title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/",
"category": "Landscape Architecture, Natural Resources, Site Design",
"filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..."
},
{
"id": 496,
"title": "Milwaukee River Flushing Station Foundation Restoration",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/",
"category": "Landscape Architecture, Site Design, Structural",
"filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..."
},
{
"id": 495,
"title": "Ishnala Trail Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/",
"category": "Structural",
"filter": "Bridges",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..."
},
{
"id": 494,
"title": "Glacier Hills Wind Park",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/",
"category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey",
"filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..."
},
{
"id": 493,
"title": "Gas Main Replacement",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/",
"category": "Municipal, Planning, Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..."
},
{
"id": 492,
"title": "School District Master Planning",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/",
"category": "Landscape Architecture, Planning, Site Design, Survey",
"filter": "Athletics,Civic,Education,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..."
},
{
"id": 491,
"title": "Conveyance Gate Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/",
"category": "Electrical, Structural, Water Services",
"filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..."
},
{
"id": 490,
"title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/",
"category": "Electrical, Water Services",
"filter": "Buildings,I&C,Power Distribution,Treatment Plant",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..."
},
{
"id": 489,
"title": "We Energies Environmental Training",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/",
"category": "Environmental, Natural Resources, Power & Energy",
"filter": "Erosion Control,Permitting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..."
},
{
"id": 488,
"title": "Coal Pile Runoff and Air Quality",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/",
"category": "Electrical, Power & Energy",
"filter": "BIM,Mapping,Scanning,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..."
},
{
"id": 487,
"title": "General Mitchell International Airport (GMIA) Redundant Feeder",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/",
"category": "Electrical, Site Design",
"filter": "Buildings,Power Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..."
},
{
"id": 486,
"title": "Zoo Interchange Lighting",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/",
"category": "Electrical",
"filter": "Lighting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..."
},
{
"id": 485,
"title": "Winnebago Street Roundabout",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/",
"category": "Landscape Architecture, Transportation",
"filter": "Intersection,Local Roads,Reconstruction,Roundabout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..."
},
{
"id": 484,
"title": "I-94 North-South Public Involvement GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/",
"category": "GIS, Transportation",
"filter": "Bridges,Interchange,Interstate,Reconstruction",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..."
},
{
"id": 483,
"title": "Kapur Internal Multi-Office GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/",
"category": "GIS",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania",
"xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..."
},
{
"id": 482,
"title": "Lakeshore Lateral Pipeline GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/",
"category": "GIS, Power & Energy, Survey, UAV",
"filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..."
},
{
"id": 481,
"title": "Schlitz Park Brewtown Square",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/schlitz-park-brewtown-square\/",
"category": "Landscape Architecture, Site Design",
"filter": "Corporate,Green Space,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5144.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Undeveloped property in downtown Milwaukee is at a premium. Without room for urban expansion, out-of-the-box alternatives are necessary to develop this area of the city. ..."
},
{
"id": 480,
"title": "Milwaukee School of Engineering (MSOE) Athletic Complex",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-school-of-engineering-msoe-athletic-complex\/",
"category": "Landscape Architecture, Site Design",
"filter": "Athletics,Education,Mixed Use",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Pocket-Park-scaled.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When MSOE dreamed of a state-of-the-art athletic facility, Drs. Robert and Patricia Kern met the challenge by providing funds to acquire the land for the ..."
},
{
"id": 479,
"title": "Village of Darien GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/village-of-darien-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/darien3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur is the\u00a0primary provider of engineering services for the Village of Darien. When Kapur was\u00a0awarded its first street reconstruction project with the Village of Darien ..."
},
{
"id": 478,
"title": "City of Burlington GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-burlington-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Burlington_GIS2_Floodplain.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was in the process of collecting data for an old and rudimentary GIS when the City of Burlington decided to upgrade the site. Presented ..."
},
{
"id": 477,
"title": "Zoo Interchange GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-gis\/",
"category": "Environmental, GIS, Survey, Transportation",
"filter": "Asset Management,Custom Software Tools,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Zoo-Web-GIS-Screen_Utilities_1.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange was a massive project reconstructing the I-94 and I-41 interchange in Milwaukee and Waukesha Counties in Wisconsin. A project this large required ..."
},
{
"id": 476,
"title": "We Energies Gas Laterals",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-gas-laterals\/",
"category": "GIS, Planning, Power & Energy, Survey",
"filter": "Custom Software Tools,Easements,Extranet Applications,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/gis-nwl-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur won the design and survey contract for three separate laterals in Northwest Wisconsin. As part of the design solution, Kapur developed a GIS system ..."
},
{
"id": 475,
"title": "City of Lake Geneva GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-lake-geneva-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Custom Software Tools,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LG_DNRMonitoringSitesEx.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Prior to serving as the Engineer of Record for the City of Lake Geneva, we conducted a thorough analysis of the city’s existing GIS structure ..."
},
{
"id": 474,
"title": "Downtown Wayfinding",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/downtown-wayfinding\/",
"category": "Municipal",
"filter": "Asset Management,Civic,Local Roads,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/20191029_151822.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When Kapur was selected as the Engineer of Record for the City of Lake Geneva, one of the first projects we delivered was an updated ..."
},
{
"id": 473,
"title": "Civic Campus Redevelopment",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/civic-campus-redevelopment\/",
"category": "Landscape Architecture, Municipal, Site Design",
"filter": "Civic,Green Space,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A0526.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "For many years the Village of Mount Pleasant, Wisconsin, staff worked in a cramped, outdated, urban property set in the retail-first area of the village."
},
{
"id": 472,
"title": "Milwaukee Bucks Arena District Site Design",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-bucks-arena-district-site-design\/",
"category": "Landscape Architecture, Site Design",
"filter": "Athletics,Commercial,Green Space,Hospitality,Mapping,Mixed Use,Scanning,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/2022-Fiserv-Forum-Deer-District_1.png",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Bucks had outgrown their dated facility, so the team began searching for a new location and assembling a team to assist with planning ..."
},
{
"id": 471,
"title": "The Corners of Brookfield Retail Development",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/the-corners-of-brookfield-retail-development\/",
"category": "Landscape Architecture, Site Design, Structural, Survey",
"filter": "ALTA\/CSM,Commercial,Easements,Green Space,Hospitality,Mixed Use,Study,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Von-Maur-1.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The client, Marcus Corporation, aimed to create a space based on the Suburban Town Center model in Brookfield, Wisconsin, west of the City of Milwaukee.Marcus ..."
},
{
"id": 470,
"title": "Cristo Rey Jesuit High School Environmental Investigation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/cristo-rey-jesuit-high-school-environmental-investigation\/",
"category": "Environmental, Site Design, Survey",
"filter": "Remediation,Site Assessment,Site Investigation,UST",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_0269.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "After first retaining Kapur for site design services, Cristo Rey Jesuit High School later selected Kapur to also provide environmental consulting for the redevelopment of ..."
},
{
"id": 469,
"title": "Harbor View Lofts Environmental Investigation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/harbor-view-lofts-environmental-investigation\/",
"category": "Environmental, Survey",
"filter": "Remediation,Site Assessment,Site Investigation,UST",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/34.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "As part of a property acquisition, LCM Funds selected Kapur to provide a Phase I Environmental Site Assessment (ESA).The Phase I ESA revealed the site ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
},
{
"id": 499,
"title": "Salt Dome, Brine Building, and Maintenance Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/",
"category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural",
"filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..."
},
{
"id": 498,
"title": "Linwood Water Tunnel",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/",
"category": "LiDAR, Structural, Survey, Water Services",
"filter": "I&C,Mapping,Scanning,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..."
},
{
"id": 497,
"title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/",
"category": "Landscape Architecture, Natural Resources, Site Design",
"filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..."
},
{
"id": 496,
"title": "Milwaukee River Flushing Station Foundation Restoration",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/",
"category": "Landscape Architecture, Site Design, Structural",
"filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..."
},
{
"id": 495,
"title": "Ishnala Trail Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/",
"category": "Structural",
"filter": "Bridges",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..."
},
{
"id": 494,
"title": "Glacier Hills Wind Park",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/",
"category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey",
"filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..."
},
{
"id": 493,
"title": "Gas Main Replacement",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/",
"category": "Municipal, Planning, Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..."
},
{
"id": 492,
"title": "School District Master Planning",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/",
"category": "Landscape Architecture, Planning, Site Design, Survey",
"filter": "Athletics,Civic,Education,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..."
},
{
"id": 491,
"title": "Conveyance Gate Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/",
"category": "Electrical, Structural, Water Services",
"filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..."
},
{
"id": 490,
"title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/",
"category": "Electrical, Water Services",
"filter": "Buildings,I&C,Power Distribution,Treatment Plant",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..."
},
{
"id": 489,
"title": "We Energies Environmental Training",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/",
"category": "Environmental, Natural Resources, Power & Energy",
"filter": "Erosion Control,Permitting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..."
},
{
"id": 488,
"title": "Coal Pile Runoff and Air Quality",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/",
"category": "Electrical, Power & Energy",
"filter": "BIM,Mapping,Scanning,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..."
},
{
"id": 487,
"title": "General Mitchell International Airport (GMIA) Redundant Feeder",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/",
"category": "Electrical, Site Design",
"filter": "Buildings,Power Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..."
},
{
"id": 486,
"title": "Zoo Interchange Lighting",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/",
"category": "Electrical",
"filter": "Lighting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..."
},
{
"id": 485,
"title": "Winnebago Street Roundabout",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/",
"category": "Landscape Architecture, Transportation",
"filter": "Intersection,Local Roads,Reconstruction,Roundabout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..."
},
{
"id": 484,
"title": "I-94 North-South Public Involvement GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/",
"category": "GIS, Transportation",
"filter": "Bridges,Interchange,Interstate,Reconstruction",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..."
},
{
"id": 483,
"title": "Kapur Internal Multi-Office GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/",
"category": "GIS",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania",
"xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..."
},
{
"id": 482,
"title": "Lakeshore Lateral Pipeline GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/",
"category": "GIS, Power & Energy, Survey, UAV",
"filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..."
},
{
"id": 481,
"title": "Schlitz Park Brewtown Square",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/schlitz-park-brewtown-square\/",
"category": "Landscape Architecture, Site Design",
"filter": "Corporate,Green Space,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5144.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Undeveloped property in downtown Milwaukee is at a premium. Without room for urban expansion, out-of-the-box alternatives are necessary to develop this area of the city. ..."
},
{
"id": 480,
"title": "Milwaukee School of Engineering (MSOE) Athletic Complex",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-school-of-engineering-msoe-athletic-complex\/",
"category": "Landscape Architecture, Site Design",
"filter": "Athletics,Education,Mixed Use",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Pocket-Park-scaled.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When MSOE dreamed of a state-of-the-art athletic facility, Drs. Robert and Patricia Kern met the challenge by providing funds to acquire the land for the ..."
},
{
"id": 479,
"title": "Village of Darien GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/village-of-darien-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/darien3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur is the\u00a0primary provider of engineering services for the Village of Darien. When Kapur was\u00a0awarded its first street reconstruction project with the Village of Darien ..."
},
{
"id": 478,
"title": "City of Burlington GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-burlington-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Burlington_GIS2_Floodplain.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was in the process of collecting data for an old and rudimentary GIS when the City of Burlington decided to upgrade the site. Presented ..."
},
{
"id": 477,
"title": "Zoo Interchange GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-gis\/",
"category": "Environmental, GIS, Survey, Transportation",
"filter": "Asset Management,Custom Software Tools,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Zoo-Web-GIS-Screen_Utilities_1.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange was a massive project reconstructing the I-94 and I-41 interchange in Milwaukee and Waukesha Counties in Wisconsin. A project this large required ..."
},
{
"id": 476,
"title": "We Energies Gas Laterals",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-gas-laterals\/",
"category": "GIS, Planning, Power & Energy, Survey",
"filter": "Custom Software Tools,Easements,Extranet Applications,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/gis-nwl-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur won the design and survey contract for three separate laterals in Northwest Wisconsin. As part of the design solution, Kapur developed a GIS system ..."
},
{
"id": 475,
"title": "City of Lake Geneva GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-lake-geneva-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Custom Software Tools,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LG_DNRMonitoringSitesEx.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Prior to serving as the Engineer of Record for the City of Lake Geneva, we conducted a thorough analysis of the city’s existing GIS structure ..."
},
{
"id": 474,
"title": "Downtown Wayfinding",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/downtown-wayfinding\/",
"category": "Municipal",
"filter": "Asset Management,Civic,Local Roads,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/20191029_151822.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When Kapur was selected as the Engineer of Record for the City of Lake Geneva, one of the first projects we delivered was an updated ..."
},
{
"id": 473,
"title": "Civic Campus Redevelopment",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/civic-campus-redevelopment\/",
"category": "Landscape Architecture, Municipal, Site Design",
"filter": "Civic,Green Space,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A0526.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "For many years the Village of Mount Pleasant, Wisconsin, staff worked in a cramped, outdated, urban property set in the retail-first area of the village."
},
{
"id": 472,
"title": "Milwaukee Bucks Arena District Site Design",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-bucks-arena-district-site-design\/",
"category": "Landscape Architecture, Site Design",
"filter": "Athletics,Commercial,Green Space,Hospitality,Mapping,Mixed Use,Scanning,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/2022-Fiserv-Forum-Deer-District_1.png",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Bucks had outgrown their dated facility, so the team began searching for a new location and assembling a team to assist with planning ..."
},
{
"id": 471,
"title": "The Corners of Brookfield Retail Development",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/the-corners-of-brookfield-retail-development\/",
"category": "Landscape Architecture, Site Design, Structural, Survey",
"filter": "ALTA\/CSM,Commercial,Easements,Green Space,Hospitality,Mixed Use,Study,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Von-Maur-1.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The client, Marcus Corporation, aimed to create a space based on the Suburban Town Center model in Brookfield, Wisconsin, west of the City of Milwaukee.Marcus ..."
},
{
"id": 470,
"title": "Cristo Rey Jesuit High School Environmental Investigation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/cristo-rey-jesuit-high-school-environmental-investigation\/",
"category": "Environmental, Site Design, Survey",
"filter": "Remediation,Site Assessment,Site Investigation,UST",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_0269.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "After first retaining Kapur for site design services, Cristo Rey Jesuit High School later selected Kapur to also provide environmental consulting for the redevelopment of ..."
},
{
"id": 469,
"title": "Harbor View Lofts Environmental Investigation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/harbor-view-lofts-environmental-investigation\/",
"category": "Environmental, Survey",
"filter": "Remediation,Site Assessment,Site Investigation,UST",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/34.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "As part of a property acquisition, LCM Funds selected Kapur to provide a Phase I Environmental Site Assessment (ESA).The Phase I ESA revealed the site ..."
},
{
"id": 468,
"title": "Environmental Services for the Foxconn Development",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/environmental-services-for-the-foxconn-development\/",
"category": "Environmental, Survey",
"filter": "Asbestos,Lead,Remediation,Site Assessment,Site Investigation,UST",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_3903.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Village of Mount Pleasant selected Kapur to provide environmental consulting to facilitate the demolition of residential and commercial properties acquired by the Village in ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
},
{
"id": 499,
"title": "Salt Dome, Brine Building, and Maintenance Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/",
"category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural",
"filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..."
},
{
"id": 498,
"title": "Linwood Water Tunnel",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/",
"category": "LiDAR, Structural, Survey, Water Services",
"filter": "I&C,Mapping,Scanning,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..."
},
{
"id": 497,
"title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/",
"category": "Landscape Architecture, Natural Resources, Site Design",
"filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..."
},
{
"id": 496,
"title": "Milwaukee River Flushing Station Foundation Restoration",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/",
"category": "Landscape Architecture, Site Design, Structural",
"filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..."
},
{
"id": 495,
"title": "Ishnala Trail Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/",
"category": "Structural",
"filter": "Bridges",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..."
},
{
"id": 494,
"title": "Glacier Hills Wind Park",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/",
"category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey",
"filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..."
},
{
"id": 493,
"title": "Gas Main Replacement",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/",
"category": "Municipal, Planning, Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..."
},
{
"id": 492,
"title": "School District Master Planning",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/",
"category": "Landscape Architecture, Planning, Site Design, Survey",
"filter": "Athletics,Civic,Education,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..."
},
{
"id": 491,
"title": "Conveyance Gate Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/",
"category": "Electrical, Structural, Water Services",
"filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..."
},
{
"id": 490,
"title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/",
"category": "Electrical, Water Services",
"filter": "Buildings,I&C,Power Distribution,Treatment Plant",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..."
},
{
"id": 489,
"title": "We Energies Environmental Training",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/",
"category": "Environmental, Natural Resources, Power & Energy",
"filter": "Erosion Control,Permitting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..."
},
{
"id": 488,
"title": "Coal Pile Runoff and Air Quality",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/",
"category": "Electrical, Power & Energy",
"filter": "BIM,Mapping,Scanning,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..."
},
{
"id": 487,
"title": "General Mitchell International Airport (GMIA) Redundant Feeder",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/",
"category": "Electrical, Site Design",
"filter": "Buildings,Power Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..."
},
{
"id": 486,
"title": "Zoo Interchange Lighting",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/",
"category": "Electrical",
"filter": "Lighting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..."
},
{
"id": 485,
"title": "Winnebago Street Roundabout",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/",
"category": "Landscape Architecture, Transportation",
"filter": "Intersection,Local Roads,Reconstruction,Roundabout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..."
},
{
"id": 484,
"title": "I-94 North-South Public Involvement GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/",
"category": "GIS, Transportation",
"filter": "Bridges,Interchange,Interstate,Reconstruction",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..."
},
{
"id": 483,
"title": "Kapur Internal Multi-Office GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/",
"category": "GIS",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania",
"xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..."
},
{
"id": 482,
"title": "Lakeshore Lateral Pipeline GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/",
"category": "GIS, Power & Energy, Survey, UAV",
"filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..."
},
{
"id": 481,
"title": "Schlitz Park Brewtown Square",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/schlitz-park-brewtown-square\/",
"category": "Landscape Architecture, Site Design",
"filter": "Corporate,Green Space,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5144.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Undeveloped property in downtown Milwaukee is at a premium. Without room for urban expansion, out-of-the-box alternatives are necessary to develop this area of the city. ..."
},
{
"id": 480,
"title": "Milwaukee School of Engineering (MSOE) Athletic Complex",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-school-of-engineering-msoe-athletic-complex\/",
"category": "Landscape Architecture, Site Design",
"filter": "Athletics,Education,Mixed Use",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Pocket-Park-scaled.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When MSOE dreamed of a state-of-the-art athletic facility, Drs. Robert and Patricia Kern met the challenge by providing funds to acquire the land for the ..."
},
{
"id": 479,
"title": "Village of Darien GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/village-of-darien-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/darien3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur is the\u00a0primary provider of engineering services for the Village of Darien. When Kapur was\u00a0awarded its first street reconstruction project with the Village of Darien ..."
},
{
"id": 478,
"title": "City of Burlington GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-burlington-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Burlington_GIS2_Floodplain.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was in the process of collecting data for an old and rudimentary GIS when the City of Burlington decided to upgrade the site. Presented ..."
},
{
"id": 477,
"title": "Zoo Interchange GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-gis\/",
"category": "Environmental, GIS, Survey, Transportation",
"filter": "Asset Management,Custom Software Tools,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Zoo-Web-GIS-Screen_Utilities_1.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange was a massive project reconstructing the I-94 and I-41 interchange in Milwaukee and Waukesha Counties in Wisconsin. A project this large required ..."
},
{
"id": 476,
"title": "We Energies Gas Laterals",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-gas-laterals\/",
"category": "GIS, Planning, Power & Energy, Survey",
"filter": "Custom Software Tools,Easements,Extranet Applications,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/gis-nwl-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur won the design and survey contract for three separate laterals in Northwest Wisconsin. As part of the design solution, Kapur developed a GIS system ..."
},
{
"id": 475,
"title": "City of Lake Geneva GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-lake-geneva-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Custom Software Tools,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LG_DNRMonitoringSitesEx.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Prior to serving as the Engineer of Record for the City of Lake Geneva, we conducted a thorough analysis of the city’s existing GIS structure ..."
},
{
"id": 474,
"title": "Downtown Wayfinding",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/downtown-wayfinding\/",
"category": "Municipal",
"filter": "Asset Management,Civic,Local Roads,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/20191029_151822.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When Kapur was selected as the Engineer of Record for the City of Lake Geneva, one of the first projects we delivered was an updated ..."
},
{
"id": 473,
"title": "Civic Campus Redevelopment",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/civic-campus-redevelopment\/",
"category": "Landscape Architecture, Municipal, Site Design",
"filter": "Civic,Green Space,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A0526.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "For many years the Village of Mount Pleasant, Wisconsin, staff worked in a cramped, outdated, urban property set in the retail-first area of the village."
},
{
"id": 472,
"title": "Milwaukee Bucks Arena District Site Design",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-bucks-arena-district-site-design\/",
"category": "Landscape Architecture, Site Design",
"filter": "Athletics,Commercial,Green Space,Hospitality,Mapping,Mixed Use,Scanning,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/2022-Fiserv-Forum-Deer-District_1.png",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Bucks had outgrown their dated facility, so the team began searching for a new location and assembling a team to assist with planning ..."
},
{
"id": 471,
"title": "The Corners of Brookfield Retail Development",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/the-corners-of-brookfield-retail-development\/",
"category": "Landscape Architecture, Site Design, Structural, Survey",
"filter": "ALTA\/CSM,Commercial,Easements,Green Space,Hospitality,Mixed Use,Study,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Von-Maur-1.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The client, Marcus Corporation, aimed to create a space based on the Suburban Town Center model in Brookfield, Wisconsin, west of the City of Milwaukee.Marcus ..."
},
{
"id": 470,
"title": "Cristo Rey Jesuit High School Environmental Investigation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/cristo-rey-jesuit-high-school-environmental-investigation\/",
"category": "Environmental, Site Design, Survey",
"filter": "Remediation,Site Assessment,Site Investigation,UST",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_0269.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "After first retaining Kapur for site design services, Cristo Rey Jesuit High School later selected Kapur to also provide environmental consulting for the redevelopment of ..."
},
{
"id": 469,
"title": "Harbor View Lofts Environmental Investigation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/harbor-view-lofts-environmental-investigation\/",
"category": "Environmental, Survey",
"filter": "Remediation,Site Assessment,Site Investigation,UST",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/34.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "As part of a property acquisition, LCM Funds selected Kapur to provide a Phase I Environmental Site Assessment (ESA).The Phase I ESA revealed the site ..."
},
{
"id": 468,
"title": "Environmental Services for the Foxconn Development",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/environmental-services-for-the-foxconn-development\/",
"category": "Environmental, Survey",
"filter": "Asbestos,Lead,Remediation,Site Assessment,Site Investigation,UST",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_3903.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Village of Mount Pleasant selected Kapur to provide environmental consulting to facilitate the demolition of residential and commercial properties acquired by the Village in ..."
},
{
"id": 467,
"title": "Former Pallet Company Environmental Site Assessment",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/former-pallet-company-environmental-site-assessment\/",
"category": "Environmental, Survey",
"filter": "Remediation,Site Assessment,Site Investigation",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Wetenkamp1.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was selected by the lender to provide a Records Search with Risk Assessment (RSRA) for the former Wetenkamp Pallet Company property in Newton, Wisconsin, ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
},
{
"id": 499,
"title": "Salt Dome, Brine Building, and Maintenance Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/",
"category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural",
"filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..."
},
{
"id": 498,
"title": "Linwood Water Tunnel",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/",
"category": "LiDAR, Structural, Survey, Water Services",
"filter": "I&C,Mapping,Scanning,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..."
},
{
"id": 497,
"title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/",
"category": "Landscape Architecture, Natural Resources, Site Design",
"filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..."
},
{
"id": 496,
"title": "Milwaukee River Flushing Station Foundation Restoration",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/",
"category": "Landscape Architecture, Site Design, Structural",
"filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..."
},
{
"id": 495,
"title": "Ishnala Trail Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/",
"category": "Structural",
"filter": "Bridges",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..."
},
{
"id": 494,
"title": "Glacier Hills Wind Park",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/",
"category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey",
"filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..."
},
{
"id": 493,
"title": "Gas Main Replacement",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/",
"category": "Municipal, Planning, Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..."
},
{
"id": 492,
"title": "School District Master Planning",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/",
"category": "Landscape Architecture, Planning, Site Design, Survey",
"filter": "Athletics,Civic,Education,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..."
},
{
"id": 491,
"title": "Conveyance Gate Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/",
"category": "Electrical, Structural, Water Services",
"filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..."
},
{
"id": 490,
"title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/",
"category": "Electrical, Water Services",
"filter": "Buildings,I&C,Power Distribution,Treatment Plant",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..."
},
{
"id": 489,
"title": "We Energies Environmental Training",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/",
"category": "Environmental, Natural Resources, Power & Energy",
"filter": "Erosion Control,Permitting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..."
},
{
"id": 488,
"title": "Coal Pile Runoff and Air Quality",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/",
"category": "Electrical, Power & Energy",
"filter": "BIM,Mapping,Scanning,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..."
},
{
"id": 487,
"title": "General Mitchell International Airport (GMIA) Redundant Feeder",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/",
"category": "Electrical, Site Design",
"filter": "Buildings,Power Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..."
},
{
"id": 486,
"title": "Zoo Interchange Lighting",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/",
"category": "Electrical",
"filter": "Lighting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..."
},
{
"id": 485,
"title": "Winnebago Street Roundabout",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/",
"category": "Landscape Architecture, Transportation",
"filter": "Intersection,Local Roads,Reconstruction,Roundabout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..."
},
{
"id": 484,
"title": "I-94 North-South Public Involvement GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/",
"category": "GIS, Transportation",
"filter": "Bridges,Interchange,Interstate,Reconstruction",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..."
},
{
"id": 483,
"title": "Kapur Internal Multi-Office GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/",
"category": "GIS",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania",
"xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..."
},
{
"id": 482,
"title": "Lakeshore Lateral Pipeline GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/",
"category": "GIS, Power & Energy, Survey, UAV",
"filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..."
},
{
"id": 481,
"title": "Schlitz Park Brewtown Square",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/schlitz-park-brewtown-square\/",
"category": "Landscape Architecture, Site Design",
"filter": "Corporate,Green Space,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5144.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Undeveloped property in downtown Milwaukee is at a premium. Without room for urban expansion, out-of-the-box alternatives are necessary to develop this area of the city. ..."
},
{
"id": 480,
"title": "Milwaukee School of Engineering (MSOE) Athletic Complex",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-school-of-engineering-msoe-athletic-complex\/",
"category": "Landscape Architecture, Site Design",
"filter": "Athletics,Education,Mixed Use",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Pocket-Park-scaled.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When MSOE dreamed of a state-of-the-art athletic facility, Drs. Robert and Patricia Kern met the challenge by providing funds to acquire the land for the ..."
},
{
"id": 479,
"title": "Village of Darien GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/village-of-darien-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/darien3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur is the\u00a0primary provider of engineering services for the Village of Darien. When Kapur was\u00a0awarded its first street reconstruction project with the Village of Darien ..."
},
{
"id": 478,
"title": "City of Burlington GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-burlington-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Burlington_GIS2_Floodplain.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was in the process of collecting data for an old and rudimentary GIS when the City of Burlington decided to upgrade the site. Presented ..."
},
{
"id": 477,
"title": "Zoo Interchange GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-gis\/",
"category": "Environmental, GIS, Survey, Transportation",
"filter": "Asset Management,Custom Software Tools,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Zoo-Web-GIS-Screen_Utilities_1.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange was a massive project reconstructing the I-94 and I-41 interchange in Milwaukee and Waukesha Counties in Wisconsin. A project this large required ..."
},
{
"id": 476,
"title": "We Energies Gas Laterals",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-gas-laterals\/",
"category": "GIS, Planning, Power & Energy, Survey",
"filter": "Custom Software Tools,Easements,Extranet Applications,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/gis-nwl-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur won the design and survey contract for three separate laterals in Northwest Wisconsin. As part of the design solution, Kapur developed a GIS system ..."
},
{
"id": 475,
"title": "City of Lake Geneva GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-lake-geneva-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Custom Software Tools,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LG_DNRMonitoringSitesEx.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Prior to serving as the Engineer of Record for the City of Lake Geneva, we conducted a thorough analysis of the city’s existing GIS structure ..."
},
{
"id": 474,
"title": "Downtown Wayfinding",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/downtown-wayfinding\/",
"category": "Municipal",
"filter": "Asset Management,Civic,Local Roads,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/20191029_151822.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When Kapur was selected as the Engineer of Record for the City of Lake Geneva, one of the first projects we delivered was an updated ..."
},
{
"id": 473,
"title": "Civic Campus Redevelopment",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/civic-campus-redevelopment\/",
"category": "Landscape Architecture, Municipal, Site Design",
"filter": "Civic,Green Space,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A0526.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "For many years the Village of Mount Pleasant, Wisconsin, staff worked in a cramped, outdated, urban property set in the retail-first area of the village."
},
{
"id": 472,
"title": "Milwaukee Bucks Arena District Site Design",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-bucks-arena-district-site-design\/",
"category": "Landscape Architecture, Site Design",
"filter": "Athletics,Commercial,Green Space,Hospitality,Mapping,Mixed Use,Scanning,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/2022-Fiserv-Forum-Deer-District_1.png",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Bucks had outgrown their dated facility, so the team began searching for a new location and assembling a team to assist with planning ..."
},
{
"id": 471,
"title": "The Corners of Brookfield Retail Development",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/the-corners-of-brookfield-retail-development\/",
"category": "Landscape Architecture, Site Design, Structural, Survey",
"filter": "ALTA\/CSM,Commercial,Easements,Green Space,Hospitality,Mixed Use,Study,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Von-Maur-1.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The client, Marcus Corporation, aimed to create a space based on the Suburban Town Center model in Brookfield, Wisconsin, west of the City of Milwaukee.Marcus ..."
},
{
"id": 470,
"title": "Cristo Rey Jesuit High School Environmental Investigation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/cristo-rey-jesuit-high-school-environmental-investigation\/",
"category": "Environmental, Site Design, Survey",
"filter": "Remediation,Site Assessment,Site Investigation,UST",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_0269.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "After first retaining Kapur for site design services, Cristo Rey Jesuit High School later selected Kapur to also provide environmental consulting for the redevelopment of ..."
},
{
"id": 469,
"title": "Harbor View Lofts Environmental Investigation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/harbor-view-lofts-environmental-investigation\/",
"category": "Environmental, Survey",
"filter": "Remediation,Site Assessment,Site Investigation,UST",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/34.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "As part of a property acquisition, LCM Funds selected Kapur to provide a Phase I Environmental Site Assessment (ESA).The Phase I ESA revealed the site ..."
},
{
"id": 468,
"title": "Environmental Services for the Foxconn Development",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/environmental-services-for-the-foxconn-development\/",
"category": "Environmental, Survey",
"filter": "Asbestos,Lead,Remediation,Site Assessment,Site Investigation,UST",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_3903.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Village of Mount Pleasant selected Kapur to provide environmental consulting to facilitate the demolition of residential and commercial properties acquired by the Village in ..."
},
{
"id": 467,
"title": "Former Pallet Company Environmental Site Assessment",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/former-pallet-company-environmental-site-assessment\/",
"category": "Environmental, Survey",
"filter": "Remediation,Site Assessment,Site Investigation",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Wetenkamp1.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was selected by the lender to provide a Records Search with Risk Assessment (RSRA) for the former Wetenkamp Pallet Company property in Newton, Wisconsin, ..."
},
{
"id": 466,
"title": "Lift Station Design",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lift-station-design\/",
"category": "Construction Management, Electrical, Municipal, Natural Resources, Planning, Site Design, Survey",
"filter": "I&C,Sanitary Sewer,SCADA",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_5151.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The City of Plymouth, Wisconsin, planned to improve two lift stations and add a third to resolve issues with high flows within their sanitary sewer ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
},
{
"id": 499,
"title": "Salt Dome, Brine Building, and Maintenance Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/",
"category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural",
"filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..."
},
{
"id": 498,
"title": "Linwood Water Tunnel",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/",
"category": "LiDAR, Structural, Survey, Water Services",
"filter": "I&C,Mapping,Scanning,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..."
},
{
"id": 497,
"title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/",
"category": "Landscape Architecture, Natural Resources, Site Design",
"filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..."
},
{
"id": 496,
"title": "Milwaukee River Flushing Station Foundation Restoration",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/",
"category": "Landscape Architecture, Site Design, Structural",
"filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..."
},
{
"id": 495,
"title": "Ishnala Trail Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/",
"category": "Structural",
"filter": "Bridges",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..."
},
{
"id": 494,
"title": "Glacier Hills Wind Park",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/",
"category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey",
"filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..."
},
{
"id": 493,
"title": "Gas Main Replacement",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/",
"category": "Municipal, Planning, Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..."
},
{
"id": 492,
"title": "School District Master Planning",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/",
"category": "Landscape Architecture, Planning, Site Design, Survey",
"filter": "Athletics,Civic,Education,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..."
},
{
"id": 491,
"title": "Conveyance Gate Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/",
"category": "Electrical, Structural, Water Services",
"filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..."
},
{
"id": 490,
"title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/",
"category": "Electrical, Water Services",
"filter": "Buildings,I&C,Power Distribution,Treatment Plant",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..."
},
{
"id": 489,
"title": "We Energies Environmental Training",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/",
"category": "Environmental, Natural Resources, Power & Energy",
"filter": "Erosion Control,Permitting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..."
},
{
"id": 488,
"title": "Coal Pile Runoff and Air Quality",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/",
"category": "Electrical, Power & Energy",
"filter": "BIM,Mapping,Scanning,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..."
},
{
"id": 487,
"title": "General Mitchell International Airport (GMIA) Redundant Feeder",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/",
"category": "Electrical, Site Design",
"filter": "Buildings,Power Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..."
},
{
"id": 486,
"title": "Zoo Interchange Lighting",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/",
"category": "Electrical",
"filter": "Lighting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..."
},
{
"id": 485,
"title": "Winnebago Street Roundabout",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/",
"category": "Landscape Architecture, Transportation",
"filter": "Intersection,Local Roads,Reconstruction,Roundabout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..."
},
{
"id": 484,
"title": "I-94 North-South Public Involvement GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/",
"category": "GIS, Transportation",
"filter": "Bridges,Interchange,Interstate,Reconstruction",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..."
},
{
"id": 483,
"title": "Kapur Internal Multi-Office GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/",
"category": "GIS",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania",
"xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..."
},
{
"id": 482,
"title": "Lakeshore Lateral Pipeline GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/",
"category": "GIS, Power & Energy, Survey, UAV",
"filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..."
},
{
"id": 481,
"title": "Schlitz Park Brewtown Square",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/schlitz-park-brewtown-square\/",
"category": "Landscape Architecture, Site Design",
"filter": "Corporate,Green Space,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5144.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Undeveloped property in downtown Milwaukee is at a premium. Without room for urban expansion, out-of-the-box alternatives are necessary to develop this area of the city. ..."
},
{
"id": 480,
"title": "Milwaukee School of Engineering (MSOE) Athletic Complex",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-school-of-engineering-msoe-athletic-complex\/",
"category": "Landscape Architecture, Site Design",
"filter": "Athletics,Education,Mixed Use",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Pocket-Park-scaled.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When MSOE dreamed of a state-of-the-art athletic facility, Drs. Robert and Patricia Kern met the challenge by providing funds to acquire the land for the ..."
},
{
"id": 479,
"title": "Village of Darien GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/village-of-darien-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/darien3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur is the\u00a0primary provider of engineering services for the Village of Darien. When Kapur was\u00a0awarded its first street reconstruction project with the Village of Darien ..."
},
{
"id": 478,
"title": "City of Burlington GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-burlington-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Burlington_GIS2_Floodplain.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was in the process of collecting data for an old and rudimentary GIS when the City of Burlington decided to upgrade the site. Presented ..."
},
{
"id": 477,
"title": "Zoo Interchange GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-gis\/",
"category": "Environmental, GIS, Survey, Transportation",
"filter": "Asset Management,Custom Software Tools,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Zoo-Web-GIS-Screen_Utilities_1.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange was a massive project reconstructing the I-94 and I-41 interchange in Milwaukee and Waukesha Counties in Wisconsin. A project this large required ..."
},
{
"id": 476,
"title": "We Energies Gas Laterals",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-gas-laterals\/",
"category": "GIS, Planning, Power & Energy, Survey",
"filter": "Custom Software Tools,Easements,Extranet Applications,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/gis-nwl-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur won the design and survey contract for three separate laterals in Northwest Wisconsin. As part of the design solution, Kapur developed a GIS system ..."
},
{
"id": 475,
"title": "City of Lake Geneva GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-lake-geneva-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Custom Software Tools,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LG_DNRMonitoringSitesEx.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Prior to serving as the Engineer of Record for the City of Lake Geneva, we conducted a thorough analysis of the city’s existing GIS structure ..."
},
{
"id": 474,
"title": "Downtown Wayfinding",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/downtown-wayfinding\/",
"category": "Municipal",
"filter": "Asset Management,Civic,Local Roads,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/20191029_151822.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When Kapur was selected as the Engineer of Record for the City of Lake Geneva, one of the first projects we delivered was an updated ..."
},
{
"id": 473,
"title": "Civic Campus Redevelopment",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/civic-campus-redevelopment\/",
"category": "Landscape Architecture, Municipal, Site Design",
"filter": "Civic,Green Space,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A0526.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "For many years the Village of Mount Pleasant, Wisconsin, staff worked in a cramped, outdated, urban property set in the retail-first area of the village."
},
{
"id": 472,
"title": "Milwaukee Bucks Arena District Site Design",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-bucks-arena-district-site-design\/",
"category": "Landscape Architecture, Site Design",
"filter": "Athletics,Commercial,Green Space,Hospitality,Mapping,Mixed Use,Scanning,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/2022-Fiserv-Forum-Deer-District_1.png",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Bucks had outgrown their dated facility, so the team began searching for a new location and assembling a team to assist with planning ..."
},
{
"id": 471,
"title": "The Corners of Brookfield Retail Development",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/the-corners-of-brookfield-retail-development\/",
"category": "Landscape Architecture, Site Design, Structural, Survey",
"filter": "ALTA\/CSM,Commercial,Easements,Green Space,Hospitality,Mixed Use,Study,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Von-Maur-1.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The client, Marcus Corporation, aimed to create a space based on the Suburban Town Center model in Brookfield, Wisconsin, west of the City of Milwaukee.Marcus ..."
},
{
"id": 470,
"title": "Cristo Rey Jesuit High School Environmental Investigation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/cristo-rey-jesuit-high-school-environmental-investigation\/",
"category": "Environmental, Site Design, Survey",
"filter": "Remediation,Site Assessment,Site Investigation,UST",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_0269.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "After first retaining Kapur for site design services, Cristo Rey Jesuit High School later selected Kapur to also provide environmental consulting for the redevelopment of ..."
},
{
"id": 469,
"title": "Harbor View Lofts Environmental Investigation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/harbor-view-lofts-environmental-investigation\/",
"category": "Environmental, Survey",
"filter": "Remediation,Site Assessment,Site Investigation,UST",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/34.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "As part of a property acquisition, LCM Funds selected Kapur to provide a Phase I Environmental Site Assessment (ESA).The Phase I ESA revealed the site ..."
},
{
"id": 468,
"title": "Environmental Services for the Foxconn Development",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/environmental-services-for-the-foxconn-development\/",
"category": "Environmental, Survey",
"filter": "Asbestos,Lead,Remediation,Site Assessment,Site Investigation,UST",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_3903.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Village of Mount Pleasant selected Kapur to provide environmental consulting to facilitate the demolition of residential and commercial properties acquired by the Village in ..."
},
{
"id": 467,
"title": "Former Pallet Company Environmental Site Assessment",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/former-pallet-company-environmental-site-assessment\/",
"category": "Environmental, Survey",
"filter": "Remediation,Site Assessment,Site Investigation",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Wetenkamp1.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was selected by the lender to provide a Records Search with Risk Assessment (RSRA) for the former Wetenkamp Pallet Company property in Newton, Wisconsin, ..."
},
{
"id": 466,
"title": "Lift Station Design",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lift-station-design\/",
"category": "Construction Management, Electrical, Municipal, Natural Resources, Planning, Site Design, Survey",
"filter": "I&C,Sanitary Sewer,SCADA",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_5151.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The City of Plymouth, Wisconsin, planned to improve two lift stations and add a third to resolve issues with high flows within their sanitary sewer ..."
},
{
"id": 465,
"title": "Village-Wide Stormwater Management",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/village-wide-stormwater-management\/",
"category": "Municipal, Site Design",
"filter": "Rehabilitation,Storm Sewer,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Bayside-5.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Village of Bayside has a challenging, flat topography with clay soil composition that makes the design of efficient stormwater facilities critical to flood prevention. ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
},
{
"id": 499,
"title": "Salt Dome, Brine Building, and Maintenance Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/",
"category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural",
"filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..."
},
{
"id": 498,
"title": "Linwood Water Tunnel",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/",
"category": "LiDAR, Structural, Survey, Water Services",
"filter": "I&C,Mapping,Scanning,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..."
},
{
"id": 497,
"title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/",
"category": "Landscape Architecture, Natural Resources, Site Design",
"filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..."
},
{
"id": 496,
"title": "Milwaukee River Flushing Station Foundation Restoration",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/",
"category": "Landscape Architecture, Site Design, Structural",
"filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..."
},
{
"id": 495,
"title": "Ishnala Trail Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/",
"category": "Structural",
"filter": "Bridges",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..."
},
{
"id": 494,
"title": "Glacier Hills Wind Park",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/",
"category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey",
"filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..."
},
{
"id": 493,
"title": "Gas Main Replacement",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/",
"category": "Municipal, Planning, Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..."
},
{
"id": 492,
"title": "School District Master Planning",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/",
"category": "Landscape Architecture, Planning, Site Design, Survey",
"filter": "Athletics,Civic,Education,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..."
},
{
"id": 491,
"title": "Conveyance Gate Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/",
"category": "Electrical, Structural, Water Services",
"filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..."
},
{
"id": 490,
"title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/",
"category": "Electrical, Water Services",
"filter": "Buildings,I&C,Power Distribution,Treatment Plant",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..."
},
{
"id": 489,
"title": "We Energies Environmental Training",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/",
"category": "Environmental, Natural Resources, Power & Energy",
"filter": "Erosion Control,Permitting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..."
},
{
"id": 488,
"title": "Coal Pile Runoff and Air Quality",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/",
"category": "Electrical, Power & Energy",
"filter": "BIM,Mapping,Scanning,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..."
},
{
"id": 487,
"title": "General Mitchell International Airport (GMIA) Redundant Feeder",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/",
"category": "Electrical, Site Design",
"filter": "Buildings,Power Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..."
},
{
"id": 486,
"title": "Zoo Interchange Lighting",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/",
"category": "Electrical",
"filter": "Lighting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..."
},
{
"id": 485,
"title": "Winnebago Street Roundabout",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/",
"category": "Landscape Architecture, Transportation",
"filter": "Intersection,Local Roads,Reconstruction,Roundabout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..."
},
{
"id": 484,
"title": "I-94 North-South Public Involvement GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/",
"category": "GIS, Transportation",
"filter": "Bridges,Interchange,Interstate,Reconstruction",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..."
},
{
"id": 483,
"title": "Kapur Internal Multi-Office GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/",
"category": "GIS",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania",
"xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..."
},
{
"id": 482,
"title": "Lakeshore Lateral Pipeline GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/",
"category": "GIS, Power & Energy, Survey, UAV",
"filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..."
},
{
"id": 481,
"title": "Schlitz Park Brewtown Square",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/schlitz-park-brewtown-square\/",
"category": "Landscape Architecture, Site Design",
"filter": "Corporate,Green Space,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5144.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Undeveloped property in downtown Milwaukee is at a premium. Without room for urban expansion, out-of-the-box alternatives are necessary to develop this area of the city. ..."
},
{
"id": 480,
"title": "Milwaukee School of Engineering (MSOE) Athletic Complex",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-school-of-engineering-msoe-athletic-complex\/",
"category": "Landscape Architecture, Site Design",
"filter": "Athletics,Education,Mixed Use",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Pocket-Park-scaled.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When MSOE dreamed of a state-of-the-art athletic facility, Drs. Robert and Patricia Kern met the challenge by providing funds to acquire the land for the ..."
},
{
"id": 479,
"title": "Village of Darien GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/village-of-darien-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/darien3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur is the\u00a0primary provider of engineering services for the Village of Darien. When Kapur was\u00a0awarded its first street reconstruction project with the Village of Darien ..."
},
{
"id": 478,
"title": "City of Burlington GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-burlington-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Burlington_GIS2_Floodplain.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was in the process of collecting data for an old and rudimentary GIS when the City of Burlington decided to upgrade the site. Presented ..."
},
{
"id": 477,
"title": "Zoo Interchange GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-gis\/",
"category": "Environmental, GIS, Survey, Transportation",
"filter": "Asset Management,Custom Software Tools,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Zoo-Web-GIS-Screen_Utilities_1.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange was a massive project reconstructing the I-94 and I-41 interchange in Milwaukee and Waukesha Counties in Wisconsin. A project this large required ..."
},
{
"id": 476,
"title": "We Energies Gas Laterals",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-gas-laterals\/",
"category": "GIS, Planning, Power & Energy, Survey",
"filter": "Custom Software Tools,Easements,Extranet Applications,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/gis-nwl-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur won the design and survey contract for three separate laterals in Northwest Wisconsin. As part of the design solution, Kapur developed a GIS system ..."
},
{
"id": 475,
"title": "City of Lake Geneva GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-lake-geneva-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Custom Software Tools,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LG_DNRMonitoringSitesEx.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Prior to serving as the Engineer of Record for the City of Lake Geneva, we conducted a thorough analysis of the city’s existing GIS structure ..."
},
{
"id": 474,
"title": "Downtown Wayfinding",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/downtown-wayfinding\/",
"category": "Municipal",
"filter": "Asset Management,Civic,Local Roads,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/20191029_151822.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When Kapur was selected as the Engineer of Record for the City of Lake Geneva, one of the first projects we delivered was an updated ..."
},
{
"id": 473,
"title": "Civic Campus Redevelopment",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/civic-campus-redevelopment\/",
"category": "Landscape Architecture, Municipal, Site Design",
"filter": "Civic,Green Space,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A0526.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "For many years the Village of Mount Pleasant, Wisconsin, staff worked in a cramped, outdated, urban property set in the retail-first area of the village."
},
{
"id": 472,
"title": "Milwaukee Bucks Arena District Site Design",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-bucks-arena-district-site-design\/",
"category": "Landscape Architecture, Site Design",
"filter": "Athletics,Commercial,Green Space,Hospitality,Mapping,Mixed Use,Scanning,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/2022-Fiserv-Forum-Deer-District_1.png",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Bucks had outgrown their dated facility, so the team began searching for a new location and assembling a team to assist with planning ..."
},
{
"id": 471,
"title": "The Corners of Brookfield Retail Development",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/the-corners-of-brookfield-retail-development\/",
"category": "Landscape Architecture, Site Design, Structural, Survey",
"filter": "ALTA\/CSM,Commercial,Easements,Green Space,Hospitality,Mixed Use,Study,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Von-Maur-1.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The client, Marcus Corporation, aimed to create a space based on the Suburban Town Center model in Brookfield, Wisconsin, west of the City of Milwaukee.Marcus ..."
},
{
"id": 470,
"title": "Cristo Rey Jesuit High School Environmental Investigation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/cristo-rey-jesuit-high-school-environmental-investigation\/",
"category": "Environmental, Site Design, Survey",
"filter": "Remediation,Site Assessment,Site Investigation,UST",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_0269.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "After first retaining Kapur for site design services, Cristo Rey Jesuit High School later selected Kapur to also provide environmental consulting for the redevelopment of ..."
},
{
"id": 469,
"title": "Harbor View Lofts Environmental Investigation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/harbor-view-lofts-environmental-investigation\/",
"category": "Environmental, Survey",
"filter": "Remediation,Site Assessment,Site Investigation,UST",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/34.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "As part of a property acquisition, LCM Funds selected Kapur to provide a Phase I Environmental Site Assessment (ESA).The Phase I ESA revealed the site ..."
},
{
"id": 468,
"title": "Environmental Services for the Foxconn Development",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/environmental-services-for-the-foxconn-development\/",
"category": "Environmental, Survey",
"filter": "Asbestos,Lead,Remediation,Site Assessment,Site Investigation,UST",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_3903.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Village of Mount Pleasant selected Kapur to provide environmental consulting to facilitate the demolition of residential and commercial properties acquired by the Village in ..."
},
{
"id": 467,
"title": "Former Pallet Company Environmental Site Assessment",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/former-pallet-company-environmental-site-assessment\/",
"category": "Environmental, Survey",
"filter": "Remediation,Site Assessment,Site Investigation",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Wetenkamp1.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was selected by the lender to provide a Records Search with Risk Assessment (RSRA) for the former Wetenkamp Pallet Company property in Newton, Wisconsin, ..."
},
{
"id": 466,
"title": "Lift Station Design",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lift-station-design\/",
"category": "Construction Management, Electrical, Municipal, Natural Resources, Planning, Site Design, Survey",
"filter": "I&C,Sanitary Sewer,SCADA",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_5151.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The City of Plymouth, Wisconsin, planned to improve two lift stations and add a third to resolve issues with high flows within their sanitary sewer ..."
},
{
"id": 465,
"title": "Village-Wide Stormwater Management",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/village-wide-stormwater-management\/",
"category": "Municipal, Site Design",
"filter": "Rehabilitation,Storm Sewer,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Bayside-5.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Village of Bayside has a challenging, flat topography with clay soil composition that makes the design of efficient stormwater facilities critical to flood prevention. ..."
},
{
"id": 464,
"title": "Sanitary Sewer Infiltration and Inflow (I&I) - Villages of Fox Point and Bayside",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/sanitary-sewer-infiltration-and-inflow-ii-village-of-fox-point-and-village-of-bayside\/",
"category": "Municipal",
"filter": "Rehabilitation,Sanitary Sewer,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/011.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The villages of Fox Point and Bayside experience some of the most I&I in the Milwaukee Metropolitan Sewerage District (MMSD) service area. Defects in pipes, ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
},
{
"id": 499,
"title": "Salt Dome, Brine Building, and Maintenance Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/",
"category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural",
"filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..."
},
{
"id": 498,
"title": "Linwood Water Tunnel",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/",
"category": "LiDAR, Structural, Survey, Water Services",
"filter": "I&C,Mapping,Scanning,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..."
},
{
"id": 497,
"title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/",
"category": "Landscape Architecture, Natural Resources, Site Design",
"filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..."
},
{
"id": 496,
"title": "Milwaukee River Flushing Station Foundation Restoration",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/",
"category": "Landscape Architecture, Site Design, Structural",
"filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..."
},
{
"id": 495,
"title": "Ishnala Trail Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/",
"category": "Structural",
"filter": "Bridges",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..."
},
{
"id": 494,
"title": "Glacier Hills Wind Park",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/",
"category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey",
"filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..."
},
{
"id": 493,
"title": "Gas Main Replacement",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/",
"category": "Municipal, Planning, Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..."
},
{
"id": 492,
"title": "School District Master Planning",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/",
"category": "Landscape Architecture, Planning, Site Design, Survey",
"filter": "Athletics,Civic,Education,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..."
},
{
"id": 491,
"title": "Conveyance Gate Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/",
"category": "Electrical, Structural, Water Services",
"filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..."
},
{
"id": 490,
"title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/",
"category": "Electrical, Water Services",
"filter": "Buildings,I&C,Power Distribution,Treatment Plant",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..."
},
{
"id": 489,
"title": "We Energies Environmental Training",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/",
"category": "Environmental, Natural Resources, Power & Energy",
"filter": "Erosion Control,Permitting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..."
},
{
"id": 488,
"title": "Coal Pile Runoff and Air Quality",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/",
"category": "Electrical, Power & Energy",
"filter": "BIM,Mapping,Scanning,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..."
},
{
"id": 487,
"title": "General Mitchell International Airport (GMIA) Redundant Feeder",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/",
"category": "Electrical, Site Design",
"filter": "Buildings,Power Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..."
},
{
"id": 486,
"title": "Zoo Interchange Lighting",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/",
"category": "Electrical",
"filter": "Lighting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 miles of local streets in Milwaukee, Wisconsin. The project includes ..."
},
{
"id": 485,
"title": "Winnebago Street Roundabout",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/winnebago-street-roundabout\/",
"category": "Landscape Architecture, Transportation",
"filter": "Intersection,Local Roads,Reconstruction,Roundabout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5269.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "For many years, the north end of downtown Milwaukee was bordered by the Park East Freeway spur, a 1-mile six-lane divided freeway originally intended to ..."
},
{
"id": 484,
"title": "I-94 North-South Public Involvement GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-94-north-south-public-involvement-gis\/",
"category": "GIS, Transportation",
"filter": "Bridges,Interchange,Interstate,Reconstruction",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IH94NS_AddContactWF.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The origin of this project was to create a simple mailing list for multiple transportation projects related to the Foxconn development in Southeastern Wisconsin. This ..."
},
{
"id": 483,
"title": "Kapur Internal Multi-Office GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/kapur-internal-multi-office-gis\/",
"category": "GIS",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/OfficeGISWebsite02.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin,Illinois,Indiana,Kentucky,Pennsylvania",
"xcrpt_txt": "Kapur is growing rapidly. We are adding new offices and staff, and relocating team members as needed. Consequently, it can become difficult, especially for new ..."
},
{
"id": 482,
"title": "Lakeshore Lateral Pipeline GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakeshore-lateral-pipeline-gis\/",
"category": "GIS, Power & Energy, Survey, UAV",
"filter": "Easements,Gas Distribution,Mapping,Scanning,Staking & Layout,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LCIP_DurandInt.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur provided a GIS website, mapping two potential routes for the We Energies Lakeshore Lateral Pipeline totaling 90+ miles through Racine, Kenosha, and Walworth Counties ..."
},
{
"id": 481,
"title": "Schlitz Park Brewtown Square",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/schlitz-park-brewtown-square\/",
"category": "Landscape Architecture, Site Design",
"filter": "Corporate,Green Space,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_5144.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Undeveloped property in downtown Milwaukee is at a premium. Without room for urban expansion, out-of-the-box alternatives are necessary to develop this area of the city. ..."
},
{
"id": 480,
"title": "Milwaukee School of Engineering (MSOE) Athletic Complex",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-school-of-engineering-msoe-athletic-complex\/",
"category": "Landscape Architecture, Site Design",
"filter": "Athletics,Education,Mixed Use",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Pocket-Park-scaled.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When MSOE dreamed of a state-of-the-art athletic facility, Drs. Robert and Patricia Kern met the challenge by providing funds to acquire the land for the ..."
},
{
"id": 479,
"title": "Village of Darien GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/village-of-darien-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/darien3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur is the\u00a0primary provider of engineering services for the Village of Darien. When Kapur was\u00a0awarded its first street reconstruction project with the Village of Darien ..."
},
{
"id": 478,
"title": "City of Burlington GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-burlington-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Asset Management,Custom Software Tools,Extranet Applications,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Burlington_GIS2_Floodplain.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was in the process of collecting data for an old and rudimentary GIS when the City of Burlington decided to upgrade the site. Presented ..."
},
{
"id": 477,
"title": "Zoo Interchange GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-gis\/",
"category": "Environmental, GIS, Survey, Transportation",
"filter": "Asset Management,Custom Software Tools,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Zoo-Web-GIS-Screen_Utilities_1.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange was a massive project reconstructing the I-94 and I-41 interchange in Milwaukee and Waukesha Counties in Wisconsin. A project this large required ..."
},
{
"id": 476,
"title": "We Energies Gas Laterals",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-gas-laterals\/",
"category": "GIS, Planning, Power & Energy, Survey",
"filter": "Custom Software Tools,Easements,Extranet Applications,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/gis-nwl-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur won the design and survey contract for three separate laterals in Northwest Wisconsin. As part of the design solution, Kapur developed a GIS system ..."
},
{
"id": 475,
"title": "City of Lake Geneva GIS",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/city-of-lake-geneva-gis\/",
"category": "GIS, Municipal, Survey",
"filter": "Custom Software Tools,Records Modernization,Web Development",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/LG_DNRMonitoringSitesEx.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Prior to serving as the Engineer of Record for the City of Lake Geneva, we conducted a thorough analysis of the city’s existing GIS structure ..."
},
{
"id": 474,
"title": "Downtown Wayfinding",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/downtown-wayfinding\/",
"category": "Municipal",
"filter": "Asset Management,Civic,Local Roads,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/20191029_151822.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When Kapur was selected as the Engineer of Record for the City of Lake Geneva, one of the first projects we delivered was an updated ..."
},
{
"id": 473,
"title": "Civic Campus Redevelopment",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/civic-campus-redevelopment\/",
"category": "Landscape Architecture, Municipal, Site Design",
"filter": "Civic,Green Space,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A0526.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "For many years the Village of Mount Pleasant, Wisconsin, staff worked in a cramped, outdated, urban property set in the retail-first area of the village."
},
{
"id": 472,
"title": "Milwaukee Bucks Arena District Site Design",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/milwaukee-bucks-arena-district-site-design\/",
"category": "Landscape Architecture, Site Design",
"filter": "Athletics,Commercial,Green Space,Hospitality,Mapping,Mixed Use,Scanning,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/2022-Fiserv-Forum-Deer-District_1.png",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Bucks had outgrown their dated facility, so the team began searching for a new location and assembling a team to assist with planning ..."
},
{
"id": 471,
"title": "The Corners of Brookfield Retail Development",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/the-corners-of-brookfield-retail-development\/",
"category": "Landscape Architecture, Site Design, Structural, Survey",
"filter": "ALTA\/CSM,Commercial,Easements,Green Space,Hospitality,Mixed Use,Study,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Von-Maur-1.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The client, Marcus Corporation, aimed to create a space based on the Suburban Town Center model in Brookfield, Wisconsin, west of the City of Milwaukee.Marcus ..."
},
{
"id": 470,
"title": "Cristo Rey Jesuit High School Environmental Investigation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/cristo-rey-jesuit-high-school-environmental-investigation\/",
"category": "Environmental, Site Design, Survey",
"filter": "Remediation,Site Assessment,Site Investigation,UST",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_0269.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "After first retaining Kapur for site design services, Cristo Rey Jesuit High School later selected Kapur to also provide environmental consulting for the redevelopment of ..."
},
{
"id": 469,
"title": "Harbor View Lofts Environmental Investigation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/harbor-view-lofts-environmental-investigation\/",
"category": "Environmental, Survey",
"filter": "Remediation,Site Assessment,Site Investigation,UST",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/34.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "As part of a property acquisition, LCM Funds selected Kapur to provide a Phase I Environmental Site Assessment (ESA).The Phase I ESA revealed the site ..."
},
{
"id": 468,
"title": "Environmental Services for the Foxconn Development",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/environmental-services-for-the-foxconn-development\/",
"category": "Environmental, Survey",
"filter": "Asbestos,Lead,Remediation,Site Assessment,Site Investigation,UST",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_3903.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Village of Mount Pleasant selected Kapur to provide environmental consulting to facilitate the demolition of residential and commercial properties acquired by the Village in ..."
},
{
"id": 467,
"title": "Former Pallet Company Environmental Site Assessment",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/former-pallet-company-environmental-site-assessment\/",
"category": "Environmental, Survey",
"filter": "Remediation,Site Assessment,Site Investigation",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Wetenkamp1.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was selected by the lender to provide a Records Search with Risk Assessment (RSRA) for the former Wetenkamp Pallet Company property in Newton, Wisconsin, ..."
},
{
"id": 466,
"title": "Lift Station Design",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lift-station-design\/",
"category": "Construction Management, Electrical, Municipal, Natural Resources, Planning, Site Design, Survey",
"filter": "I&C,Sanitary Sewer,SCADA",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_5151.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The City of Plymouth, Wisconsin, planned to improve two lift stations and add a third to resolve issues with high flows within their sanitary sewer ..."
},
{
"id": 465,
"title": "Village-Wide Stormwater Management",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/village-wide-stormwater-management\/",
"category": "Municipal, Site Design",
"filter": "Rehabilitation,Storm Sewer,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Bayside-5.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Village of Bayside has a challenging, flat topography with clay soil composition that makes the design of efficient stormwater facilities critical to flood prevention. ..."
},
{
"id": 464,
"title": "Sanitary Sewer Infiltration and Inflow (I&I) - Villages of Fox Point and Bayside",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/sanitary-sewer-infiltration-and-inflow-ii-village-of-fox-point-and-village-of-bayside\/",
"category": "Municipal",
"filter": "Rehabilitation,Sanitary Sewer,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/011.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The villages of Fox Point and Bayside experience some of the most I&I in the Milwaukee Metropolitan Sewerage District (MMSD) service area. Defects in pipes, ..."
},
{
"id": 463,
"title": "Allen Street",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/allen-street\/",
"category": "Construction Management, Municipal, Survey",
"filter": "Intersection,Lighting,Local Roads,Platting,Reconstruction",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/allen_st.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Allen Street was the main road through Random Lake’s historic downtown. This area was predominantly flat, which caused drainage issues and accelerated pavement deterioration. Like ..."
}
][
{
"id": 2644,
"title": "New Dermatology Group - Iron Mountain Clinic",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/new-dermatology-group-iron-mountain-clinic\/",
"category": "Site Design",
"filter": "Commercial",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2023\/05\/20230507_130244-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Established as a single location by Dr. Kevan Lewis in 2012, The New Dermatology Group leveraged years of providing measurably superior, compassionate dermatology care into ..."
},
{
"id": 1944,
"title": "I-20 Ramp D Roadway and Bridge Construction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-20-ramp-d-roadway-and-bridge-construction\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/06\/IMG_20210519_080851131-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "As part of our overall staking and layout services on the Illinois Tollway I-20 Ramp D project for Dunnet Bay Construction, Kapur performed a LiDAR ..."
},
{
"id": 1676,
"title": "NAVFAC Great Lakes - Forrestal Village Sanitary Sewer Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/navfac-great-lakes-forrestal-village-sanitary-sewer-project\/",
"category": "Government Work, Quality Services",
"filter": "Sanitary Sewer,Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/GLNB4-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur is the designer for the team selected for this design-build project."
},
{
"id": 1660,
"title": "Naval Surface Warfare Center (NSWC) - Electronic Attack Test Range",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/electronic-attack-test-range\/",
"category": "Government Work",
"filter": "Quality Services",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2021\/02\/Crane-Aerial_314x225.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Kapur is the design quality manager for the design-build team selected for this $1.2 million project from October 2019 to the present. Our design quality ..."
},
{
"id": 1272,
"title": "Lake Street Bascule Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lake-street-bascule-bridge\/",
"category": "Survey",
"filter": "Bridges,Scanning,Settlement",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Lake Street Bridge is a double-deck bascule bridge that was built in the early 1900s. The bridge supports two lanes of traffic on its ..."
},
{
"id": 1128,
"title": "O'Hare International Airport - American Airlines GEM Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-airport-gem-buildling\/",
"category": "3D Modeling, Survey",
"filter": "AMG,BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/06\/2-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The construction of Runway 9C-27C required the existing ground equipment maintenance (GEM) facility to be relocated to accommodate the expansion."
},
{
"id": 1250,
"title": "I-74 Mississippi River Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-74-mississippi-river-bridge\/",
"category": "Survey",
"filter": "BIM,Bridges,Scanning,UAV",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/05\/imagejpeg_1.jpg",
"mbl_crp": "43 ",
"region": "Illinois",
"xcrpt_txt": "This project replaces the 100-year-old I-74 twin bridges over the Mississippi River with new twin basket-handle, true-arch bridges. The difficulties in successfully completing the staking ..."
},
{
"id": 1154,
"title": "Lakefront Trail Renovation Project",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/lakefront-trail-renovation-project\/",
"category": "Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/LFtrail1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "In 2016, the City of Chicago made the commitment to separate bike and pedestrian paths along the entire length of the Chicago Lakefront Trail. The ..."
},
{
"id": 1147,
"title": "I-294 Mile Long Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-294-mile-long-bridge\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "AMG,Scanning,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/294-1-e1591214354196.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The Mile Long Bridge project in Willow Springs, Illinois is a major part of the I-294 Tollway reconstruction. This portion of the Tri-State Tollway carries ..."
},
{
"id": 1137,
"title": "O\u2019Hare International Airport - Runway 9C",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-runway-9c\/",
"category": "3D Modeling, Survey",
"filter": "AMG,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/1st-hand-pours-on-taxiway-MM-1-scaled.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The project’s goal was to increase capacity in order to meet the high demand for travel through O’Hare International Airport. This section of the project ..."
},
{
"id": 1117,
"title": "O\u2019Hare International Airport - ARFF Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ohare-international-arff-facility\/",
"category": "3D Modeling, Survey",
"filter": "Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/ARFF2.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "The last 15 years of progress, as part of the O\u2019Hare Modernization Program (OMP), has included the relocation and addition of runways and taxiways. The ..."
},
{
"id": 1095,
"title": "41st Street Pedestrian Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/41st-street-pedestrian-bridge\/",
"category": "3D Modeling, Survey",
"filter": "BIM,Staking & Layout",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/41-Street-pedestrian-Bridge_Page_2-2-scaled.jpg",
"mbl_crp": "32 ",
"region": "Illinois",
"xcrpt_txt": "The City of Chicago had several neighborhoods that could see Lake Michigan but had no way to access the lakefront safely. To quote Mayor Rahm ..."
},
{
"id": 1080,
"title": "I-69 Reconstruction",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/i-69-kapur\/",
"category": "3D Modeling, LiDAR, Survey, UAV",
"filter": "AMG,Mapping,Scanning,Staking & Layout,Stringless,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2020\/02\/I-69_5-2.jpg",
"mbl_crp": "50 ",
"region": "Indiana",
"xcrpt_txt": "Under a public-private partnership agreement (P3), the State of Indiana hired a developer to upgrade 21 miles of State Road 37 (an existing four-lane divided ..."
},
{
"id": 503,
"title": "Peoples Gas Neighborhood Updates",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/peoples-gas-neighborhood-updates\/",
"category": "Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CR04446-P1-C1.png",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Under two master agreements, Kapur was awarded a three-year master contract in 2017 to perform survey and design services for Peoples Gas\/North Shore Gas on ..."
},
{
"id": 502,
"title": "Overhead to Underground Electrical Service Conversion",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/overhead-to-underground-electrical-service-conversion\/",
"category": "Electrical, Power & Energy",
"filter": "Electrical Distribution,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_1846.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Kapur was awarded this large conversion project in the Village of Greendale and City of Franklin, Wisconsin, under a master agreement with We Energies for ..."
},
{
"id": 501,
"title": "130th Street and Torrence Avenue Truss Move",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/130th-torrence-truss-move\/",
"category": "3D Modeling, Planning, Survey",
"filter": "AMG,BIM,Mapping,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/torrence2-1.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "This rail\/roadway reconstruction project eliminated the at-grade crossings of the two Norfolk Southern main tracks with 130th Street and Torrence Avenue.This was accomplished by lowering ..."
},
{
"id": 500,
"title": "Elgin I-290 Interchange",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/elgin-i-290-interchange\/",
"category": "3D Modeling, LiDAR, Survey",
"filter": "BIM,Mapping,UAV,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P1190474-scaled-e1591214069796.jpg",
"mbl_crp": "50 ",
"region": "Illinois",
"xcrpt_txt": "Kapur assisted Judlau Contracting in completing a site survey of the Elgin I-290 Interchange.Judlau was concerned with several spoil pits accumulating on site. Due to ..."
},
{
"id": 499,
"title": "Salt Dome, Brine Building, and Maintenance Facility",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/salt-dome-brine-building-and-maintenance-facility\/",
"category": "Electrical, Landscape Architecture, Municipal, Planning, Site Design, Structural",
"filter": "Boundary,Buildings,Civic,Lighting,Local Roads,Mapping",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/231A6966.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee County DPW Yard Improvements project was completed in 2016 as part of the Zoo Interchange project, which was funded through a land swap ..."
},
{
"id": 498,
"title": "Linwood Water Tunnel",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/linwood-water-tunnel\/",
"category": "LiDAR, Structural, Survey, Water Services",
"filter": "I&C,Mapping,Scanning,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/Linwood-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Originally constructed in 1920, this 1.3-mile tunnel is buried 80 to 120 feet below grade. The tunnel connects the Riverside pumping station to the Linwood ..."
},
{
"id": 497,
"title": "University of Wisconsin-Milwaukee (UWM) Innovation Campus",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/university-wisconsin-milwaukee-uwm-innovation-campus\/",
"category": "Landscape Architecture, Natural Resources, Site Design",
"filter": "Buildings,Commercial,Corporate,Education,Storm Sewer,Sustainability",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_1016.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "When UWM began planning for a research-based campus in 2006, they quickly identified several branches of engineering with close links between academia and industry.Biomedical and ..."
},
{
"id": 496,
"title": "Milwaukee River Flushing Station Foundation Restoration",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/foundation-restoration\/",
"category": "Landscape Architecture, Site Design, Structural",
"filter": "Buildings,Civic,Commercial,Foundations,Mapping,Scanning,Storm Sewer",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/100_0861-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee River Flushing Station was built in 1888 to pump millions of gallons of water from Lake Michigan to the Milwaukee River.In 2002, the ..."
},
{
"id": 495,
"title": "Ishnala Trail Bridge",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/ishnala-trail-bridge\/",
"category": "Structural",
"filter": "Bridges",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/ishnala-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "Located in the Wisconsin Dells area of Wisconsin, Mirror Lake State Park contains deep ravines, streams, lakes, and a canopy of mature deciduous trees.Situated within ..."
},
{
"id": 494,
"title": "Glacier Hills Wind Park",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/glacier-hills-wind-park\/",
"category": "Construction Management, GIS, Natural Resources, Power & Energy, Site Design, Survey",
"filter": "Easements,Electrical Distribution,Erosion Control,Intersection,Local Roads,Mapping,Permitting,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/power-glacier-4.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This We Energies project\u00a0includes 90 wind turbines situated throughout a 7,500-acre site\u00a0in the towns of Randolph and Scott in Columbia County, Wisconsin.This is the largest ..."
},
{
"id": 493,
"title": "Gas Main Replacement",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/gas-main-replacement\/",
"category": "Municipal, Planning, Power & Energy, Survey",
"filter": "Gas Distribution,Mapping,Scanning",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/KaukGas-2.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "This gas main replacement in the City of Kaukauna, Wisconsin, was a We Energies betterment of system project.The goal was to replace all of the ..."
},
{
"id": 492,
"title": "School District Master Planning",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/school-district-master-planning\/",
"category": "Landscape Architecture, Planning, Site Design, Survey",
"filter": "Athletics,Civic,Education,Study",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/E96A8375-38.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The School District of Brown Deer, Wisconsin, had been waiting for the right opportunity to propose a referendum for physical improvements to its schools. The ..."
},
{
"id": 491,
"title": "Conveyance Gate Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/conveyance-gate-rehabilitation\/",
"category": "Electrical, Structural, Water Services",
"filter": "I&C,Sanitary Sewer,Treatment Plant,Water Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/CIMG7244.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Milwaukee Metropolitan Sewerage District (MMSD) constantly monitors its network for aging infrastructure and equipment in need of rehabilitation or replacement. Timely rehabilitation, when warranted, ..."
},
{
"id": 490,
"title": "Jones Island Wastewater Treatment Plant (WWTP) Crane Rehabilitation",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/jones-island-wastewater-treatment-plant-wwtp-crane-rehabilitation\/",
"category": "Electrical, Water Services",
"filter": "Buildings,I&C,Power Distribution,Treatment Plant",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/JI-crane-3.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "At Jones Island WWTP, where the Milwaukee Metropolitan Sewage District’s deep tunnel ends, a stationary crane removes accumulated debris from the 300-feet-deep tunnel. In addition, ..."
},
{
"id": 489,
"title": "We Energies Environmental Training",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/we-energies-environmental-training\/",
"category": "Environmental, Natural Resources, Power & Energy",
"filter": "Erosion Control,Permitting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/P3020298.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "We Energies’ environmental commitment extends beyond just delivering renewable energy. They are proactive in protecting natural resources, our environment, and the wetlands and waterways that ..."
},
{
"id": 488,
"title": "Coal Pile Runoff and Air Quality",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/coal-pile-runoff-and-air-quality\/",
"category": "Electrical, Power & Energy",
"filter": "BIM,Mapping,Scanning,Visualizations",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/DSCN2128.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The We Energies Oak Creek Power Plant is the most efficient coal-powered plant in the Midwest and is required to be operating virtually non-stop. However, ..."
},
{
"id": 487,
"title": "General Mitchell International Airport (GMIA) Redundant Feeder",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/general-mitchell-international-airport-gmia-redundant-feeder\/",
"category": "Electrical, Site Design",
"filter": "Buildings,Power Distribution",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/IMG_6377.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "With the expansion of the terminal and the addition of a new parking structure, GMIA needed to improve reliability and continuity of electric power service ..."
},
{
"id": 486,
"title": "Zoo Interchange Lighting",
"linkz": "https:\/\/kapurengineers.com\/case-studies\/zoo-interchange-lighting\/",
"category": "Electrical",
"filter": "Lighting",
"header_image": "https:\/\/kapurengineers.com\/wp-content\/uploads\/2019\/11\/HN_ZOO_092418_0722.jpg",
"mbl_crp": "50 ",
"region": "Wisconsin",
"xcrpt_txt": "The Zoo Interchange is a massive project consisting of 9 miles of freeway and 12 mile